Showing results for "SB 9 Urban Lot Split Eligibility Application"
The review covered areas such as internal investigations, applications of use of...Recommendation 9: BPD should carefully evaluate the use of...
Last Modified: 08/19/2025
WALL INTERIOR/EXTERIOR LOT BDRY.LINE FLOWLINE EXIST....the Development Planning for storm Water Management-A manual for the Standard ...
Last Modified: 12/08/2025
Last Modified: 04/05/2021
As demonstrated below, this final WLA is still applicable to Segment B....private food-based manufacturing facility borders the site to the west, and a parking...
Last Modified: 03/25/2021
Band of Mission Indians - Kizh Nation and the City of Burbank for the Proposed SB...Gabrieleno Band of Mission Indians - Kizh Nation (the Kizh) regarding the proposed...
Last Modified: 05/15/2024
Construction Vehicle Control Strategies Non-applicable....Construction Earthmoving Control Strategies Non-applicable....Construction Vehicle...
Last Modified: 12/13/2024
scope of the design was to provide a multi-story facility on an extremely small lot...Commission (Chair) - Founder of the original Buy Nothing Group that eventually...
Last Modified: 06/16/2022
OF NE 95 FT OF SE 152.5 FT OF NW 320 FT OF LOT 2 BLOCK: 29 ZONE : R4 LOT AREA:...MAX LOT COVERAGE: 70% = 5,016.2 SF OPEN...
Last Modified: 09/29/2026
If so, the applicant is directed to first obtain approval from the Landscape and...Urban Forestry Division for the removal of the tree....by...
Last Modified: 02/02/2023
utility tunnels, alleys, storm drains, sanitary sewers, survey monuments, parking lots...All landscaping changes shall be coordinated with the City's ...
Last Modified: 07/20/2026
ADU SF PRIMARY RESIDENCE SF PERCENTAGE / * Per SB 543 any ADU submitted after January...SqFt/Unit PERCENTAGE / For the purpose of calculating the fees for an ADU on a...
Last Modified: 05/28/2026
GROSS LOT AREA AFTER DEDICATION: ± 38,361.13 SQ.FT ALLOWABLE LOT COVERAGE: 80 %...=> 12’-9” + 5’-0” =...
Last Modified: 10/29/2024
All projects shall comply with Title 9, Chapter 1, of the Burbank Municipal Code,...Page 9 of 11 • Nonstructural or non-seismic alterations or...
Last Modified: 04/13/2021
Last Modified: 04/27/2026
PLAYERS ELIGIBILITY A....Only members of the Sports Office staff may receive applications or waivers for...The second and third game if...
Last Modified: 04/28/2025
If the project is on a corner lot, photographs should include both streets....standards such as lot coverage and Floor-Area Ratio (FAR)...SITE...
Last Modified: 05/18/2022
Last Modified: 07/28/2025
The final proposed floor area on the lot is 2,412 square feet....The final proposed floor area on the lot is 2,412 square feet....have dark parcel...
Meeting to discuss a Development Review (DR) and Conditional Use Permit (CUP) application...The City has determined that the project is eligible...
Last Modified: 05/17/2022
Show compliance with Burbank Municipal Code section 9-1-2-1613.10: Suspended Ceilings...shall provide a toe clearance of 9 inches minimum above the...
Last Modified: 04/02/2026
Last Modified: 08/10/2026
150,000 Totals $150,000 - - - - - - $150,000 Project Description This project is to split...Staff will hire a consultant to design the layout, build a drywall...
Last Modified: 09/11/2025
On March 13, 2023, Worthe Real Estate Group (“Applicant”) on behalf of Catalina...If any provision of this Ordinance or its application is held...
Last Modified: 01/18/2024
The split of the company will reduce Honeywell's annual revenue by about half to...that even with the recent jump in oil and gas prices, energy costs are still a...
Last Modified: 06/24/2026
Last Modified: 10/01/2026
Mechanical $13,350.00Valuation: REPLACEMENT OF (1) ROOF-MOUNTED DUCTLESS MINI-SPLIT...91502CALos Angeles Applicant 3191 CASITAS AVE.SUITE 116 ...
Last Modified: 10/06/2025
Buyback Event for City of Burbank residents on Saturday, December 20, 2025, from 9:...The event will take place in the rear parking lot of the...
Last Modified: 12/11/2025
Last Modified: 05/29/2024
notice is to let you know that the Burbank Planning Board will be considering an application...The Project is being processed under an SB 330...
Last Modified: 09/13/2021
GROSS LOT AREA AFTER DEDICATION: ± 38,361.13 SQ.FT ALLOWABLE LOT COVERAGE: 80 %...DIAGRAMS: LOT COVERAGE A-4.0 1 A- 4....
Last Modified: 01/11/2024
The site includes one property consisting of a 6,798 square foot lot, comprised...The site includes one property consisting of a 6,798 square foot...
Last Modified: 05/20/2021
SB 1383 requirements for trash, recycling, and organics collection C....Late Fees, if applicable: Balance Due without Late Fees Days...
Last Modified: 05/22/2026
standards generally accepted in the United States of America and the standards applicable...federal statutes, regulations, and the terms and conditions of its federal...
Last Modified: 08/09/2022
Last Modified: 12/30/2025
/24/2025 CATALINA ST Multi-Family Repair and Maintenance $4,500.00Valuation: SB...REPLACE & RELOCATE VANITY/LAV IN (1) BATHROOM. (1) NEW...
Last Modified: 03/10/2025
(E) LOT COVERAGE: 16% R-3 17. 19. 20. 18. 14. 16. 15. 13. 11. 12. 9....SPLIT SYSTEM FORCED AIR FURNACES FOR...
Last Modified: 09/28/2026
BURBANK, CA. 91501 ARCHITECTURAL DESIGNER / APPLICANT DLV DEVELOPMENT YOMAR DE...NTS4 VICINITY MAP CONSTRUCTION TYPE: TYPE-VB PROJECT DATA ...
Last Modified: 02/17/2022
Showing 1,681 to 1,720 of 8,284 entries.