Search Results

Showing results for "dWA 0812 2782 5310 [[Pandawa]] Kontraktor Neon Hotel Cafe Wilayah Simo Boyolali"

No results were found that matched the keywords: dWA 0812 2782 5310 [[Pandawa]] Kontraktor Neon Hotel Cafe Wilayah Simo Boyolali.
Search Results

2023092023-FY-23-24-Fee-Schedule-Final.pdf

4.4096 $9,008 28 Chemicals and Allied Product Manufacturing (b) 0.0000 $2,492 70 Hotel...(Industrial) 1000 SF 1.9207 $3,924 70 Hotel with Dining...

Last Modified: 09/20/2023

Adopted FY 2025-26 FEE SCHEDULE - Final

4.4096 $9,008 28 Chemicals and Allied Product Manufacturing (b) 0.0000 $2,492 70 Hotel...(Industrial) 1000 SF 1.9207 $3,924 70 Hotel with Dining...

Last Modified: 08/07/2025

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

4.4096 $9,008 28 Chemicals and Allied Product Manufacturing (b) 0.0000 $2,492 70 Hotel...(Industrial) 1000 SF 1.9207 $3,924 70 Hotel with Dining...

Last Modified: 12/12/2025

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

4.4096 $9,008 28 Chemicals and Allied Product Manufacturing (b) 0.0000 $2,492 70 Hotel...(Industrial) 1000 SF 1.9207 $3,924 70 Hotel with Dining...

Last Modified: 09/04/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet