Search Results

Showing results for "dWA 0812 2782 5310 Pemasangan Kitchen Set Bawah Per Meter Minimalis Karanganyar Karanganyar"

No results were found that matched the keywords: dWA 0812 2782 5310 Pemasangan Kitchen Set Bawah Per Meter Minimalis Karanganyar Karanganyar.
Search Results

2025 NOV ISSUED

Per GAF ESR-4676. Subject to field inspector....REMODEL (E) KITCHEN & LAUNDRY (141 SF)....INSTALL (1) OUTLET FOR INDUCTION RANGE IN...

Last Modified: 12/01/2025

2022 BPAP Plan Check Correction List

• Sets must be complete....• See the marked-up set of plans for additional corrections....Lavatory faucets in common & public use areas 0.5 gpm @...

Last Modified: 11/15/2024

Apx F - Noise and Vibration Analysis Technical Memorandum

zones is set to 45 dBA Leq at night and 55 dBA Leq during the day....day, 7 days per week, without an operator on-site....day, 7 days...

Last Modified: 10/20/2026

ApxL2_UtilityInfrastructureTechnicalReport.pdf

Environmental Setting A....and a fire service meter....WATER METER EX. FIRE HYDRANT EX. FIRE HYDRANT EX. WATER...

Last Modified: 07/09/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet