Search Results

Showing results for "dWA 0821 1305 0400 Layanan Hydroseeding Green Project Tolikara Papua"

No results were found that matched the keywords: dWA 0821 1305 0400 Layanan Hydroseeding Green Project Tolikara Papua.
Search Results

Att1 -Resolution

indirect physical change to the environment and falls outside the definition of a “project

Last Modified: 11/06/2025

Public Works Director

Ken Berkman brings 30 years of public works and engineering experience to the table — in both the public and private sectors.

Last Modified: 12/17/2025

(Attachment 1) Drive-through Ordinance.pdf

because the activity is covered by the general rule that CEQA applies only to projects

Last Modified: 09/22/2022

(Attachment 1) Drive-through Ordinance (1).pdf

because the activity is covered by the general rule that CEQA applies only to projects

Last Modified: 09/22/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet