Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Pati Jawa Tengah"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Pati Jawa Tengah.
Search Results

2023092023-FY-23-24-Fee-Schedule-Final.pdf

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 09/20/2023

20231005-FY-23-24-Fee-Schedule_Final.pdf

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 10/05/2023

20220227-AFR-Year-Ending-June-30-22.pdf

the remaining estimated cost of $25,194 as the remaining estimated capacity is filled

Last Modified: 02/27/2023

PROPOSED FY 2025-26 FEE SCHEDULE

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 05/01/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet