Showing results for "dWA 0852 2611 9277 [[GLORION]] Pembuatan Interior HPL Apartment Central Park Jakarta Barat"
SMOOTH TROWEL FINISH STUCCO, COLOR TO BE DECIDED WITH AT LEAST 15 WORKING DAYS APART...PROVIDE EXPIATION JOINT MAXI. 8"-0" APART IN BOTH...
Last Modified: 08/18/2022
ALL INTERIOR WALL OR CEILING FINISHES (EXCEPT CLASS I) LESS ALL INTERIOR WALL OR...SPRINKLER HEADS, AUTOMATIC SPRINKLER SYSTEMS SHALL BE SUPERVISED...
Last Modified: 05/27/2021
Yes Interior Side Yard 10-1-628(A) & (G) Min.: 5 ft....• Centrally located within the project. • 80% open to sky, with no...
Last Modified: 09/15/2025
A Parking Structure and Synagogue 11/24/2023 Various MO: KLINTON DION is wanted...Glenoaks Bl.), the subterranean garage to an apartment...
Last Modified: 11/27/2023
Showing 345 to 348 of 4,801 entries.