Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Jasa Pemasangan Geotextile Tube Terdekat Berau Kalimantan Timur"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Jasa Pemasangan Geotextile Tube Terdekat Berau Kalimantan Timur.
Search Results

Attachment J - Preliminary Low Impact Development Plan (LID).pdf

The geotextile fabric base seals and hydrophobic petrochemical sponges will be removed...Base Seal - Geotextile or concrete slurry. ...

Last Modified: 05/11/2023

Attachment J - Preliminary Low Impact Development Plan (LID).pdf 1

The geotextile fabric base seals and hydrophobic petrochemical sponges will be removed...Base Seal - Geotextile or concrete slurry. ...

Last Modified: 06/26/2023

Preliminary_LID_Report.pdf

Base Seal - Geotextile or concrete slurry. 13....Geotextile fabric base seals and hydrophobic petrochemical sponges are removed and...Within each...

Last Modified: 01/11/2024

Sample Project 2016.pdf

Protected by rigid metal conduit, intermediate metal conduit, electrical metallic tubing

Last Modified: 03/25/2021

Appendix 11.1E_Phase I II ESA.pdf

The liner is a thin-walled tube that fits inside the bore sample tube and facilitates...No headspace was present in the...

Last Modified: 11/29/2021

20210401_3700RD_Appendix_E.pdf

The liner is a thin-walled tube that fits inside the bore sample tube and facilitates...No headspace was present in the...

Last Modified: 04/12/2021

2025 FEB ISSUED

Contractor 6650 AMIGO AVENUE Issued Date:Permit Number:Permit Type: BS2501768 1305...2025 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2501892 ...

Last Modified: 03/10/2025

420 S Sunset Canyon Rd - Approved Plans

SQUARE AND RECTANGULAR TUBING SHALL BE EQUAL TO ASTM-A-36 UNLESS SPECIFICALLY IDENTIFIED

Last Modified: 08/03/2026

20210101_608_N_Bel_Aire_ProjectPlans.pdf

- TOP OF SLAB TS - TUBE STEEL TRANSV - TRANSVERSE TRANSF - TRANSFER TOT

Last Modified: 04/13/2021

Project Plans - 2925 N Lamer St

SQUARE AND RECTANGULAR TUBING SHALL BE EQUAL TO ASTM-A-36 UNLESS SPECIFICALLY IDENTIFIED...SQUARE AND RECTANGULAR TUBING SHALL BE EQUAL TO...

Last Modified: 02/07/2025

2925 N Lamer St_Plans_c4_1.27.25

SQUARE AND RECTANGULAR TUBING SHALL BE EQUAL TO ASTM-A-36 UNLESS SPECIFICALLY IDENTIFIED...SQUARE AND RECTANGULAR TUBING SHALL BE EQUAL TO...

Last Modified: 03/04/2025

UpperLARiver_Draft_Appendix4a.pdf

GABRIEL CITY C5 34.0841 ‐118.105 San Gabriel 5360012901 0.98 13.19 SAN GABRIEL CITY 1305...A strainer is usually installed at collecting end of the sampler...

Last Modified: 03/25/2021

20210401_3700RD_Appendix_B.pdf

stucco ▪ May support a combination of backlit plastic, incandescent bulbs, neon tubing..., and fluorescent tubing ▪ Usually two-faced for...

Last Modified: 04/12/2021

Consistency Matrix - SB35 NOI - 910 S Mariposa

Requirement Map, which AIRPORT requires FAA Notice for all structures with height at 10-1-1305

Last Modified: 03/19/2024

ERRCS Regulations

Coaxial and fiber optic cables shall be enclosed within electrical metallic tubing

Last Modified: 10/14/2025

Original Application.pdf

Tube Steel PantryPANT SDAS Standard Disabled Access Space E.V.C.S. - VAN Van Accessible

Last Modified: 11/24/2025

2024-01-16_Thornton Planning Package

, CAP TUBE END 4 " 1 '- 8 " 6 " 2 '- 6 " 2'-0" CONCRETE FOOTING, USE TYPE...STEEL TUBE JAMBS AT GATE 6" x 18" x 3/16" STEEL PLATES TO...

Last Modified: 04/18/2024

2024-01-16_Thornton Planning Package23

, CAP TUBE END 4 " 1 '- 8 " 6 " 2 '- 6 " 2'-0" CONCRETE FOOTING, USE TYPE...STEEL TUBE JAMBS AT GATE 6" x 18" x 3/16" STEEL PLATES TO...

Last Modified: 01/13/2025

420 S. Sunset Cny - Project Plans - STAMPED.pdf

OR GREATER TO HAVE 2 LAYERS OF GEOTEXTILE FABRIC INSTALLED 3" BELOW GROWTH.

Last Modified: 11/20/2023

20210519_504_Hampton_Road.pdf

PROVIDE DOUBLE SINKS WITH GARBAGE DISPOSAL, AT REFRIGERATOR SPACE - PROVIDE COPPER TUBE...PROTECTED BY RIGID CONDUIT, INTERMEDIATE CONDUIT, ELECTRICAL METALLIC...

Last Modified: 05/18/2021

Appendix 11.1B_Cultural Report.pdf

stucco ▪ May support a combination of backlit plastic, incandescent bulbs, neon tubing..., and fluorescent tubing ▪ Usually two-faced for...

Last Modified: 11/29/2021

Planning Comments - Final Objective Standard Review

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The

Last Modified: 05/06/2024

Updated_Objective_Standards_Consistency_Matrix.pdf

Yes HOPE AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 10/29/2024

Updated_Objective_Standards_Consistency_Matrix (1).pdf

Yes HOPE AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 10/29/2024

Objective_Standards_Consistency_Matrix

AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 05/14/2024

2nd Submittal SB35 - 910 S Mariposa - Consistency matrix.pdf

requires FAA Notice for all structures with height at limits allowed by code. 10-1-1305

Last Modified: 07/06/2023

Pool Rules and Regulations

Last Modified: 05/20/2026

3252 N Frederic St 1-29-22.pdf

PROTECTED BY RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING

Last Modified: 02/08/2022

3201 Olive - Full Application Cover Letter - 6-27-23 with attachments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project...######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214...

Last Modified: 07/25/2023

123 S Victory - Decision Letter & Attachments - 261109.pdf

Heights Surrounding Bob Hope Airport 10-1-1305: FEDERAL AVIATION ADMINISTRATION...Protected by rigid metal conduit, intermediate metal conduit, electrical metallic...

Last Modified: 11/09/2026

420 S Sunset Canyon Dr_HDP-Decision Letter

SQUARE AND RECTANGULAR TUBING SHALL BE EQUAL TO ASTM-A-36 UNLESS ‘AP (1 GRADING

Last Modified: 08/03/2026

3209 Castleman Ln Approved Plans.pdf

PROTECTED BY RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING

Last Modified: 12/14/2022

1821 N Bel Aire Dr_Planning Approved Plans

PROTECTED BY RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING

Last Modified: 06/02/2026

1821 N Bel Aire Dr_Plans

PROTECTED BY RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING

Last Modified: 05/06/2026

Attachment C - Objective Standards Consistency Matrix.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project site

Last Modified: 05/08/2023

Attachment C - Objective Standards Consistency Matrix.pdf 1

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project site

Last Modified: 06/26/2023

Combined Attachments A-N.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project...######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214...

Last Modified: 05/24/2023

2022 BPAP Plan Check Correction List

Protected by rigid metal conduit, intermediate metal conduit, electrical metallic tubing

Last Modified: 11/15/2024

3006 Mesa Verde - 2nd submittal- Combined Plan Set.pdf

Protected by rigid metal conduit, intermediate metal conduit, electrical metallic tubing

Last Modified: 01/10/2023

20210101_1258_E_Elmwood_ProjectPlans.pdf

TOP OF WALL T.PART TOILET PARTITION TS TUBE STEEL TV TELEVISION TYP TYPICAL UC UNDERCUT

Last Modified: 04/13/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet