Search Results

Showing results for "dWA 0821 1305 0400 [[ADEFA]] Pusat Geocomposite Landfill di Pandeglang Banten"

No results were found that matched the keywords: dWA 0821 1305 0400 [[ADEFA]] Pusat Geocomposite Landfill di Pandeglang Banten.
Search Results

Treasurer's Report November 2018.pdf

2019 245,000.00 1826 245,000.00 1.950 229 54438CRE4 5844 1 GP 15-01 (LA COMM COLL DIS...CC 12/27/2017 3,000,000.00 2.440 06/27/2022 3,000,000.00 1643 3,000,000.00 2.440...

Last Modified: 03/09/2021

7-13-21 BCC - 1. Infrastructure Oversight Board_Redacted.pdf

• Completed analysis of landfill gas collection piping system, report recommended...• Completed mechanical installation of replacement landfill-gas...

Last Modified: 06/17/2021

20210519_504_Hampton_Road.pdf

MINIMUM 50% OF GENERATED DEBRIS SHALL BE RECYCLED, REUSED, OR DIVERTED FROM THE LANDFILL...MINIMUM 50% OF GENERATED DEBRIS SHALL BE RECYCLED, REUSED, OR DIVERTED FROM THE...

Last Modified: 05/18/2021

Appendix F_HazMat Studies_Part 1.pdf

PLASTIC/NONMETALLIC DRUM Di. FIBER DRUM o m. GLASS BOTTLE o q. RAILCAR o b....PLASTIC/NONMETALLIC DRUM Di. FIBER DRUM Om. GLASS BOTTLE o q....

Last Modified: 12/13/2024

2025 AUG ISSUED

TAVITIAN 818-312--0 91367CAWOODLAND HILLS Contractor 5942 LUBAO AVENUE Fernando Di...TI - Plumbing - The triple sink will be replaced for a kitchen sink. # Fernando...

Last Modified: 09/02/2025

2010.pdf

108,309.44$ SHAY, DENNIS PW:PUBLIC WORKS DPT LANDFILL

Last Modified: 01/20/2021

2011.pdf

11,826.17$ 108,431.46$ SHAY, DENNIS LANDFILL

Last Modified: 01/20/2021

2012.pdf

16,052.36$ 106,915.91$ SHAY, DENNIS LANDFILL

Last Modified: 01/20/2021

2013.pdf

8,819.40$ 114,954.79$ SHAY, DENNIS LANDFILL

Last Modified: 01/20/2021

2013 Earnings for Website 100K Employees.pdf

8,819.40$ 114,954.79$ SHAY, DENNIS LANDFILL

Last Modified: 12/22/2020

2012 Earnings for Website 100K Employees.pdf

16,052.36$ 106,915.91$ SHAY, DENNIS LANDFILL

Last Modified: 12/22/2020

2011 Earnings for Website 100K Employees.pdf

11,826.17$ 108,431.46$ SHAY, DENNIS LANDFILL

Last Modified: 12/22/2020

2010 Earnings for Website 100K Employees.pdf

108,309.44$ SHAY, DENNIS PW:PUBLIC WORKS DPT LANDFILL

Last Modified: 12/22/2020

3_20_25 City of Burbank Compliant Product List

then feasibly recycled, salvaged, processed, or marketed by any means other than landfilling

Last Modified: 04/01/2026

2026.06.22 Def-Resp. City of Burbank -Cross-Complaint w exhs.

Andrews Catholic Church (311 North Raymond Avenue) • Holliston Community Church (1305...Waste generation, landfill, and water transport represent...

Last Modified: 06/26/2026

2025 APR ISSUED

2025 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2503953 1305...COOL ROOF COMP SHINGLES EDWIN & CYNTHIA RAMOS 8186359998 91506CABURBANK Owner...

Last Modified: 05/01/2025

Attachment E - City Department Comments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 01/17/2023

UpperLARiver_Draft_Appendix4b.pdf

7 Diversion Structure 1 EA $8,000.00 $8,000 8 Force Main 30" DI...6 Connection to Existing Wet-Well 1 LS $350.00 $350 7 Force Main 16"...

Last Modified: 03/25/2021

20210208-Complete-Streets-Plan-Filipino-001.pdf

paghahambing, isang-kapat lamang ng mga residente ng Los Angeles County ay mga di...Ang Plano ay partikular na nakabalangkas ng mga di-tradisyonal...

Last Modified: 02/08/2021

DEIR Appendix G-4A (LaTerra).pdf

ND ND ND ND ND 40 (9) μg/m3 Ethyl-tert-butylether ND ND ND ND ND 40 (22) μg/m3 Di-isopropylether...ND ND ND ND ND 40 (9) μg/m3 Ethyl-tert-butylether ND ND ND ND ND 40...

Last Modified: 05/04/2021

1719 San Fernando Rd - Plans

MINIMUM 65% OF GENERATED DEBRIS SHALL BE RECYCLED, REUSED, OR DIVERTED FROM THE LANDFILL

Last Modified: 09/09/2022

2014.pdf

14,185.44$ 114,315.03$ SHAY, DENNIS LANDFILL

Last Modified: 01/20/2021

2014 Earnings for Website 100K Employees.pdf

14,185.44$ 114,315.03$ SHAY, DENNIS LANDFILL

Last Modified: 12/22/2020

Bulky Item Pick-Up

Last Modified: 02/25/2026

20200121-2014-Series-A-Wastewater-Treatment-Revenue-Bonds.pdf

18th Floor San Francisco, CA 94108 (415) 391-5780 (415) 391-5784 (Fax) clyn di...Governmental co 9U000 8OJDO S'T DUO SOD DUO -R __________ 551 300 U4...

Last Modified: 01/21/2021

Adopted Burbank Housing Element_clean-for printing.pdf

The City owns and operates the Burbank Landfill, which has an expected closure...exclusively dependent on the City’s landfill....floor ...

Last Modified: 06/29/2023

Adopted Burbank Housing Element.pdf

The City owns and operates the Burbank Landfill, which has an expected closure...exclusively dependent on the City’s landfill....floor ...

Last Modified: 06/29/2023

ATTACHMENT 3 (2).pdf

The City currently sends its residential waste to multiple landfills and is not...exclusively dependent on the City’s landfill....ground floor ...

Last Modified: 09/16/2022

2022_Adopted_Burbank Housing_Element_clean.pdf

The City currently sends its residential waste to multiple landfills and is not...exclusively dependent on the City’s landfill....ground floor ...

Last Modified: 10/21/2022

20230701_Burbank_Zero-Emission_Bus_Rollout_Plan.pdf

Ca pi ta l E xp en di tu re s ( O ne Ti m e Co st s) Type Details...Dual Port) $5,068 100 kW (Single Port) $58,366 O pe ra tio na l E xp en ...

Last Modified: 09/27/2023

Consistency Matrix - SB 35 NOI

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The Project

Last Modified: 09/25/2025

Project Applicant's Submitted Consistency Matrix

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The Project

Last Modified: 09/25/2025

20210301_CityofBurbankAvionDraftEIR_Avion.pdf

Forest fires, decomposition, industrial processes, landfills, and consumption of..., such as the presence of a landfill gas capture system and...

Last Modified: 03/31/2021

Pickwick Amended Tentative Map and Plans.pdf

& ESPALIERS Bougainvillea 'Monka' Bougainvillea Pandorea jasminoides 'Lady Di

Last Modified: 10/14/2022

20201216.AdoptedCIP17_18.pdf

605,000 H-28 Implement New Grandview Modules BWP 75,488 50,000 125,488 H-29 Landfill...50,000 605,000 H-28 Implement New Grandview Modules 75,488 50,000 125,488 ...

Last Modified: 12/16/2020

2017 Earnings for Website 100k Employees (Updated 03.05.2020).pdf

-$ 103,192.75$ JORDAN, CURTIS LANDFILL

Last Modified: 03/15/2021

2018 Earnings for Website 100k Employees (Updated 03.05.20).pdf

-$ 109,359.17$ JORDAN, CURTIS LANDFILL

Last Modified: 03/15/2021

2017 Earnings for Website 100k Employees.pdf

-$ 103,192.75$ JORDAN, CURTIS LANDFILL

Last Modified: 03/15/2021

2018 Earnings for Website 100k Employees.pdf

-$ 109,359.17$ JORDAN, CURTIS LANDFILL

Last Modified: 03/15/2021

2018 Earnings for Website 100k Employees.pdf

-$ 109,359.17$ JORDAN, CURTIS LANDFILL

Last Modified: 03/15/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet