Showing results for "dWA 0821 1305 0400 [[ADEFA]] Pusat Geocomposite Landfill di Pandeglang Banten"
There is no need to pothole the existing 12" DI waterline that connects to the...JB 136 Smiranda Burbank - BWP Water 10/16/2025 Plans 15 Utilities Plans 8"...
Last Modified: 07/20/2026
Contractor License Fee $91.67 Per Each Vehicle Used in the Business/Annual (I) Landfill...Outside public dumping not allowed to City's landfill.
Last Modified: 06/20/2022
Contractor License Fee $86.42 Per Each Vehicle Used in the Business/Annual (I) Landfill...Outside public dumping not allowed to City's...
Contractor License Fee $86.42 Per Each Vehicle Used in the Business/Annual (I) Landfill...Outside public dumping not allowed to City's landfill.
Showing 1,033 to 1,036 of 1,135 entries.