Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pusat Geocell Retaining Wall Terdekat Kepulauan Sula Maluku Utara"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pusat Geocell Retaining Wall Terdekat Kepulauan Sula Maluku Utara.
Search Results

2025 JUL FINALED

07/01/2025Permit Final Final Date:Permit Status: INSTALL NEW INTERIOR PARTITION WALL...EXCEPT FOR (1) WALL AT GARAGE; 1338 SF ADDITION, 252 SF...

Last Modified: 08/11/2025

Attachment 5 - Ordinance Extension_No._22-3975.pdf

Unit (6) Minimum Building Separation Between Primary Units Exterior Wall...to Exterior Wall 6-feet Eave to Eave 4-feet Minimum...

Last Modified: 03/02/2023

Attachment 6 - August 28, 2023, Planning Commission Staff Report without Attachments.pdf

ADU development standards: • ADU square footage is measured from exterior wall...to exterior wall, unless the ADU shares a...

Last Modified: 10/05/2023

StormwaterQualityPDF1616.pdf

Impact Development ordinance a nd G reen S treets p olicy t o reduce runoff and retain

Last Modified: 03/25/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet