Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"
Final Date:Permit Status: CONVERT (E) 535.7 SF GARAGE TO ADU, ADD 295.35 SF FOR TOTAL...TOTAL ADU 731.1 SF $25,000.00Valuation: Issued...
Last Modified: 09/02/2025
City of Burbank Parks and Recreation Department does not distribute a cumulative total...$350 3/29, 4/5, 4/12, 4/19 4/25/2026 $200 $350 4/26, 5/3, 5/10, 5/17, 5/24 ...
Last Modified: 05/21/2026
weighted average yield of the portfolio at the end of the month is 1.33% and the total...| 15 % US Agency | 90 % US Treasury | No Limit 8,049,560 1.61 8,037,360 1.60 ...
Last Modified: 05/12/2022
weighted average yield of the portfolio at the end of the month is 1.23% and the total...| 15 % US Agency | 90 % US Treasury | No Limit 8,067,840 1.68 8,049,560 1.61 ...
Showing 1,541 to 1,544 of 2,304 entries.