Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geocell Retaining Wall Terpercaya Tabanan Bali"
into the Project: Walls: 6-inch wood stud wall with two layers of 5/8” gypsum...Sound Wall The developer shall...
Last Modified: 05/04/2021
The Applicant proposes demolition of interior walls within the existing basement...All exterior materials and finishes, including windows and...
Last Modified: 08/21/2025
Water closets shall not exceed 1.28 gallons per flush (gpf) 5.303.3.1 Mandatory Wall-mounted...Mandatory Verification of compliance 5.504.4.7.1 Mandatory Acoustical...
Last Modified: 02/09/2026
Showing 753 to 756 of 1,593 entries.