Search Results

Showing results for "dWA 0821 1305 0400 [[ADEFA]] Vendor Jual Paving Ramah Lingkungan Wilayah Takalar Sulawesi Selatan"

No results were found that matched the keywords: dWA 0821 1305 0400 [[ADEFA]] Vendor Jual Paving Ramah Lingkungan Wilayah Takalar Sulawesi Selatan.
Search Results

BFF MOU - 2025-2028 -Fully Executed.pdf

It is recognized that through the City's bid process, the successful vendor...the alternate purchase and be reimbursed up to the cost negotiated, with said...

Last Modified: 08/26/2025

Att3 - CDBG Applications

2027ATTACHMENT 3 - 79 Roof to be constructed depending on availability of materials, vendors...system within 6 months of funding receipt (subject to availability of...

Last Modified: 06/04/2026

ThePickwick_CompletePlanSet_2022-02-04.pdf

Enhanced paving at main project entry....Integral colored concrete paving at open space gathering. 4' wide community natural...Exhibit 80' Scale: ...

Last Modified: 03/01/2022

3001 SB 35 - Phase I Report.pdf

Subgrade Area(s) None identified Number of Units N/A Additional Improvements Asphalt-paved...recovery whatsoever under any course of action against AEI, its officers,...

Last Modified: 06/26/2023

Attachment 1 - Resolution

The Subrecipient shall verify the status of a contractor or vendor to maintain the

Last Modified: 05/29/2025

Att1 - Resolution

The Subrecipient shall verify the status of a contractor or vendor to maintain the

Last Modified: 06/04/2026

WMR 7.17.26 (1).pdf

Jul - Apr) Remaining Total Cash Authorized Cash Cash Contract Cash Consultant/Vendor

Last Modified: 07/17/2026

20210622_2814_Empire_Ave_City_Response.pdf

◼ Additional impacts to street triggered by this project could extend the paving

Last Modified: 08/27/2021

2021_Planning_ Burbank2035 Draft Environmental Impact Report.pdf

include new development in the planning area, including buildings, structures, paved...► Program AQCC-9: Preference for City Contractors and...

Last Modified: 07/29/2021

Planning_2021_Burbank2035 DEIR.pdf

include new development in the planning area, including buildings, structures, paved...► Program AQCC-9: Preference for City Contractors and...

Last Modified: 12/02/2021

Base Range - As of 12.27.20.pdf

.00 .00 .00 .00 .00 .00 .00 Lifeguard 0821...8 9 10 11 12 13 14 Tree Trimmer ...

Last Modified: 01/19/2021

3201 W Olive Ave Proposed Plans.pdf

IN CASE OF CONFLICT OF INDICATED PAVING OR SLAB SLOPES WITH CIVIL DRAWINGS, THE CIVIL...NOT IN CONTRACT CONCRETE PAVING PERVIOUS...

Last Modified: 07/26/2022

JACKALOPE INDIE ARTISAN FAIR

text-transform: none;widows: 2;word-spacing: 0.0px;">For a full list of participating vendors

Last Modified: 11/20/2023

20260630-FY-26-27-Adopted-Fee-Schedule

Page (3) Subscription Service for Revisions Varies Based on current rate set by vendor...Products Annual (FY)/ Vehicle (21) Rental Equipment Annual (FY) (22) Sidewalk...

Last Modified: 06/29/2026

2021_Planning_Burbank2035 EIR Appendix F, Part 1.pdf

streets include a developed pedestrian network, interconnected by a variety of paved...streets include a developed pedestrian network, interconnected by a variety of...

Last Modified: 07/29/2021

Project No.24-4476 - 3000 Haven Way - HDP - Decision Letter 3.10.26

ALL EXISTING AND NEW DRIVEWAYS, DRIVEWAY CURB CUTS, PAVED FRONT YARD AREAS AND FRONT...walls. the screed shall be placed a minimum of 4 " above the earth or 2" above...

Last Modified: 03/11/2026

3-1-22 - ED - Attachment 1_Redacted

and distribute minutes • Draft correspondence and/or documents to clients and vendors

Last Modified: 02/04/2022

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600046 1305

Last Modified: 02/06/2026

20201216.AdoptedBudget17_18.pdf

Issue all employee and vendor tax statements accurately and within applicable deadlines...Ensure all employee and vendor payments are processed on...

Last Modified: 12/16/2020

20201208-Burbank-Channel-Bikeway-RFP-001.pdf

existing facilities, utility relocation and undergrounding, earthwork - grading, paving

Last Modified: 12/08/2020

20210113-la-river-bridge-rfp-001.pdf

existing facilities, utility relocation and undergrounding, earthwork - grading, paving

Last Modified: 01/13/2021

Attachment 4 – SB 423

to, a bicycle lane, sidewalk or walkway, public transit stop, driveway, street paving

Last Modified: 11/07/2024

Attachment 4 – SB 423.pdf

to, a bicycle lane, sidewalk or walkway, public transit stop, driveway, street paving

Last Modified: 11/18/2024

Attachment 3 – SB 423.pdf

to, a bicycle lane, sidewalk or walkway, public transit stop, driveway, street paving

Last Modified: 01/11/2024

2025 BPAP Plan Check Correction List

flange at stucco siding placed a minimum of 4 inches above earth or 2 inches above paved

Last Modified: 03/26/2026

20220620-FY-22-23-Adopted-Fee-Schedule.pdf

Dedication, Naming or Renaming of a City Facility Based on current rate set by vendor...Based on current rate set by vendor 5 Description...

Last Modified: 06/20/2022

20230309-FY-22-23-Adopted-Fee-Schedule.pdf

Dedication, Naming or Renaming of a City Facility Based on current rate set by vendor...Based on current rate set by vendor 5 Description...

Last Modified: 03/09/2023

COB Grade Step Salary Listing, 8-17-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 08/18/2025

COB Grade Step Salary Listing, 4-27-25

6 7 8 9 10 11 12 13 14 Page 61 of 74 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 70 of 74 Tree Trimmer...

Last Modified: 05/07/2025

COB Grade Step Salary Listing, 5-25-25

40.06 60.09 Senior Lifeguard B.0900 BCEA 0821...6807.97 3142.14 39.28 58.92 Tree Trimmer...

Last Modified: 06/03/2025

COB Grade Step Salary Listing, 6-22-25

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/30/2025

COB Grade Step Salary Listing, 6-22-25.docx - Updated

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 07/11/2025

COB Grade Step Salary Listing, 9-30-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 10/07/2025

COB Grade Step Salary Listing, 9-14-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 09/22/2025

COB Grade Step Salary Listing, 11-25-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 11/26/2025

COB Grade Step Salary Listing, 12-21-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 12/23/2025

COB Grade Step Salary Listing, 3-10-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/11/2026

COB Grade Step Salary Listing, 2-1-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 02/11/2026

COB Grade Step Salary Listing, 3-15-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/26/2026

COB Grade Step Salary Listing, 6-2-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/05/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet