Search Results

Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo.
Search Results

20210526_Final_ Statement _FY_ 2021.pdf

$228,341.00 Grand Total: $1,141,698.00 Date: 5/26/2021 Publish: 6

Last Modified: 05/26/2021

20210526_Final_ Statement _FY_ 2021 (1).pdf

$228,341.00 Grand Total: $1,141,698.00 Date: 5/26/2021 Publish: 6

Last Modified: 05/26/2021

20210526_Final_ Statement _FY_ 2021 (2).pdf

$228,341.00 Grand Total: $1,141,698.00 Date: 5/26/2021 Publish: 6

Last Modified: 05/26/2021

20210526_Final_ Statement _FY_ 2021 (3).pdf

$228,341.00 Grand Total: $1,141,698.00 Date: 5/26/2021 Publish: 6

Last Modified: 05/26/2021

20210526_Final_ Statement _FY_ 2021.pdf

$228,341.00 Grand Total: $1,141,698.00 Date: 5/26/2021 Publish: 6

Last Modified: 05/26/2021

20210526_Final_ Statement _FY_ 2021 (1).pdf

$228,341.00 Grand Total: $1,141,698.00 Date: 5/26/2021 Publish: 6

Last Modified: 05/26/2021

20201221-GAS-Letter-FY-June-30-2020.pdf

significant value and the moving of completed construction projects had no impact on the total

Last Modified: 12/21/2020

20210101_FY 13-14 Annual Report.pdf

housing units have been developed: 280 Rental Units + 60 Ownership Units 340 Total

Last Modified: 05/20/2021

Attachment 1 - Resolution (1).pdf

THE FILING OF APPLICATIONS AND CERTIFICATIONS FOR HOME-ARP FUNDS TOTALING $1,896,632

Last Modified: 03/16/2023

5-3 - PH Attachment 2

staff time utilize telecommuting by 2030. 2030: 946 MT CO2e 2045: 824 MT CO2e Total

Last Modified: 04/21/2022

Attachment 2 - Summary of Strategies.pdf

staff time utilize telecommuting by 2030. 2030: 946 MT CO2e 2045: 824 MT CO2e Total

Last Modified: 04/21/2022

City of Burbank Report on IC (GAS) Final 01-13-25

unearned revenue and deferred revenue, a correcting entry was required to adjust total

Last Modified: 04/08/2025

Waste Warrior 2026 Program

(30 hours total).

Last Modified: 06/17/2026

Attachment 7 - City Comments.pdf

Project Location (at least 6 decimals): Parcel APN: Project Type: BMP Type: Total...and the new construction of six three-story residential structures, containing a...

Last Modified: 12/26/2023

2025 Burbank Solid Waste Management Rules Regulations 1.30.25

This would include total number of customers contacted by site visits (technical...The total number of Generator accounts in the city. ...

Last Modified: 05/22/2026

20210101_4210_National_ProjectPlans.pdf

.: TOTAL LIVING AREA : PROPERTY SUMMARY: SCOPE OF WORK: CS GENERAL NOTES 4210...A MINIMUM OF 50% OF THE TOTAL RATED LIGHTING IN...

Last Modified: 04/13/2021

20210622_2814_Empire_Ave_City_Response.pdf

housing, the project seeking approval dedicates a minimum of 10 percent of the total...housing, the project seeking approval dedicates a minimum of 10 percent of the...

Last Modified: 08/27/2021

20210101_Section 8 - 2020ADMINPLANFINAL.pdf

Expirations The Voucher is valid for a total term of 120 calendar days....The total amount of the overpayment. ...

Last Modified: 05/20/2021

ThePickwick_CompletePlanSet_2022-02-04.pdf

TOTAL LIVING 1816 SQ. FT. GARAGE 447 SQ....TOTAL LIVING 1816 SQ. FT. GARAGE 447 SQ. FT....TOTAL PROVIDED OPEN SPACE ...

Last Modified: 03/01/2022

Home Occupation Rules.pdf

110 and 220 volt circuit, with a maximum of one (1) horsepower per motor and a total...displayed on the premises in connection with the home occupation except for a...

Last Modified: 03/26/2021

Senior Rules- Rev 6-2021.pdf

• The total number of bases accumulated by the three hitters will determine the...• A team may borrow a maximum of two players from another team for a...

Last Modified: 10/29/2021

5-3 - PH SR

Carbon Sequestration Strategy 1 6 11 City Government 4 17 12 Adaptation 3 13 Total...The implementation of the total GGRP Update is estimated...

Last Modified: 04/21/2022

SR - Proposed GGRP Update Final.pdf

Carbon Sequestration Strategy 1 6 11 City Government 4 17 12 Adaptation 3 13 Total...The implementation of the total GGRP Update is estimated...

Last Modified: 04/21/2022

Attachment 1 - Resolution

The total number of written protests against the rate increases for water, sewer...____ Kimberley Clark, City Clerk A1-4 EXHIBIT A ...

Last Modified: 05/08/2025

2022-09 Treasurer's Report.pdf

weighted average yield of the portfolio at the end of the month is 2.23%% and the total...Across all income levels, households still hold a total...

Last Modified: 11/03/2022

2022-11 Treasurer's Report REVISION.pdf

weighted average yield of the portfolio at the end of the month is 2.47% and the total...Production and non-supervisory wages are now 85.6% of...

Last Modified: 04/04/2023

FEMA P-807-1 (2023)

In total, 122 archetypes were developed....flr. 181.9 115.2 2nd flr. 158.9 98.9 Total 302.0 187.8 Total 280.7 173.1 ...

Last Modified: 04/09/2024

20220216_2022_ADMIN_PLAN_DRAFT.pdf

Locally, HUD has provided a total of 67 vouchers distributed to the Burbank Housing...The total amount of the overpayment. ...

Last Modified: 02/16/2022

2022 ADMIN PLAN - DRAFT -.pdf

Locally, HUD has provided a total of 67 vouchers distributed to the Burbank Housing...The total amount of the overpayment. ...

Last Modified: 02/16/2022

20220216_2022_ADMIN_PLAN_DRAFT (1).pdf

Locally, HUD has provided a total of 67 vouchers distributed to the Burbank Housing...The total amount of the overpayment. ...

Last Modified: 02/16/2022

2/8/22 - PH - Attachment 2

DEMOLITION, WHOLE HOUSE: Means the demolition of at least 50% of the total length...The floor area ratio (FAR) is calculated using the total gross...

Last Modified: 01/27/2022

Attachment 2-V3-UPDATED.pdf

DEMOLITION, WHOLE HOUSE: Means the demolition of at least 50% of the total length...The floor area ratio (FAR) is calculated using the total gross...

Last Modified: 01/27/2022

20210101_550_N_Third_Street_Plans.pdf

Proposed Front of House 10,235 sf Back of House 7,105 sf Total 17,340 sf Ground...Marriott) Per Level Parking Stalls Standard 5 H/C 2 ...

Last Modified: 06/28/2021

CDD 10.29.2024 - SR- PH Appeal 800 S. Main FINAL

Each sector will have one antenna for a total of three antennas combined as shown...The WTF will occupy three areas on the roof of the building for a...

Last Modified: 10/18/2024

20130213_Chapter 3 - Land Use.pdf

 on a  lot and  the  total  land area of  that  lot. ... (2035)  10,966 50,219 116,516  52,019,676 Existing (2010) Totals  10,966...

Last Modified: 11/17/2021

Phase I

CARE HOMEHEALTH CARE INC� TOTAL CARE HOMEHEALTH CARE INC� TOTAL CARE HOMEHEALTH...CARE INC� TOTAL CARE HOMEHEALTH CARE...

Last Modified: 09/25/2025

20210101_608_N_Bel_Aire_ProjectPlans.pdf

38'-0" 638 36'-0" TOTAL...TOTAL LOT COVERAGE 50% OF LOT AREA=4473 S.F. (N) SFD FOOTPRINT 2307 S.F....TOP OF SLAB TS ...

Last Modified: 04/13/2021

2021_Planning_1701 Lima St Plans.pdf

2,814 SF MAX RFA = OK 1,034 SFEXISTING +937 SF = 1,329 SF NEW ADDITION SFD TOTAL...SF ACCORDING TO LA ASSESSOR BUT THIS CALCULATION INCLUDES THE ILLEGAL BREEZEWAY ...

Last Modified: 10/20/2021

2021 Burbank Police Community Study Final Report

A total of 876 completed responses were received during the research period, with...216 partial responses and a total of 2,412 survey...

Last Modified: 08/18/2025

2017 Burbank Police Community Study Final Report

A total of 830 completed responses were received during the research period, with...181 partial responses and a total of 1,956 survey...

Last Modified: 08/18/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet