Search Results

Showing results for "dWA 0821 1305 0400 Jasa Clay Liner Tegal Jawa Tengah"

No results were found that matched the keywords: dWA 0821 1305 0400 Jasa Clay Liner Tegal Jawa Tengah.
Search Results

Project Applicant's Submitted Consistency Matrix

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The Project

Last Modified: 09/25/2025

Consistency Matrix - SB 35 NOI

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The Project

Last Modified: 09/25/2025

PP 08-2022.pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 08/04/2022

PP 08-2022 (1).pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 08/04/2022

PP 08-2022 (2).pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 08/04/2022

LA County Affordable Housing Resources.pdf

Los Angeles - (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 03/11/2025

09-2025 PROJECT PLACE.pdf

Los Angeles (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 10/06/2025

09-2024 PROJECT PLACE.pdf

Los Angeles - (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 09/13/2024

07-2024 PROJECT PLACE.pdf

Los Angeles - (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 07/24/2024

Appendix C_AQ_Energy_GHG Data.pdf

Construction: Off-Road Equipment Per AQ Questionnaire As a conservative estimate, liner...Construction: Off-Road Equipment Per AQ Questionnaire As a conservative estimate,...

Last Modified: 12/13/2024

ApxC2_PhaseIArchaeologicalResourcesReport.pdf

Fernando Valley consist of up to 2,000 feet (610 m) of Quaternary alluvium (sand, clay

Last Modified: 07/09/2021

SB 35 Letter & Attachments.pdf

Clay roof tile The project includes the following architectural elements: •Strong

Last Modified: 03/04/2022

Base Range - As of 12.27.20.pdf

.00 .00 .00 .00 .00 .00 .00 Lifeguard 0821...8 9 10 11 12 13 14 Tree Trimmer ...

Last Modified: 01/19/2021

Appendix D - Historic Resource Assessment.pdf

) • Stone cladding, glazed clay tiles or mosaics used on façade • Some with lobby...California Department of Water Resources, Pools 20/21 and 17/18...

Last Modified: 01/07/2025

Attachment 1 - Resolution with Exhibits A-F -FINAL..pdf

Clay roof tile Project must comply with these standards As depicted on the elevations...HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305...

Last Modified: 12/26/2023

20210701_921_Riverside_Dr_City_Response_Final.pdf

Clay roof tile ROOF DESIGN AND MASSING. (10-1-628.S) 1....Clay roof tile ROOF DESIGN AND MASSING. (10-1-628.S) 1.

Last Modified: 08/27/2021

20210701_921_Riverside_Dr_City_Response_Final (1).pdf

Clay roof tile ROOF DESIGN AND MASSING. (10-1-628.S) 1....Clay roof tile ROOF DESIGN AND MASSING. (10-1-628.S) 1.

Last Modified: 08/30/2021

20210701_921_Riverside_Dr_City_Response_Final (2).pdf

Clay roof tile ROOF DESIGN AND MASSING. (10-1-628.S) 1....Clay roof tile ROOF DESIGN AND MASSING. (10-1-628.S) 1.

Last Modified: 08/30/2021

20210701_921_Riverside_Dr_City_Response_Final (3).pdf

Clay roof tile ROOF DESIGN AND MASSING. (10-1-628.S) 1....Clay roof tile ROOF DESIGN AND MASSING. (10-1-628.S) 1.

Last Modified: 08/30/2021

Appendix G - Geotechnical Report.pdf

af: Surficial Sediments - Artificial cut and fill Qa: Alluvium: gravel, sand and clay

Last Modified: 01/07/2025

DEIR Appendix G-3 (LaTerra).pdf

1292 1293 1294 1295 1296 1297 1298 1299 1300 1301 1302 1303 1304 1305...1292 1293 1294 1295 1296 1297 1298 1299 1300 1301 1302 1303 1304 ...

Last Modified: 05/04/2021

DEIR Appendix G-1 (LaTerra).pdf

of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean OL...high plasticity, fat...

Last Modified: 05/04/2021

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600046 1305

Last Modified: 02/06/2026

2025 OCT ISSUED

AVE Mechanical $140,000.00Valuation: 9TH FLOOR: MECNAHINCAL TENANT IMPROVEMENT CLAY...Clay Dunn Ent Inc DBA Air-Tec 3105491698 90745CACarson ...

Last Modified: 11/03/2025

COB Grade Step Salary Listing, 4-27-25

6 7 8 9 10 11 12 13 14 Page 61 of 74 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 70 of 74 Tree Trimmer...

Last Modified: 05/07/2025

COB Grade Step Salary Listing, 5-25-25

40.06 60.09 Senior Lifeguard B.0900 BCEA 0821...6807.97 3142.14 39.28 58.92 Tree Trimmer...

Last Modified: 06/03/2025

COB Grade Step Salary Listing, 6-21-26

62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 07/01/2026

COB Grade Step Salary Listing, 6-22-25.docx - Updated

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 07/11/2025

COB Grade Step Salary Listing, 8-17-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 08/18/2025

COB Grade Step Salary Listing, 6-22-25

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/30/2025

COB Grade Step Salary Listing, 9-30-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 10/07/2025

COB Grade Step Salary Listing, 3-15-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/26/2026

COB Grade Step Salary Listing, 9-14-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 09/22/2025

COB Grade Step Salary Listing, 12-21-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 12/23/2025

COB Grade Step Salary Listing, 2-1-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 02/11/2026

COB Grade Step Salary Listing, 11-25-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 11/26/2025

COB Grade Step Salary Listing, 3-10-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/11/2026

COB Grade Step Salary Listing, 6-2-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/05/2026

COB Grade Step Salary Listing, 8-11-26.pdf

41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...7045.76 3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 08/13/2026

COB Grade Step Salary Listing, 8-11-26.pdf

41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...7045.76 3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 08/13/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet