Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geocell Retaining Wall Terpercaya Tabanan Bali"
– The project is within the maximum building height of 27’ – 0” to the top of wall...an enclosure no smaller than 7’-0” by 8’-0” enclosed on 3 sides by a masonry...
Last Modified: 12/01/2023
SPACE BY REPLACING STOREFRONT THAT IS FLUSH WITH THE LINE OF (E) CONCRETE EXTERIOR WALL...Demo kitchen-living-laundry room walls, remodel ...
Last Modified: 07/01/2025
All completed applications will be provided to City Council for review; Council retains
Last Modified: 03/03/2025
Showing 873 to 876 of 1,593 entries.