Showing results for "dWA 0821 1305 0400 [[Adefa]] Pesan Geocomposite Perkuatan Jalan ASTM Natuna Kepulauan Riau"
Downtown Burbank Metrolink Station $11 Million - Design and installation of a geocomposite
Last Modified: 05/04/2023
properly compacted to at least 95 percent relative compaction in accordance with ASTM...E1745 and should be installed in general conformance with...
Last Modified: 07/09/2021
shall be high-density polyethylene pipe and meet the applicable requirements of ASTM...F714 Polyethylene (PE) Plastic Pipe (SDR-PR) Based on Outside Diameter,...
Last Modified: 04/13/2021
This is to certify that anti-entrapment drain cover(s) meeting ASTM or ASME standards...The existing swimming pool, spa, or toddler pool on this property has an...
Last Modified: 06/06/2023
Showing 9 to 12 of 220 entries.