Search Results

Showing results for "dWA 0859 3970 0884 Paket Pembuatan Interior Rumah Type 90/120 Daerah Gunungkidul"

No results were found that matched the keywords: dWA 0859 3970 0884 Paket Pembuatan Interior Rumah Type 90/120 Daerah Gunungkidul.
Search Results

2025 DEC FINALED

Construction of new non-bearing interior partitions, millwork, finishes & fixtures...Tenant Improvement 12/04/2025Permit Final Final Date:Permit Status: 6TH FLOOR...

Last Modified: 01/02/2026

2025 Residential Correction List (1)

, 20 amp electrical receptacle that is connected to the electric panel with a 120...provided (CMC 504.4.2) Dryer exhaust cannot exceed 14 ft. with a maximum of two...

Last Modified: 06/24/2026

CIMP.pdf

90% Laboratory Analyses – Water Conventionals and Solids 80 – 120% 0 – 25% 80...– 120% 90% ...

Last Modified: 03/25/2021

20210101_Section 8 - 2021ADMISTRATIVEPLANFINAL.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 05/20/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet