Search Results

Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Custom Wall Panel Bergaransi Wonogiri"

No results were found that matched the keywords: dWA 0812 2782 5310 [[PANDAWA]] Custom Wall Panel Bergaransi Wonogiri.
Search Results

2925 N Lamer St_Plans_c4_1.27.25

FOOTING PANEL PER PLAN SLOPE 1 4" PER 1'-0" MIN....PANEL PER PLAN #10 TEK @ 12" O.C....DETAIL BEAM TO POST PANEL TO...

Last Modified: 03/04/2025

Attachment 4 Project Plans and Subdivision Map...pdf

Panel Stucco Arch Low Tile Wall w/ Tile Cap (Barranca) Decorative Shutters with...Panel Stucco Arch Low Tile...

Last Modified: 10/20/2022

20210622_2814_Empire_Ave_City_Response.pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/27/2021

2021_Planning_Plans_4336 CLYBOURN AVE_may submittal.pdf

Access Panel APPROX Approximate ARCH Architectural ASPH Asphalt BD Board BITUM Bituminous...WOOD DOOR PAINTED BLACK GARAGE DOOR CONCEPT IMAGE - SOLID...

Last Modified: 07/22/2021

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

Guide to Burbank.pdf

The Council Chamber is paneled in teakwood and the Mayor’s office in semi-bent burl...Other work included: refinishing the teak paneling on the...

Last Modified: 01/03/2025

Guide to Burbank 2026 - May 2026

The Council Chamber is paneled in teakwood and the Mayor’s office in semi-bent burl...Other work included: refinishing the teak paneling on the...

Last Modified: 05/07/2026

5-3 - PH Attachment 3

., smart thermostat, electrical vehicle charger, solar panels, cool roofs, etc.)...in a safe manner during this pandemic as restaurants rely more on takeout from...

Last Modified: 04/21/2022

Attachment 3 - Community Survey.pdf

., smart thermostat, electrical vehicle charger, solar panels, cool roofs, etc.)...in a safe manner during this pandemic as restaurants rely more on takeout from...

Last Modified: 04/21/2022

Decision Letter - Combined

e Slope Plan approval is conditional that a separate Main Electrical Service Panel...sliding door_15' 15' - 0" 6' - 8" 0' - 0" 4 1 4 panel...

Last Modified: 12/30/2025

5-3 - PH Attachment 1

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...1 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 04/21/2022

Attachment 1 - Exhibit 1 GGRP Update Draft_3.9.2022_wAPPS_PublicReview_reduced size.pdf

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...1 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 04/21/2022

920 E Cedar Ave - Project Plans.pdf

FACTOR OPENING OPPOSITE PAINT(ED) PLANTER DRAIN PLATE PLASTIC LAMINATE PLYWOOD PANEL...FIRE RATED FIBERGLASS REINFORCED PANEL FINISHED SURFACE FOOT...

Last Modified: 02/17/2022

WMR 2.28.25.pdf

Customer in-person meetings Customer maintenance calls/discovery calls January...Customer Audits (#) ...

Last Modified: 02/28/2025

Exhibit A - 1 - GGRP Update Draft_3.9.2022_wAPPS_PublicReview.pdf

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 03/10/2022

GGRP Update Final_w.App

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 11/13/2025

GGRP Update Final_w.App.pdf

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 10/23/2022

3915 Heffron Drive - Revised Plans - 6.30.26

PROVIDE ALL NECESSARY CEILING OR WALL ACCESS PANELS AS REQUIRED FOR AIR CONDITIONING...IN FIRE RATED ASSEMBLIES PROVIDE RATED ACCESS...

Last Modified: 09/04/2026

02192013_Burbank_Greenhouse_Gas_Reduction_Plan.pdf

windows and doors, attic insulation, central air conditioners, solar attic fans, wall...Intergovernmental Panel on Climate Change. 2000....See...

Burbank GGRP CEQA_3.9.2022_CLEAN.pdf

Action W-1.1.c Continue enforcement of large irrigation customers required to...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 03/09/2022

Attachment 1 – City Council Resolution

ATTACHMENT 1 – PAGE 6 Wireless customers to an area that currently has none....of a new unmanned roof-mounted wireless telecommunication facility with three...

Last Modified: 10/18/2024

Rob Searcy - LALAX04397B AUP Application.pdf

adequate in size and shape to accommodate the use and are all of the yards, setbacks, walls...locatedRow2: wireless access to voice, data and E911 services for residents,...

Last Modified: 04/26/2024

20210701_921_Riverside_Dr_City_Response_Final.pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/27/2021

20210701_921_Riverside_Dr_City_Response_Final (1).pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/30/2021

20210701_921_Riverside_Dr_City_Response_Final (2).pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/30/2021

20210701_921_Riverside_Dr_City_Response_Final (3).pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/30/2021

2025 OCT FINALED

10/01/2025Permit Final Final Date:Permit Status: DEFERRED SUBMITTAL-PERFORATED PANEL...No structural, all walls to be non-bearing....Permit...

Last Modified: 11/03/2025

Final Submission - 4.10.25

UNIT DOOR SIZE GLAZE DUAL TEMP 24'-0" 1 3/4"1 WIDTH HEIGHT THK 2 EXTERIOR PANEL...DOORPAINTED1 3/4"2'-8"1 3 2'-8"2 PAINTED8'-0" 8'-0" 8'-0" 1 3/8" 6...

Last Modified: 07/15/2025

Final Submission

UNIT DOOR SIZE GLAZE DUAL TEMP 24'-0" 1 3/4"1 WIDTH HEIGHT THK 2 EXTERIOR PANEL...DOORPAINTED1 3/4"2'-8"1 3 2'-8"2 PAINTED8'-0" 8'-0" 8'-0" 1 3/8" 6...

Last Modified: 06/16/2025

20220901-FY-2022-23-Adopted-CIP

2,079,750 H-24 Day Ahead Planning and Resource Center 80,000 80,000 H-25 DC Panel...City of Burbank Project Information Sheet FY2022-23 BWP-Electric Utility DC...

Last Modified: 09/01/2022

3001 SB35 - Plans.pdf

1110 S.FSOLAR PANEL 1110 S.F 13 24 44 5'-5" 261'-4" 5'-8" 3 8' -5 " 6 2 '-...Solid Joint at trap-no access panel required....Solid Joint at...

Last Modified: 06/26/2023

2024-01-16_Thornton Planning Package

ROOF WIL BE A PANELIZED SYSTEM WITH MEMBRANE ROOFING....EAST EXTERIOR WALL HR. SOUTH EXTERIOR WALL HR....ANCHOR BOLTS...

Last Modified: 04/18/2024

2024-01-16_Thornton Planning Package23

ROOF WIL BE A PANELIZED SYSTEM WITH MEMBRANE ROOFING....EAST EXTERIOR WALL HR. SOUTH EXTERIOR WALL HR....ANCHOR BOLTS...

Last Modified: 01/13/2025

20210301_AvionPlansPart1_Avion.pdf

MTL-7 FLAT METAL PANEL MTL-8 LAP SEAM METAL PANEL PAINTED BLUE MTL-9 STEEL BEAM...CALCULATION VC-1.0 VECHICULAR,PEDESTRIAN/BICYCLE CIRCULATION...

Last Modified: 03/31/2021

2025 CALGreen Nonresidential Mandatory Measures

Water closets shall not exceed 1.28 gallons per flush (gpf) 5.303.3.1 Mandatory Wall-mounted...Mandatory Verification of compliance 5.504.4.7.1 Mandatory Acoustical...

Last Modified: 02/09/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet