Search Results

Showing results for "dWA 0812 2782 5310 Anggaran Dana Memasang Interior Set Kamar Ukir Daerah Kebakkramat Karanganyar"

No results were found that matched the keywords: dWA 0812 2782 5310 Anggaran Dana Memasang Interior Set Kamar Ukir Daerah Kebakkramat Karanganyar.
Search Results

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 03/17/2026

Sizing Water Meter and Service Line Form

1 1 Laundry 1.5 1.5 Service or Mop Basin 1.5 3 Wash-up, each set...Laundry: Laundry1: Service or Mop Basin: Service or Mop Basin2: Washup each...

Last Modified: 11/15/2024

BWP Water ADU Plan Check Requirements (1).pdf

1 1 Laundry 1.5 1.5 Service or Mop Basin 1.5 3 Wash-up, each set...Laundry: Laundry1: Service or Mop Basin: Service or Mop Basin2: Washup each...

Last Modified: 12/22/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet