Search Results

Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo.
Search Results

3407 Viewcrest Dr - HDP - Public Notice.pdf

an 80 square foot first floor addition on the east side of the residence with a total...an 80 square foot first floor addition on the east side of the residence with a...

Last Modified: 05/10/2023

2018 W Burbank Blvd - CUP - plans

TOTAL: 1,800 SQ.FT....SEATING: INDOOR SEATING: 50 SEATS OUTDOOR SEATING: 16 SEATS TOTAL: 56 SEATS

Last Modified: 01/29/2024

622 East Tujunga Ave - Decision Mailing Notice (Final)

applicable given that the project consists of a multi-family residential structure, totaling...applicable given that the project consists of a multi-family residential...

Last Modified: 06/18/2025

618 East Tujunga Ave - Decision Mailing Notice (Final)

applicable given that the project consists of a multi-family residential structure, totaling...applicable given that the project consists of a multi-family residential...

Last Modified: 06/18/2025

618 East Tujunga Ave - Updated Decision Mailing Notice

applicable given that the project consists of a multi-family residential structure, totaling...applicable given that the project consists of a multi-family residential...

Last Modified: 09/18/2025

622 East Tujunga Ave - Updated Decision Mailing Notice

applicable given that the project consists of a multi-family residential structure, totaling...applicable given that the project consists of a multi-family residential...

Last Modified: 09/18/2025

COMMERCIAL APPLICATION

INDUSTRIAL (F) MIXED USE RETAIL (M) HAZARD COMMERCIAL REROOF TYPE OF ROOF TOTAL...EXISTING BUSINESS NAME: NEW BUSINESS NAME: SQUARE FOOTAGE: HAZARD: Off ...

Last Modified: 03/26/2026

Updated_Preliminary_Hydrology_Report.pdf

2.2.6 Impervious Cover The proposed project will have a net increase in total...The proposed residential development project will increases the site’s overall...

Last Modified: 10/29/2024

Updated_Preliminary_Hydrology_Report (1).pdf

2.2.6 Impervious Cover The proposed project will have a net increase in total...The proposed residential development project will increases the site’s overall...

Last Modified: 10/29/2024

Preliminary_Hydrology_Report_second page

2.2.6 Impervious Cover The proposed project will have a net increase in total...The proposed residential development project will increases the site’s overall...

Last Modified: 05/14/2024

Preliminary_Hydrology_Report.pdf

2.2.6 Impervious Cover The proposed project will have a net increase in total...The proposed residential development project will increases the site’s overall...

Last Modified: 01/11/2024

2025 DEC ISSUED

TOTAL SF: 5000....TOTAL SF:6500....TOTAL SF:800.

Last Modified: 01/02/2026

536 Plan Set.pdf

TOTAL MAX S.F. = 4,067.1 S.F. PROPOSED: 4,065.57 S.F....TOTAL PROPOSED LOT COVERAGE: 2,658 S.F....TOTAL MAX...

Last Modified: 11/08/2022

536 Stanford Rd_Approved Plans.pdf

TOTAL MAX S.F. = 4,067.1 S.F. PROPOSED: 4,065.57 S.F....TOTAL PROPOSED LOT COVERAGE: 2,658 S.F....TOTAL MAX...

Last Modified: 12/01/2022

4007 Riverside Drive - plans.pdf

FT_ 15% OF TOTAL TENA�'T -SPACE 1.475 SQ. FT. x 0.15 • 2"21.25 SQ....FT. 1.S% OF TOTAL TENAITT SPACE 1,47E SQ. FT. x 0.16"' 221.26...

Last Modified: 05/10/2023

SR - PD-96 Extension - 01.30.2024 FINAL.pdf

not extended, the DA will expire on March 19, 2024; approximately 66.4% of the total...approved seven-year DA extension, approximately 566,046 additional OE- GSF of the...

Last Modified: 01/18/2024

Attachment 1, Exhibit B - Consistency Matrix

Of this total, approximately 521.01 square feet (28%) is landscaped....feet and the total area of roof decks to be 7,031.2 square...

Last Modified: 11/19/2024

Treasurer's Report March 2018.pdf

2,424,000 2,424,000 2,418,032 Housing Authority 496,668 496,668 495,445 TOTAL...Market -0- 0% 20% 15% 0% Municipal Bonds 39,603 9% No limit 15% 3% ...

Last Modified: 03/09/2021

Treasurer's Report June 2018.pdf

Market -0- 0% 20% 15% 0% Municipal Bonds 42,021 9% No limit 15% 3% TOTAL...to Three Years 150,620 33% 0 to 50% Three to Five Years 176,396 38% 0 to 50% ...

Last Modified: 03/09/2021

CDBG Capital Projects RFP FY 2024-25 FINAL.pdf

Organization  Community Based Development Organization Total...Extremely low: under 30% Very Low: 31% to <50% Low: 51% to <80% ...

Last Modified: 10/21/2024

SR - Section 8 Five-Year Plan Admin Plan - FINAL(2)

Applied for and received a total of 15 Veteran Affairs Supportive Housing (VASH)...In the last five years, a total of four participants...

Last Modified: 03/27/2025

SR - Section 8 Five-Year Plan Admin Plan - FINAL(2) (1)

Applied for and received a total of 15 Veteran Affairs Supportive Housing (VASH)...In the last five years, a total of four participants...

Last Modified: 03/27/2025

2025 Sept Cal W Caucus FA

Last Modified: 07/28/2025

5-3 - PH Attachment 1

The total proportion of passenger VMT to total VMT in the City was used to estimate...Total City GGRP Update Emissions...

Last Modified: 04/21/2022

Attachment 1 - Exhibit 1 GGRP Update Draft_3.9.2022_wAPPS_PublicReview_reduced size.pdf

The total proportion of passenger VMT to total VMT in the City was used to estimate...Total City GGRP Update Emissions...

Last Modified: 04/21/2022

521 Amherst Dr - Mailing Notice.pdf

high along the front yard area to eight-feet high beyond the front yard for a total...high along the front yard area to eight-feet high beyond the front yard for a...

Last Modified: 07/13/2022

20201221-AUP-report-Measure-P-Sales-Tax Funds-FY-June-30-2020.pdf

As shown below, the total Non-Measure P revenue designated for infrastructure projects...reported by the California Department of Tax and Fee Administration on their...

Last Modified: 12/21/2020

FD9141 Haunted House Safety Requirements and Application

shall indicate proximity of event building to other structures or • Dimensions (total...Exception: When the total floor area is less than 1000...

Last Modified: 10/20/2025

2025 SEPT ISSUED

TOTAL SF:4000....TOTAL SF:5600....TOTAL SF:5600.

Last Modified: 10/06/2025

2021

Cafeteria Plan Other Pay and Cash Benefits Leave Payouts at Time of Separation Total...Cafeteria Plan Other Pay and Cash Benefits Leave Payouts at Time of...

Last Modified: 02/28/2022

Treasurer's Report March 2019.pdf

22% Money Market -0- 0% 20% 20% 0% Municipal Bonds 50,038 11% No limit 15% 3% TOTAL...to Three Years 217,082 46% 0 to 50% Three to Five Years 88,156 19% 0 to 50% ...

Last Modified: 03/09/2021

05.15.24_636 MARIPOSA_ISSUE FOR PLAN CHECK

1033,40 PLANE BREAK OFFSET - G3 TOTAL SIDE 20,42 AVERAGE SETBACK 50,61 3 3 3,00...COMMON OPEN SPACE 50 SF TOTAL: 300 SF 100 SF PRIVATE SPACE ...

Last Modified: 05/30/2024

Burbank2035 EIR Appendix F, Part 2.pdf

Table 2 presents a land use totals comparison table....[a] 25,863 31,193 31,193 31,193 31,193 34,835 Total D.U. D.U....A...

Last Modified: 07/29/2021

2025 NOV ISSUED

TOTAL SF:1000....TOTAL SF:7900....TOTAL SF:900.

Last Modified: 12/01/2025

Updated_Objective_Standards_Consistency_Matrix.pdf

In the Formal Application, the project proposes 45 total parking spaces for 40...Five percent of the total units of the Housing Development as...

Last Modified: 10/29/2024

Updated_Objective_Standards_Consistency_Matrix (1).pdf

In the Formal Application, the project proposes 45 total parking spaces for 40...Five percent of the total units of the Housing Development as...

Last Modified: 10/29/2024

Objective_Standards_Consistency_Matrix

In the Formal Application, the project proposes 47 total parking spaces for 40...The Project is proposing to set aside 15% of the unit total for...

Last Modified: 05/14/2024

Att3 - Management District Plan

Budget: The total BTBID annual assessment budget for the initial year of its ten...• Welcomed Hilton Garden Inn, bringing Burbank’s hotel total to...

Last Modified: 11/06/2025

GGRP Update Final_w.App.pdf

Table 5 – Total Daily VMT by TAZ Figure 2 – Year 2018 Percentage of Total...The total proportion of passenger VMT...

Last Modified: 10/23/2022

Exhibit A - 1 - GGRP Update Draft_3.9.2022_wAPPS_PublicReview.pdf

The total proportion of passenger VMT to total VMT in the City was used to estimate...Total City GGRP Update Emissions...

Last Modified: 03/10/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet