Search Results

Showing results for "dWA 0812 2782 5310 Paket Pembuatan Interior Rumah Minimalis 2 Lantai Daerah Mojolaban Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Paket Pembuatan Interior Rumah Minimalis 2 Lantai Daerah Mojolaban Sukoharjo.
Search Results

2021_Pickwick_Landscape_Plan.pdf

Refer to Section-Elevation Sheet L5. 12. 13. 11. 10. 5. 9. 8. 7. 6. 4. 3. 2....LEGEND 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 20 1 2 ...

Last Modified: 11/23/2021

777 N. Front St. - Final EIR.pdf

Residential courtyards and balconies would be located within the interior sides...18 reduce interior noise in habitable rooms to an acceptable...

Last Modified: 03/31/2021

Plans formal submittal #2_Part3

LOCATIONS SHOWN ON THE INTERIOR AND MECHANICAL DRAWINGS TAKE PRECEDENCE...BREAKERS SHALL BE RATED AS INDICATED ON PLANS, NEMA 1 ENCLOSURE FOR ...

Last Modified: 11/14/2024

Plans formal submittal #2_Part3 (1).pdf

LOCATIONS SHOWN ON THE INTERIOR AND MECHANICAL DRAWINGS TAKE PRECEDENCE...BREAKERS SHALL BE RATED AS INDICATED ON PLANS, NEMA 1 ENCLOSURE FOR ...

Last Modified: 11/14/2024

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 12/12/2025

Revised FY 2025-26 Adopted Fee Schedule FINAL

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 09/17/2025

PROPOSED FY 2025-26 FEE SCHEDULE

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 05/01/2025

Adopted FY 2025-26 FEE SCHEDULE - Final

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 08/07/2025

20250625 (3).fy25_26feescheduleadopted.pdf

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 12/18/2025

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 03/18/2026

FY 2025-26 ADOPTED FEE SCHEDULE FINAL

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 09/05/2025

20211229-FY-21-22-Fee-Schedule-Final.pdf

to 30 LF (ii) Additional partition, up to 30 LF $15.85 Each (b) Residential, Interior...to 30 LF (ii) Additional partition, up to 30 LF $15.85 Each (b) Residential,...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $156.90 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/20/2022

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $156.90 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $156.90 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $156.90 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/20/2022

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...of Occupancy/Condo Conversion $83.05 Each Unit (5) Close Existing Openings (a)...

Last Modified: 09/04/2025

FY 2024-25 Adopted Fee Schedule

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...of Occupancy/Condo Conversion $83.05 Each Unit (5) Close Existing Openings (a)...

Last Modified: 06/27/2024

FY 2024-24 Adopted Fee Schedule revised

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...of Occupancy/Condo Conversion $83.05 Each Unit (5) Close Existing Openings (a)...

Last Modified: 12/12/2024

2023092023-FY-23-24-Fee-Schedule-Final.pdf

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 09/20/2023

20230731-FY-23-24-Fee-Schedule-Final

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 07/31/2023

20230901-FY-23-24-Fee-Schedule_Final

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 09/01/2023

20231005-FY-23-24-Fee-Schedule_Final.pdf

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 10/05/2023

20230630-FY-23-24-Fee-Schedule-Final.pdf

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 07/10/2023

20230710-FY-23-24-Fee-Schedule-Final.pdf

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 07/10/2023

FY 2024-25 Adopted CIP_Final

25,000 10,300 10,558 10,769 10,985 11,204 47,103 125,919 K-11 Recycled Water Interior...Buena Vista 902,651 902,651 A-2 2244 N....As the City's...

Last Modified: 09/05/2024

1. Landlord-Tenant Commission_Redacted.pdf

(Per BMC Section 2-1-405, 2-1-406, 2-1-407) I Agree Acknowledgement No. 2 - City...(Per BMC...

Last Modified: 06/16/2022

1. Landlord-Tenant Commission_Redacted (1).pdf

(Per BMC Section 2-1-405, 2-1-406, 2-1-407) I Agree Acknowledgement No. 2 - City...(Per BMC...

Last Modified: 06/16/2022

Effective April 1st, Burbank Returns to a 2-Day Outdoor Watering Schedule

From April through October, Burbank will move back to two days per week watering schedule: Tuesdays and Saturdays only News - BWP.png Burbank is in Stage III of the Sustainable Water Use...

Last Modified: 04/01/2024

Downtown TOD Specific Plan Environmental Impact Report Scoping Meeting #2

The Community Development Department is releasing a Recirculated Notice of Preparation (NOP) of the Environmental Impact Report (EIR) being prepared for this project and is hosting an online EIR...

Last Modified: 09/13/2021

City of Burbank City Council District Formation Community Forum 2 of 8

City of Burbank City Council District Formation The City of Burbank is undergoing an exciting change intended to give residents a more powerful voice in local government. The City Council has...

Last Modified: 04/24/2023

20260422-2024 DIF Report for Website-001.pdf

improvements, Olive Recreation Center, Burbank Little Theater renovations, and minor interior...Adopted-CIP-Complete (2) 64 ...

Last Modified: 04/22/2026

202101_504 Hampton Rd_Decision Letter_Final_.pdf

www.burbankca.gov JUNE 2, 2021 ARTHUR ISRAELYAN 635 W....more than two stories in height; d.Non-structural or non-seismic storefronts,...

Last Modified: 06/02/2021

526 S Sunset Cyn Dr - Decision Letter

pedestrian circulation or pedestrian safety in the surrounding neighborhood; (2)...in the R-1 (Single Family Residential) within the designated Hillside area. ...

Last Modified: 02/16/2024

Attachment C - Objective Standards Consistency Matrix.pdf

Four (4) and more bedrooms: two and one-half (2 1/2) parking spaces. 2....any required front or street side yard, but...

Last Modified: 05/08/2023

Attachment C - Objective Standards Consistency Matrix.pdf 1

Four (4) and more bedrooms: two and one-half (2 1/2) parking spaces. 2....any required front or street side yard, but...

Last Modified: 06/26/2023

20260630-FY-26-27-Adopted-Fee-Schedule

$208.14 Each (b) Major (> 200 SF) $416.27 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $213.98 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/29/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet