Search Results

Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta"

No results were found that matched the keywords: dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta.
Search Results

Attachment 1, Exhibit D - Plan submittal

Enhanced stamped paving at main project entry.

Last Modified: 11/19/2024

Burbank2035 EIR Appendix F, Part 2.pdf

sidewalks of adequate width, benches, street trees and landscaping, decorative paving

Last Modified: 07/29/2021

20230504-FY-2023-24-Proposed-Budget-Final.pdf

26,752 The responsibilities of this position include management of annual paving...Residential Pavement Rehabilitation Project to complete the concrete work prior to...

Last Modified: 05/04/2023

25-4,034 Adopting by Reference 2025 CA Building Standards Code

Exception: At paved garage and doorway entrances to the building, the stem wall...construct, alter, repair, raise, build or move any permanent building, structure,...

Last Modified: 11/24/2025

Appendix 11.1E_Phase I II ESA.pdf

The remainder of the property is a paved lot that is used for drying and detailing

Last Modified: 11/29/2021

20210401_3700RD_Appendix_E.pdf

The remainder of the property is a paved lot that is used for drying and detailing

Last Modified: 04/12/2021

6-22-21 PH - ATTACHMENT 1

surfaces 2% Do not hose or wash driveways, patios, sidewalks, or other hard or paved...and avoid run-off into streets, sidewalks, parking lots, alleys or other...

Last Modified: 06/10/2021

Burbank PMP Final Report 2025.pdf

The budgeted amounts for the 3 scenarios include paving and non-paving costs, staff...Paving Items Price 2017 – 2024....

Last Modified: 09/02/2025

Attachment 3 - SB 35 Application inclusive of the SB 35 NOI App reduced.pdf

Enhanced paving at main project entry.

Last Modified: 12/26/2023

2026 MAY ISSUED

Sitework $10,000.00Valuation: SITEWORK ALTERATIONS; GENERAL LANDSCAPE UPDATES, PAVING

Last Modified: 06/15/2026

20211026-FY-2021-22-ADOPTED-BUDGET

Transportation Bridge Repairs 50,000 50,000 Fiscal Year 21-22 Annual Residential Paving...123 - Road Maintenance and Rehabilitation Fiscal Year 21-22 Annual...

Last Modified: 10/26/2021

20240502-FY-2024-25-Proposed-Budget-COMPLETE

Residential Pavement Rehabilitation Project to complete the concrete work prior to paving...Residential Pavement Rehabilitation Project to complete the concrete work prior...

Last Modified: 05/02/2024

2025 JUL ISSUED

4511 07/09/2025 EMPIRE AVE Sitework $199,189.00Valuation: REPLACE ASPHALT PAVING

Last Modified: 08/11/2025

ATTACHMENT 11.pdf

infrastructure is located throughout Burbank, typically underground and beneath existing paved

Last Modified: 09/16/2022

Phase I

addition to the current structure, the subject property was improved with an asphalt paved...Site storm water from roofs, landscaped areas, and...

Last Modified: 09/25/2025

FY 2021-22 Proposed Budget.pdf

The paving construction budget has almost tripled from prior years and the size of...the paving contracts have been commensurate with the...

Last Modified: 04/22/2021

FY 2021-22 Proposed Budget.pdf

The paving construction budget has almost tripled from prior years and the size of...the paving contracts have been commensurate with the...

Last Modified: 04/22/2021

20201216.AdoptedCIP17_18.pdf

Building Ontario Substation would pave the way to retiring two of the four oldest...Streets: Approximately 228 miles of streets, 49 miles of paved...

Last Modified: 12/16/2020

2025 FEB ISSUED

QUALITY GRADING & PAVING 3109240532 90745CACason Contractor 552 E CARSON ST #104

Last Modified: 03/10/2025

2025 APR ISSUED

$5,000.00Valuation: CRACK FILL, SEAL COAT, AND RE-STRIPE 25 SINGLELINE STALL SUPERIOR PAVING

Last Modified: 05/01/2025

1310 E Tujunga Ave - PLANS

4.106.2 Storm Water Drainage and Retention During Construction 4.106.3 Grading and Paving

Last Modified: 04/03/2026

Attachment 7 – EIR Addendum.pdf

parking areas by demolishing existing structures and reconstructing existing paved

Last Modified: 01/18/2024

FY 2025-26 Adopted Budget_Complete

300,000 300,000 300,000 1,800,000 3,300,000 Paving...a development standstill for the next two decades. 1910 San Fernando Road is...

Last Modified: 09/11/2025

FY 2026-27 Adopted Budget Book FINAL

Program 25144 Security Improvements Program 25145 Safety Improvements Program 25146 Paving...a development standstill for the next two decades. 1910 San Fernando Road is...

Last Modified: 09/10/2026

2919 Olney Pl - Project Plans.pdf

ALL EXISTING AND NEW DRIVEWAYS, DRIVEWAY CURB CUTS, PAVED FRONT YARD AREAS AND FRONT

Last Modified: 08/04/2022

UpperLARiver_Draft_Appendix4a.pdf

be designed as surface or subsurface units allowing for implementation around paved...The depth of paving surface, and storage layer of the...

Last Modified: 03/25/2021

2025-08-08_Full Set (Arch+Civil+Land) - Copy

DRAINAGE AWAY FROM THE STRUCTURE FOR 10' MIN AT PAVED AREAS AND 5% MIN AT LANDSCAPED

Last Modified: 12/02/2025

12092023-Rancho Providencia Neighborhood Protection Plan Update Mitigated Negative Declaration-001.pdf

not cause substantial erosion, because construction of speed humps on existing paved

Last Modified: 12/08/2023

Attachment 6 (Reduced Size) – Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program.pdf

not cause substantial erosion, because construction of speed humps on existing paved

Last Modified: 11/22/2023

20260505-Rancho Providencia Neighborhood Protection Plan Update Mitigated Negative Declaration-001.pdf

not cause substantial erosion, because construction of speed humps on existing paved

Last Modified: 05/05/2026

20260528-City Council BRT and Senate Bill 79 Update – May 20, 2026 City Council Staff report -001.pdf

ENGINEERING DIVISION General Requirements:  The City’s arterial paving

Last Modified: 05/28/2026

PLANS RIVR_DensityBonusApp_231121_R2.pdf

MUST HAVE A MINIMUM WIDTH OF 48 INCHES AND MUST BE IMPROVED WITH A DECORATIVE PAVED

Last Modified: 12/21/2023

Appendix F_HazMat Studies_Part 1.pdf

is removed from the subject property primarily by sheet flow action across the paved...Site storm water from roofs, landscaped areas, and paved...

Last Modified: 12/13/2024

ApxK_Transportation Study.pdf

14 495 33 106 343 56 2838 845-945 174 1018 189 148 117 148 14 485 30 92 319 48 2782

Last Modified: 07/09/2021

ATTACHMENT 12-with page numbers - reduced.pdf

or road must exceed 10 percent due to topography, then the ramp or road must be paved...For equipment operating within paved public roadways,...

Last Modified: 09/16/2022

FY 2024-25 Adopted Budget_Final

The Gas Tax Fund is allocating an additional $1.9 million to street and sidewalk paving...a development standstill for the next two decades. 1910 San Fernando Road is...

Last Modified: 09/05/2024

20220227-AFR-Year-Ending-June-30-22.pdf

Substation Rebuild; $9,990 Pacific Northwest DC Intertie; $5,214 Residential Street Paving

Last Modified: 02/27/2023

20210301_AppendixJTrafficImpactStud_Avion.pdf

sidewalks of adequate width, benches, street trees and landscaping, decorative paving...1.98 0.02 1.00 0.00 0.00 1.00 1.00 2.00 1.00 1.00 2.00 0.00 Final Sat.: ...

Last Modified: 03/31/2021

2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

14 495 33 106 343 56 2838 845-945 174 1018 189 148 117 148 14 485 30 92 319 48 2782

Last Modified: 09/10/2021

2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

14 495 33 106 343 56 2838 845-945 174 1018 189 148 117 148 14 485 30 92 319 48 2782

Last Modified: 09/10/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet