Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"
As the project site is approximately 0.36-acre, the total allowable base number...As the project site is approximately 0.36-acre, the total...
Last Modified: 12/07/2023
Copper (g) 2.4 0.1 95% 5.7 0.4 94% Total Lead (g) 1.9 0.1 95% 5.1 0.3 94% Total...11.0 ac 3.7% of total 13.2 ac 4.5%...
Last Modified: 03/25/2021
If the project involves demolition and new construction, describe total project....separate exhibits 1 If the project involves demolition and new construction describe...
Last Modified: 03/31/2021
The total number of units in the Full Application has increased as compared to the...Notably, the base density of 20 units has not changed; the change in the...
Last Modified: 05/14/2024
Showing 565 to 568 of 2,302 entries.