Search Results

Showing results for "dWA 0821 1305 0400 Harga Pengadaan Erosion Control Mat Terpercaya Cilegon Banten"

No results were found that matched the keywords: dWA 0821 1305 0400 Harga Pengadaan Erosion Control Mat Terpercaya Cilegon Banten.
Search Results

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Barricades $34.00 Each Per Day (2) Delineator $34.00 Each Per Day (3) Small Traffic Control...Sign $34.00 Each Per Day (4) Large Traffic Control...

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Barricades $34.00 Each Per Day (2) Delineator $34.00 Each Per Day (3) Small Traffic Control...Sign $34.00 Each Per Day (4) Large Traffic Control...

Last Modified: 03/17/2026

20260814-FY-26-27-Adopted-Revised

Barricades $34.92 Each Per Day (2) Delineator $34.92 Each Per Day (3) Small Traffic Control...Sign $34.92 Each Per Day (4) Large Traffic...

Last Modified: 08/17/2026

FY 2026-27 Adopted Fee Schedule

Barricades $34.92 Each Per Day (2) Delineator $34.92 Each Per Day (3) Small Traffic Control...Sign $34.92 Each Per Day (4) Large Traffic...

Last Modified: 09/22/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet