Search Results

Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo.
Search Results

Inital Study (LaTerra).pdf

Total parking provided is 1,462 spaces, which exceeds the required parking by one...Retail 1,067 1-story − Hotel2 194,881 15-story 317 Basement 156,575 ...

Last Modified: 05/04/2021

REVISED 2023-05 Treasurer's Report.pdf

weighted average yield of the portfolio at the end of the month is 3.12% and the total...| 90 % US Treasury | No Limit 33,000,000 31,514,490 32,148,016 5.60 3.70 704 ...

Last Modified: 07/21/2023

August Staff Report.pdf

The total scores resulting from evaluation of the proposals and the interview process...operating expenses exceeded total revenue in any of the...

Last Modified: 09/20/2023

Youth Art Expo - Reception

With the support of more than 100 teachers, over 1,700 total submissions were received

Last Modified: 04/05/2022

Potential Rent Cap Study Community Meeting #3

There will be a total of five meetings.

Last Modified: 08/09/2024

Potential Rent Cap Study Community Meeting #2

There will be a total of five meetings.

Last Modified: 08/09/2024

Potential Rent Cap Study Community Meeting #5

There will be a total of five meetings.

Last Modified: 08/09/2024

Potential Rent Cap Study Community Meeting #4

There will be a total of five meetings.

Last Modified: 08/09/2024

Potential Rent Cap Study Community Meeting #1

There will be a total of five meetings.

Last Modified: 08/09/2024

1719 San Fernando Rd - Plans

TOTAL: 6,400 SQ.FT....1 2ND FLOOR (MEZZ) 60597 10 GROUND FLOOR 2005,803 2ND FLOOR 200597 2.99 ...

Last Modified: 09/09/2022

Workers Compensation Supervisors Packet 042021.pdf

If the doctor places the employee on total disability, please keep in touch with...EMPLOYEE USUALLY WORKS regular, full-time part-time EXTENT OF INJURY ...

Last Modified: 04/20/2021

ApxG2_PhaseIIESA.pdf

The approximately 10.2-acre parcel is occupied by three one-story structures that total...In total, 109 confirmation soil samples were collected...

Last Modified: 07/09/2021

2025-08-08_Full Set (Arch+Civil+Land) - Copy

COVERED PATIOS_________________________1,451.93 SF TOTAL GROSS AREA____________...Cut/Fill Summary Name rough grading Totals Cut Factor 1 ...

Last Modified: 12/02/2025

20210527_3401_Empire Ave_Plans.pdf

PARKING REQ'D (2: 1,000 SF; MEDIA SERVICES USE) 54 TOTAL PARKING PROVIDED 54 ADA...TOTAL OCCUPANTS: 91 (46 MALE/ 46 FEMALE) 1:1-50-TOILETS-MEN...

Last Modified: 05/27/2021

Attachment 2.pdf

clarify if there is a proposed manager’s unit, and whether it is included in the total...more than 10 residential units are proposed, at least 10 percent of the project's...

Last Modified: 05/02/2023

09-2025 PROJECT PLACE.pdf

12 / One-Bedroom 5 / One-Bedroom Exempt Units / Sta� Total 1 / Two-Bedroom...475-6083 Echo Park Senior Housing 1727 Morton Avenue Los Angeles 90026...

Last Modified: 10/06/2025

1036 Sherlock Dr _Decision Letter_Final

Total length of all walls to be demolished divided by total length of all existing

Last Modified: 07/12/2024

Project No.24-4476 - 3000 Haven Way - HDP - Decision Letter 3.10.26

SF FIRST 7,500 SF @0.4 FAR 3,000.0 SF REMAINING 1,810.95 SF @0.3 FAR 543.3 SF TOTAL...FLOOR: 1,143 SF ADU: 787 SF 1,963 + 121 + 29 + 10 + 263 + 1,143 = 3,529 SF ...

Last Modified: 03/11/2026

1036 Sherlock Dr_HDP Plans_v2

AutoCAD SHX Text FIRST FLOOR AutoCAD SHX Text SECOND FLOOR AutoCAD SHX Text TOTAL...FILL=6.5*5+3.8*7+3.6*4=73.5 CF S=6.5 SF S=3.6 SF TOTAL...

Last Modified: 06/12/2024

UPDATED PLANS

HAVEN WAY 15.75' 3325 HAVEN WAY 11.50' 3331 HAVEN WAY 18.25' 3337 HAVEN WAY 22.58' TOTAL...DOOR 13 4 4 4 44 5 5 4 31'-10" 6'-6" 20'-11" DEMOLITION CALCULATIONS: ...

Last Modified: 05/06/2024

Project Plans FINAL

CUT TOTAL FILL NET EXPORT/IMPORT CY CY CY EXPORT 1727 RUDELL RD....Cut -59 - Fill 17 - Shrinkage 2 10% Shrinkage Accounted Total Fill 19 -...

Last Modified: 06/02/2026

3001 SB 35 - Phase I Report.pdf

which includes detailed descriptions of the databases noted below as well as the total...DRAFT MAP FINDINGS SUMMARY Search TargetDistance Total...

Last Modified: 06/26/2023

801 South Sixth Street_SB 35 Decision Letter_FINAL 2

The Project is proposing a total lot coverage of 66.3%....The Project proposes a total of 39 dwelling units....39 UNITS ...

Last Modified: 09/10/2025

801 South Sixth Street_SB 35 Decision Letter_FINAL2

The Project is proposing a total lot coverage of 66.3%....The Project proposes a total of 39 dwelling units....39 UNITS ...

Last Modified: 02/25/2026

FINAL - CAO Solitation for Mediators.pdf

City shall pay for services of Mediator the total fixed price of $___1,000___ per

Last Modified: 01/16/2025

SB 35 SUPPLMENTAL APPLICATION - ELIGIBILITY CHECKLIST (DEC 2024)

more than 10 residential units are proposed, at least 10 percent of the project's total

Last Modified: 12/30/2024

Art Experience Camp Parent Handbook 2022.pdf

We do not distribute a cumulative total of day camp fees or reprint receipts

Last Modified: 03/17/2022

Tin Horn Flats Myths and Facts Clean 4.22.21 Final.pdf

The City has provided two separate series of small business loans totaling $1,414,104

Last Modified: 04/26/2021

Adult Slow Pitch-Rev 4.30.21.docx

· The total number of bases accumulated by the three hitters will determine the

Last Modified: 04/30/2021

Planning_2021_SB 35 NOI APPLICATION & APPLICATION final.pdf

more than 10 residential units are proposed, at least 10 percent of the project's total

Last Modified: 01/26/2022

FY 2023-24 CDBG Request for Funding Proposals and Exhibits final.pdf

Organization  Community Based Development Organization Total

Last Modified: 02/24/2023

FY 2023-24 CDBG Request for Funding Proposals and Exhibits final (1).pdf

Organization  Community Based Development Organization Total

Last Modified: 02/24/2023

Art Experiences Camp Parent Handbook 2023.pdf

We do not distribute a cumulative total of day camp fees or reprint receipts

Last Modified: 03/13/2023

5-3 - PH Attachment 6

● Burbank shall target 2050 as the year the City will go totally carbon-neutral

Last Modified: 04/21/2022

Attachment 6 - Sustainable Commissions Letter to City Council.pdf

● Burbank shall target 2050 as the year the City will go totally carbon-neutral

Last Modified: 04/21/2022

2801 Thornton Ave_07-31-2024

PLAN NORTH 07.31.24 0 20'10' 40'5' scale: 1" = 20'-0" PROPOSED BUILDING 'E' TOTAL

Last Modified: 04/03/2025

Youth Art Expo 2022

Last Modified: 07/28/2025

201 E Magnolia Blvd - Plans

EXISTING EGRESS DOOR LEADING TO EXIT PASSAGEWAY PRESUMED TO SWING 180 DEGREES TOTAL

Last Modified: 02/02/2026

Staff Report.pdf

The total project cost has been estimated at $3,299,105 of which 80%, or $2,639,284

Last Modified: 02/23/2026

20201210-UUT-Article-11-Ordinance.pdf

pay a penalty for such delinquencies at the rate of fifteen percent (15%) of the total...The penalty for delinquency shall be fifteen percent (15%) on the...

Last Modified: 10/19/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet