Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta"
-1/2" FLANGE AT STUCCO SIDING PLACED A MINIMUM OF 4" ABOVE EARTH OR 2" ABOVE PAVED...-1/2" FLANGE AT STUCCO SIDING PLACED A MINIMUM OF 4" ABOVE EARTH OR 2" ABOVE ...
Last Modified: 04/13/2021
Enhanced paving at main project entry....Integral colored concrete paving at open space gathering. 4' wide community natural
Last Modified: 11/23/2021
Roadway Construction Noise Model (RCNM),Version 1.1 Report date######## Case Descr Paving...Roadway Construction Noise Model (RCNM),Version 1.1 Report date######## ...
Last Modified: 12/13/2024
applicant will have to restore the street fronting the property per City of Burbank paving...Additional impacts to street triggered by this project could extend the...
Last Modified: 03/04/2025
replaced, backfill shall be placed and completed to sub-grade elevation after which paving...replaced, backfill shall be placed and completed to sub-grade elevation after...
Last Modified: 10/06/2025
Last Modified: 02/17/2023
Bicycle parking facilities shall be located on a hard paved surface and shall be...construct, alter, repair, raise, build or move any permanent building, structure,...
Last Modified: 01/07/2022
ALL EXISTING AND NEW DRIVEWAYS, DRIVEWAY CURB CUTS, PAVED FRONT YARD AREAS AND FRONT...WITH A 3 1/2" FLANGE AT STUCCO SIDING PLACED A MIN. 4" ABOVE EARTH OR 2" ABOVE...
Last Modified: 08/26/2021
of the backfill will be necessary to reduce settlement of overlying walks and paving...PAVEMENTS Prior to placing paving, the existing grade...
Last Modified: 01/07/2025
coatings, residential fuel combustion, construction and demolition, dust from paved...restaurants with charbroilers and construction sites (diesel ...
Last Modified: 11/17/2021
Last Modified: 09/22/2026
0.0950 Architectural Coating/2024 0.0951 Architectural Coating/2025 0.0951 Paving...1435 4 Architectural Coating Architectural Coating 1/2/2023 9/30/2025 5 717 5...
Last Modified: 03/31/2021
• Decorative paved surface, pavers, etc....The paved pathway meets the required 48” minimum width dimension....Additional impacts to street ...
Last Modified: 09/15/2025
Arcades, canopies , non-reflective paving and artificial illumination shall be...All setbacks and non-paved areas shall be landscaped....Operate...
Last Modified: 01/18/2024
PAVED AREA - 687 SQFT.
Last Modified: 06/15/2021
As depicted on Exhibit 3-5a through 3-5c, all setback and non-paved areas would...Specifically, the paved area surrounding the car wash building...
Last Modified: 11/29/2021
As depicted on Exhibit 3-5a through 3-5c, all setback and non-paved areas would be...Specifically, the paved area surrounding the car wash building...
Last Modified: 03/24/2022
Building Construction Sweepers/Scrubbers 1 8 64 0.46 418 98,447 Paving
Last Modified: 07/09/2021
segments and continue with design efforts Cont'd 38 FY 24/25 Annual Residential Pave
Last Modified: 03/03/2025
northeast portion of the site is utilized as a parking area for trucks and is currently paved...LaboratoryDepth Lith- (feet) ology Material Description GJ a>i fO 3 CQ O c...
Bicycle parking facilities shall be located on a hard paved surface and shall be...All paved areas shall be maintained in the manner required to...
Last Modified: 11/21/2024
Last Modified: 11/19/2024
Last Modified: 02/25/2022
Last Modified: 03/25/2026
sidewalks Transit stops Project is not proposing any alteration to the existing paved...Additional impacts to street triggered by this project could extend the...
Last Modified: 12/01/2023
SCREED WITH A 3-12" FLANGE AT STUCCO SIDING PLACED MINIMUM OF 4 INCHES ABOVE EARTH PAVED...GRADING AND PAVING: PLANS SHALL INDICATE HOW THE SITE...
Last Modified: 06/10/2026
Concrete repairs and paving limits were marked as approved by Public Works....The paving and concrete work was completed during the second week of...
Last Modified: 09/27/2024
applicant will have to restore the street fronting the property per City of Burbank paving...requirements. 41.Additional impacts to street triggered by this project...
Last Modified: 09/16/2026
-1/2" FLANGE AT STUCCO SIDING PLACED A MINIMUM OF 4" ABOVE EARTH OR 2" ABOVE PAVED...3-1/2" FLANGE AT STUCCO SIDING PLACED A MINIMUM OF 4" ABOVE EARTH OR 2" ABOVE...
Last Modified: 06/07/2021
developed with a Marriott hotel and convention center constructed in 1990, and paved...project site is surrounded by office and medical use buildings, large areas of...
Enhanced paving and plant containers would define exterior spaces for dining and...Finally, Phase I of the project would be completed with paving...
RETAINING WALL WITH BRICK CAP 18" AWAY FROM PROPERTY LINE NATURAL STONE PAVING...PROPOSED 2 STORY RESIDENCE PROPOSED ATTACHED 3-CAR GARAGE NATURAL STONE ...
AREA: 1,516 SF NON-PERMEABLE PAVING AREA: 300 SF PERMEABLE LAND AREA: OPEN...SPACE AREA: 23,937 SF LANDSCAPE AREA: 7,434 SF PERMEABLE PAVING...
Last Modified: 10/13/2022
Last Modified: 10/20/2022
Last Modified: 10/27/2022
" EX IS TI N G 1 5' -0 " A LL EY 8 ' - 0 " 3 0 ' - 0 " NEW SLOPED PAVED...BELLOW THE STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM 4" ABOVE EARTH OR 2" ABOVE...
Last Modified: 02/09/2023
SITE AREA TO BE IMPROVED: PAVED AREA: 184,030 S.F....LANDSCAPE AREAS SITE HARDSCAPE AREAS VEHICULAR ACCESS PAVING PER CIVIL C O...PLANTER ...
Last Modified: 01/09/2025
Showing 161 to 200 of 500 entries.