Search Results

Showing results for "dWA 0859 3970 0884 Kontraktor Pemborong Interior Apartemen 1 Bedroom Daerah Gatak Sukoharjo"

No results were found that matched the keywords: dWA 0859 3970 0884 Kontraktor Pemborong Interior Apartemen 1 Bedroom Daerah Gatak Sukoharjo.
Search Results

20230630-FY-23-24-Fee-Schedule-Final.pdf

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 07/10/2023

20231005-FY-23-24-Fee-Schedule_Final.pdf

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 10/05/2023

FY 2024-25 Adopted Fee Schedule

32 Description Amount Unit/Time (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 06/27/2024

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

32 Description Amount Unit/Time (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 09/04/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet