Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"
_______ COPIES $1.00 for the first page, $.05 each additional page (Where the total
Last Modified: 09/11/2024
exceeding $500,000 in construction costs are required to allocate 1% of the project’s total
Last Modified: 04/14/2025
The total designated funds for design and construction of the Project is $3,299,105
Last Modified: 04/21/2026
The density bonus increase and resulting number of proposed total units is consistent...level would significantly limit the ability of the Project to accommodate the...
Last Modified: 11/04/2021
Showing 1,321 to 1,324 of 2,302 entries.