Showing results for "dWA 0821 1305 0400 Jasa Clay Liner Tegal Jawa Tengah"
41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...7045.76 3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...
Last Modified: 08/13/2026
The proposed buildings feature notable architectural elements such as red clay...Clay roof tile C....HEIGHTS SURROUNDING BOB HOPE...
Last Modified: 11/21/2024
The proposed buildings feature notable architectural elements such as red clay...Clay roof tile C....HEIGHTS SURROUNDING BOB ...
Last Modified: 11/19/2024
Pottery students are currently charged $17 per bag of clay and $35 for specialized...clay....depending on the type of clay...
Last Modified: 05/02/2024
Clay roof tile ROOF DESIGN AND MASSING.
Last Modified: 08/27/2021
Beac h Nort hrid ge Van N uys Anaheim Canyon Coro na - Nort h M ain Mont clai
Last Modified: 07/08/2026
Utilization of a subslab liner aids in Executive Summary Draft Environmental...Utilization of a subslab liner aids in venting the sub-slab...
Last Modified: 05/04/2021
Dudleya multicaulis -- -- 1B Chaparral, coastal sage scrub, often on heavy clay...sage scrub, and valley and foothill grassland plant communities, often on heavy...
Last Modified: 07/29/2021
., Clay T., Byers, V., Rosenfeld P.
Last Modified: 11/04/2021
20/2026 MAGNOLIA BLVD Plumbing $2,000.00Valuation: SEWER LINE CHANGEOUT - 20' LINER
Last Modified: 04/03/2026
35 35 35 1262 13 13 66.7 67.7 N San Fernando Blvd & Cohasset St Hard 40 35 35 35 1305
Last Modified: 03/31/2021
result in crumbling and serious cracking beyond re-use due to the brittle nature of clay...This is due to the brittle nature of clay brick...
Last Modified: 11/29/2021
Last Modified: 03/24/2022
Engineering controls include various forms of caps, building foundations, liners...interbedded with finer-grained units of sand, silty sand, sandy silt, silt, and...
ZONE Weightlifting DTLA Wrestling ZONE LA Memorial Coliseum Whittier Narrows Clay
Last Modified: 08/12/2026
Engineering controls include various forms of caps, building foundations, liners,...loam clay loam stratifiedDeeper Soil Types: silty...
The valley fill material is a -9- 1 heterogeneous mixture of clays, silts, sand
2026 LOMITA ST Plumbing $3,800.00Valuation: REMOVE & REPLACE SEWER LATERAL FROM CLAY
Last Modified: 03/03/2026
path for ambient sound Minimum of 7 feet of ducting with 1-inch thick duct liner...Specifications: • Minimum of 7-feet of ducting with 1-inch thick duct...
Ave 1926 Two Units/4 Stories Or Less Or Less 2 6,970 0.16 101 2446‐031‐017 1305...1310 N Kenwood St 1946 Single Family Residence 1 6,098 0.14 121 2476‐001‐013...
Last Modified: 03/24/2021
Soils that are particularly subject to subsidence include those with high silt or clay
Last Modified: 07/09/2021
If trashcan liners are used, they shall be changed daily • Replenish all hand
Last Modified: 08/18/2025
CC 12/27/2017 3,000,000.00 2.440 06/27/2022 3,000,000.00 1643 3,000,000.00 2.440 1305
Last Modified: 03/09/2021
The existing roof covering is slate, clay, cement, asbestos-cement tile, wood shake...Where the existing roof covering is slate, clay, cement,...
Last Modified: 11/24/2025
groundborne vibration shows that vibration propagation is more efficient in stiff clay
THE PROJECT WILL UTILIZE CLASS A FIRE RTATED CLAY ROOFING TILES, NONCOMBUSTIBLE/
Last Modified: 08/18/2026
Between Golden State Freeway and Cohasset Street W.o. 21149 1977 03773 Singer, Clay...Fernando Valley consist of up to 2,000 feet (610 m) of Quaternary alluvium (sand,...
Engineering controls include various forms of caps, building foundations, liners
$126,502,176 $247,083,281 FUND 498 Refuse Collection and Disposal Landfill Slope Liner...Project 1,356,835 150,000 1,506,835 Landfill IID...
Last Modified: 09/11/2025
Communications 25318 Programmable Logic Controller Replacement Program 23427 Landfill IID Liner...Construction 24910 Landfill Organics Cover 24928 Landfill Slide Slope...
Last Modified: 09/10/2026
$29,188,333 $88,057,144 FUND 498 Refuse Collection and Disposal Landfill IID/E Liner...additional $2,886 was added to the Reimbursable Materials account for increased...
Last Modified: 09/11/2023
$23,775,760 $71,047,970 FUND 498 Refuse Collection and Disposal Landfill Slope Liner...Project 1,356,835 1,356,835 Landfill IID...
Last Modified: 09/05/2024
Los Angeles Directory Co. 2147 FREDERIC ST Year Uses Source 1956 HARRIS COY CLAY...Pacific Telephone 1952 Harris C C Ch Los Angeles Directory Co. 1950 HARRIS COY...
Last Modified: 04/03/2025
2,886 2,886 - The Department has experienced a consistent increase in clay...Pottery students are currently charged $14 per bag of...
Last Modified: 05/04/2023
., high-density polyethylene vapor barrier liner) beneath the structure foundation...0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 413 1103 492 561...
Last Modified: 09/10/2021
Last Modified: 09/14/2021
Showing 321 to 360 of 392 entries.