Showing results for "dWA 0812 2782 5310 Anggaran Dana Memasang Interior Set Kamar Ukir Daerah Kebakkramat Karanganyar"
where, each of the conditions have been addressed in the building permit plan set...reproduced on the construction document drawings as part of the Approved Construction...
Last Modified: 08/07/2024
LINES MATCH LINE ROOM LABEL CEILING HEIGHT SECTION DETAIL EXTERIOR ELEVATION INTERIOR...INTERIOR SIDE YARD, SECOND STORY THE EXISTING...
Last Modified: 07/22/2021
The interior side yard setbacks for the proposed first- and second-story addition...elevation are 5’-11” and 7’- 7” respectively, which meets the minimum required...
Last Modified: 12/28/2021
• Sets must be deemed complete....Enclosed accessible space under interior stair requires 1 layer of ½” gypsum board...Detail how the...
Last Modified: 03/26/2026
Showing 37 to 40 of 2,302 entries.