Search Results

Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo.
Search Results

Resolution_No._22-29290.pdf

DEPARTMENT MANAGER TOTAL COMPENSATION....Total compensation may be reviewed, adjusted, and/or approved by the City Manager...An employee is not...

Last Modified: 02/07/2022

SB35 Criteria Letter_2022-02-15.pdf

of 10.2 percent of the total units being affordable....More specifically, the Project will dedicate a minimum of 10 percent of the total...of 10.2...

Last Modified: 03/04/2022

20220227-Exit-Letter-FY-June-30-2022.pdf

66,477,000$ Current year misstatement as a % of financial statement totals...-$ -$ Financial statement...

Last Modified: 02/27/2023

PBV Final Draft Burbank RFP_update 1.pdf

Number of PBVs requested: # of PBVs Total units in project PBV % of total...Monthly rents (b x c) ...

Last Modified: 06/06/2024

20220713-burbank-community-survey-001.pdf

Don't Know Total Supp....Don't Know Total Supp....Total Opp. 77% 21% 71% 26% 71% 27% 65% 32% 63% 34% (Ranked by...

Last Modified: 07/12/2022

15-28,741 - 2015 Primary Election Results.pdf

COUNCIL EXHIBIT A Gabel-Luddy Guillen Springer Rogers Stearns-Niesen Rizzotti Nos Total...57 117 55 84 55 330 194 141 80 32 114 33 98 51 313 VBM 28 21 11 30 13 22 11 87...

Last Modified: 02/11/2021

11/16/21 - PH - Attachment 17

The first office option comprises four 55-foot tall buildings that contain a total...Under Option 2, approximately 80% of the total Project floor...

Last Modified: 11/04/2021

20221027 Home Occupation Application.pdf

ZONING REVIEW $ LICENSE FEE $ ADJUSTMENT AMT $ CSA FEE $ TOTAL...$ $ $ $ EMPLOYEE LEVY: ________ X $_______ = $______________ ...

Last Modified: 10/27/2022

LID Reporting Information.pdf

Location (at least 6 decimals): Parcel APN: Project Type: BMP Type: Total...Native Soil: Managed by BMP: acres Project Storage Capacity: ac-ft ...

Last Modified: 06/20/2023

SR - Development Impact Fees_Final.pdf

$0.35 $0.32 $61.00 Transportation DIF $26.62 $16.11 $9.62 $3.80 $6,599.00 TOTAL...New) $363 $285 $227 $178 Transportation DIF $8,411 $3,490 $5,257 $2,181 ...

Last Modified: 05/26/2022

20210401_3700RD_Appendix_H.pdf

The total number of Project trips also reflects the expected internal capture of...Site Plan Figure 1 Rate % In % Out Rate % In % Out In Out...

Last Modified: 04/12/2021

Appendix 11.1H_Traffic.pdf

The total number of Project trips also reflects the expected internal capture of...Site Plan Figure 1 Rate % In % Out Rate % In % Out In Out...

Last Modified: 11/29/2021

20260422-DIFSR-001.pdf

Library $1,888 $1,483 IT (New) $454 $356 Transportation DIF $10,514 $4,362 TOTAL...IT (New) $363 $285 $227 $178 Transportation DIF $8,411 $3,490 $5,257 $2,181 ...

Last Modified: 04/23/2026

20260422-DIFA11-001

Library $1,888 $1,483 IT (New) $454 $356 Transportation DIF $10,514 $4,362 TOTAL...IT (New) $363 $285 $227 $178 Transportation DIF $8,411 $3,490 $5,257 $2,181 ...

Last Modified: 04/23/2026

20210301 - FY 18-19 Annual Report

$9,242,845 Total; $1,848,569 Deposited in the LMIHAF. 2 The amount deposited...Total units created = 6 based on expenditures from January 1,...

Last Modified: 04/30/2021

10032023-Appendix G_Average Daily Traffic and Speeds January 2023-001.pdf

Total 957 TOTAL PM Period TOTAL 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45...DAILY TOTALS...

Last Modified: 10/03/2023

2025 Exec Resolution_No._25-29622.pdf

DEPARTMENT MANAGER TOTAL COMPENSATION....Total compensation may be reviewed, adjusted, and/or approved by the City Manager...An employee is not...

Last Modified: 04/01/2026

Attachment 3 Project Application.pdf

percent of the Area Median Income (AMI)), resulting in a 10.8 percent of the total...of 10.8 percent of the total units being affordable....of...

Last Modified: 10/20/2022

Attachment K - Preliminary Hydrology Study.pdf 1

The project totals 0.88 acre site. 2.1.1 Project Location The project site is...Currently the project prior to dedication with a total...

Last Modified: 06/26/2023

Attachment K - Preliminary Hydrology Study.pdf

The project totals 0.88 acre site. 2.1.1 Project Location The project site is...Currently the project prior to dedication with a total...

Last Modified: 05/11/2023

5-3 - PH Attachment 3

Answered: 35 Skipped: 0 TOTAL 35 Novice – I am somewhat awa......Answered: 34 Skipped: 1 TOTAL 34 Very likely – I use very......Answered: 35...

Last Modified: 04/21/2022

Attachment 3 - Community Survey.pdf

Answered: 35 Skipped: 0 TOTAL 35 Novice – I am somewhat awa......Answered: 34 Skipped: 1 TOTAL 34 Very likely – I use very......Answered: 35...

Last Modified: 04/21/2022

6-22-21 PH - ATTACHMENT 1

2022 Total 2022 Total Total Water Use Total Water Use [Use Worksheet] 12,777...

Last Modified: 06/10/2021

20260421-ChandlerReso2020-001.pdf

The total project amount will be $3,299,105. C....Director is authorized to make such other revisions, changes in summaries, fund totals...,...

Last Modified: 04/21/2026

20201210.BudgetataGlance16_17Adopted.pdf

INCREASED COSTS: Salaries and benefits currently comprise 78 percent of the total...The adopted appropria- tions for all funds total ...

Last Modified: 12/10/2020

5-25-21 PH - Attachment 7 - FY 21-22 Public Budget Hearing.pdf

Revenues 859 877 894 912 930 Total...2,963 3,051 3,147 3,229 Non-Recurring...

Last Modified: 05/13/2021

20210301_AppendixGHazardsandHazardous2_Avionre.pdf

TPH-total was detected in two samples, WC-LDNE (Loading Dock – Northeast) and WC-TC4...TONS ...

Last Modified: 03/31/2021

ApxJ_PublicServicesDocumentation.pdf

Burbank Fire has a total suppression staff of 36 per day....We have a combined total of 285 full-time and part-time employees....Violent Crimes:...

Last Modified: 07/09/2021

Staff Report Budget Public Hearing FY 2025-26 CCO edits updated FINAL

The total appropriations for the FY 2025-26 Proposed Budget of approximately $1...Parking Authority 1,706,027 1,475,486 ...

Last Modified: 05/22/2025

Staff Report Budget Public Hearing FY 2026-27 Final

The total appropriations for the FY 2026-27 Proposed Budget of approximately $1...Parking Authority 2,329,126 1,715,837 ...

Last Modified: 05/21/2026

Resolution_No._23-29467 [Z].pdf

TOTAL COMPENSATION Total compensation may be reviewed and adjusted as necessary...An employee is not eligible for this conversion policy if...

Last Modified: 09/28/2023

Attachment 9 - Cover Memo DPs Budget Public Hearing 6.13.23 cm edits FINAL.pdf

- Income Households 2. 3x $2,150 ($6,450 current total) Burbank Median Rent for...The total cost for all these services is $583,121 ...

Last Modified: 06/02/2023

Attachment 9 - Cover Memo DPs Budget Public Hearing 6.13.23 cm edits FINAL (1).pdf

- Income Households 2. 3x $2,150 ($6,450 current total) Burbank Median Rent for...The total cost for all these services is $583,121 ...

Last Modified: 06/02/2023

Attachment 9 - Cover Memo DPs Budget Public Hearing 6.13.23 cm edits FINAL (2).pdf

- Income Households 2. 3x $2,150 ($6,450 current total) Burbank Median Rent for...The total cost for all these services is $583,121 ...

Last Modified: 06/02/2023

SB330 Preliminary Application - Burbank (DEC 2024)

No. of Units Total No. of Affordable Units Total No. of Density Bonus Units...here): Residential Nonresidential...

Last Modified: 12/30/2024

PBV Final Draft Burbank RFP .pdf

Number of PBVs requested: # of PBVs Total units in project PBV % of total...Monthly rents (b x c) ...

Last Modified: 06/04/2024

PBV Final revised 06-06-24 Burbank RFP_ ML Rev.pdf

Number of PBVs requested: # of PBVs Total units in project PBV % of total...Monthly rents (b x c) ...

Last Modified: 06/06/2024

Project Based Vouchers - Proposal Package..pdf

Number of PBVs requested: # of PBVs Total units in project PBV % of total...Monthly rents (b x c) Total # of...

Last Modified: 04/14/2026

2235 N Frederic St - Project Plans - 10-7-22.pdf

R-3 OCCUPANCY GROUP TOTAL FLOOR AREA: NEW S.F.D. 2ND FLOOR 1ST FLOOR TOTAL (R...-3) SUB TOTAL SUB...

Last Modified: 10/24/2022

ApxL3_WaterSupplyAssessment.pdf

As detailed in , the Project would develop a total of approximately 937,613 sf...Required per BMC 919 vehicle parking spaces Total Vehicle...

Last Modified: 07/09/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet