Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta"
INSTALLATION OF PAVED DRAINS AS SHOWN ON THE APPROVED GRADING PLAN. c....MANAGEMENT NS1 - WATER CONSTRUCTION PRACTICE NS2 - DEWATERING OPERATIONS NS3 -...
Last Modified: 11/14/2024
following activities: demolition, grading, foundations, building construction, paving...Tractor/Loader/Backhoe 1 78 40% 245 58 54 57 6 Welder 2 74 40% 250 57 53 56 6 ...
Last Modified: 01/07/2025
cement concrete, asphalt, brick, pavers, and similar impervious or semi-pervious paved...additional five (5) percent allowance for decorative brick sections or decorative...
Last Modified: 01/27/2022
A paved parking area had been developed on the east side of the property, with an...The west was developed with a vacant land and a large paved...
Last Modified: 07/09/2021
Showing 337 to 340 of 500 entries.