Search Results

Showing results for "dWA 0821 1305 0400 Maintenance Rutin XRF Handheld Ogan Komering Ilir Sumatera Selatan"

No results were found that matched the keywords: dWA 0821 1305 0400 Maintenance Rutin XRF Handheld Ogan Komering Ilir Sumatera Selatan.
Search Results

2025 CALGreen Residential Mandatory Measures

4.303.1.4.3 Metering faucets 4.406.1 Rodent proofing 4.410.1 Operation and Maintenance...MATERIAL CONSERVATION & RESOURCE EFFICIENCY (Building...

Last Modified: 02/09/2026

2025 CALGreen Residential Mandatory Measures

4.303.1.4.3 Metering faucets 4.406.1 Rodent proofing 4.410.1 Operation and Maintenance...MATERIAL CONSERVATION & RESOURCE EFFICIENCY (Building...

Last Modified: 02/09/2026

20211209-AUP-report-Measure-P-Sales-Tax Funds-FY-June-30-2021.pdf

baseline General Fund commitment established by the adoption of the Infrastructure, Maintenance...the Municipal Infrastructure Fund were expended on infrastructure...

Last Modified: 12/09/2021

20220227-AUP-report-Measure-P-Sales-Tax Funds-FY-June-30-2022.pdf

baseline General Fund commitment established by the adoption of the Infrastructure, Maintenance...expenditures within the Municipal Infrastructure Fund were expended on...

Last Modified: 02/27/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet