Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Agen Geocomposite Slope Proyek Bima Nusa Tenggara Barat"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Agen Geocomposite Slope Proyek Bima Nusa Tenggara Barat.
Search Results

BPAP G001 SHEET

(BMC 9-1-1-3305) The finish grade shall slope a min. of 5%, or 6”, to point 10 feet...Swales shall slope a minimum of 2%.

Last Modified: 11/15/2024

G01 SHEET

(BMC 9-1-1-3305) The finish grade shall slope a min. of 5%, or 6”, to point 10 feet...Swales shall slope a minimum of 2%.

Last Modified: 05/30/2024

Attachment 1.pdf

Driveway slope and transition shall be constructed per Burbank Standard Plan BT-...Consistent 10-1-1604: DRIVEWAY SLOPES The project’s driveway...

Last Modified: 10/27/2022

2026-27 Annual Action Plan - FINAL 6.17.2026.pdf

funding recommendations; • Solicited comments for 30 calendar days; and • Held an agenized

Last Modified: 07/01/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet