Search Results

Showing results for "dWA 0812 2782 5310 Pemasangan Kitchen Set Bawah Per Meter Minimalis Karanganyar Karanganyar"

No results were found that matched the keywords: dWA 0812 2782 5310 Pemasangan Kitchen Set Bawah Per Meter Minimalis Karanganyar Karanganyar.
Search Results

2026 AUG ISSUED

(SERVICE IS FOR APARTMENT BUILDING, (9) METERS + (1) HSE METER)....NEW LOCATION. (5) METERS....Maintenance ...

Last Modified: 09/01/2026

20211229-FY-21-22-Fee-Schedule-Final.pdf

Based on current rate set by vendor Based on current rate set by vendor 5...Without Kitchen $65.00 1-3 Hours With ...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 06/20/2022

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

Based on current rate set by vendor Based on current rate set by vendor 4...Without Kitchen $65.00 1-3 Hours With ...

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 06/20/2022

20230309-FY-22-23-Adopted-Fee-Schedule.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 03/09/2023

20220620-FY-22-23-Adopted-Fee-Schedule.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 06/20/2022

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 06/20/2022

1821 N Bel Aire Dr_Planning Approved Plans

KITCHEN FAUCETS: 1.8 GPM WATER CLOSETS: 1.28 GALLONS PER FLUSH 2* URINALS: 0.5 GALLON...PER FLUSH...

Last Modified: 06/02/2026

1821 N Bel Aire Dr_Plans

KITCHEN FAUCETS: 1.8 GPM WATER CLOSETS: 1.28 GALLONS PER FLUSH 2* URINALS: 0.5 GALLON...PER FLUSH...

Last Modified: 05/06/2026

2023092023-FY-23-24-Fee-Schedule-Final.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 09/20/2023

20231005-FY-23-24-Fee-Schedule_Final.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 10/05/2023

20230731-FY-23-24-Fee-Schedule-Final

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 07/31/2023

20230901-FY-23-24-Fee-Schedule_Final

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 09/01/2023

20230630-FY-23-24-Fee-Schedule-Final.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 07/10/2023

20230710-FY-23-24-Fee-Schedule-Final.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 07/10/2023

2026 JUL ISSUED

$4,700.00Valuation: INSTALLATION OF TWO NEW WALL MOUNTED ILLUMINATED SIGNS AND RELOCATE ONE SET...NEW LOCATION. (1) METER....NEW LOCATION. (1)...

Last Modified: 08/10/2026

250220_City of Burbank - Home Again Los Angeles

METERING/SERVICE (BWP RULES AND REGULATIONS 2.61-2.75 PER BMC 8-2-203) 3e.i....FROM WALL (PER FAIR HOUSING ACT) 30"...

Last Modified: 02/25/2025

2025 OCT ISSUED

(SERVICE WILL BE FOR UNIT A-F AND HSE METER)....Permit Type: BS2508065 2526 N 10/06/2025 NAOMI ST Sign $5,000.00Valuation: One Set...148 S...

Last Modified: 11/03/2025

2025 MAR ISSUED

REPLACE 320 SF OF DRYWALL IN KITCHEN & LIVING ROOM....360 E 03/11/2025 MAGNOLIA BLVD Sign $10,000.00Valuation: INSTALLATION OF 5 SETS...SEISMIC...

Last Modified: 04/04/2025

3209 Castleman Ln Approved Plans.pdf

(E) ELECTRICAL METER W .M ....KITCHEN FAUCETS 1.8 GPM WATER CLOSETS 1.28 GALLONS PER FLUSH 2* URINALS 0.5...

Last Modified: 12/14/2022

Pickwick Amended Tentative Map and Plans.pdf

CURB OF SHELTON STREET AND 50.5 FEET NORTH OF THE NORTH CURB OF ALAMEDA AVENUE SET...Key Map Scale: NTS Equestrian Crossing Signage set inside...

Last Modified: 10/14/2022

2026 JUN ISSUED

BS2603102 201 E 06/01/2026 MAGNOLIA BLVD Sign $2,000.00Valuation: Install 2 Sets...NON-STRUCTURAL KITCHEN REMODEL (PLUMBING ONLY)....(1)...

Last Modified: 07/01/2026

Attachment A - Approved Plans

METER BALCONY 50 SQ.FT....METERING FAUCETS- 25 GALLONS PER CYCLE F....METERING FAUCETS- 25...

Last Modified: 11/16/2026

2025 APR ISSUED

KITCHEN REMODEL PLUS 300 SF OF DRYWALL. SUBJECT TO FIELD VERIFICATION....TO NEW LOCATION PER BWP METER SPOT ...

Last Modified: 05/01/2025

2025 DEC ISSUED

stack section and reinstall new 400 amp fuseable disconnect meter section, 10 meters...Kitchen remodel, close/replace ...

Last Modified: 01/02/2026

2025 AUG ISSUED

PEYTON AVE Multi-Family Repair and Maintenance $16,500.00Valuation: TILE RE-SET...RELOCATE LAUNDRY TO KITCHEN. NEW 138.5 SF ATTACHED COVERED...

Last Modified: 09/02/2025

2026 OCT ISSUED

REMOVE ALL DRYWALL AND REMODEL KITCHEN AND BATHROOMS....BS2610925 3400 10/13/2026 RIVERSIDE DR Sign $1,000.00Valuation: INSTALL (1)...

Last Modified: 11/02/2026

2025_FAQ_Parking_Information

The hourly parking fee will be set to ensure that drivers always at least one or...The parking fee will be set at $2.00...

Last Modified: 02/23/2025

2026 JAN ISSUED

KITCHEN AND BATHROOM REMODEL....& INSTALLING 200 AMP PANEL WITH 2 METERS....SAME LOCATION. (1) METER.

Last Modified: 02/06/2026

2025 TI Correction List

LAVATORY 0.5 GALLONS PER MINUTE AT 60 PSI KITCHEN FAUCET 1.8 GALLONS PER MINUTE...GALLONS PER...

Last Modified: 05/28/2026

2026 SEPT ISSUED

section. (3) meters for tenant metering & (1) meter for house power....REPLACE (1) KITCHEN...

Last Modified: 10/01/2026

Planning_2021_ 929 E San Jose Project Plans.pdf

FIXTURES INCLUDE WATER CLOSETS, URINALS, SHOWERHEADS, LAVATORY FAUCETS, & KITCHEN...METER/ PANEL (E) TANKLESS W/H (E) AC CONDENSER (E) GAS ...

Last Modified: 12/07/2021

123 S Victory - Decision Letter & Attachments - 261109.pdf

If appealed, this decision will be set aside, and the Planning Commission will conduct...None of the exceptions set forth in Section 15300.2 of...

Last Modified: 11/09/2026

2025 MAY ISSUED

New deck per plan. Subject to field inspection....ADD CANNED LIGHTS IN BEDROOMS, HALLWAY & KITCHEN. NEW SUBPANEL....VENT FANS, & (1)...

Last Modified: 07/07/2025

Burbank City Council Goal Setting Meeting

On January 23, 2025, the Burbank City Council held a Goal Setting Special...(January 24, 2025) – On January 23, 2025, the Burbank City Council held a Goal...

Last Modified: 01/24/2025

Decision Letter - 2710 Winona Ave - AUP - 2.28.26 (all attachments)

OF 1 PER SECTOR, 3 TOTAL) NOTES: 1....OF 5 PER SECTOR, 15 TOTAL) F.S....It is expressed as Watts per square ...

Last Modified: 03/02/2026

City Council’s Special Goal Setting Meeting

Join us for the City Council’s Special Goal Setting Meeting on Thursday...The goal- setting process helps the Council shape a vision for the future by exploring...community challenges and...

Last Modified: 01/13/2025

2025 JAN ISSUED

RELOCATE LAUNDRY, KITCHEN REMODEL, RELOCATE GAS METER. REMODEL AREA - 290 SF....Per plan....SEISMIC RETROFIT OF 1...

Last Modified: 02/04/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet