Search Results

Showing results for "dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara"

No results were found that matched the keywords: dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara.
Search Results

Library: Reduce Your Waste This Winter

Use the pail to transport and empty collected food into the City's green organics

Last Modified: 10/14/2023

20200112-2015-Tax-Allocation-Refunding-Bond.pdf

Project 36 THE BURBANK PROJECTS 36 Project Area Map 37 The Component Areas 37...New businesses which opened up...

Last Modified: 01/12/2021

2024-01-16_Thornton Planning Package

AMENDMENTS) ENERGY: 2019 STATE OF CALIFORNIA ENERGY CODE 2019 STATE OF CALIFORNIA GREEN...'GREEN CARPET' DWARF NATAL PLUM 1 GAL. 30"...

Last Modified: 04/18/2024

2024-01-16_Thornton Planning Package23

AMENDMENTS) ENERGY: 2019 STATE OF CALIFORNIA ENERGY CODE 2019 STATE OF CALIFORNIA GREEN...'GREEN CARPET' DWARF NATAL PLUM 1 GAL. 30"...

Last Modified: 01/13/2025

2025 JUN ISSUED

CHARGERS WILFREDO CERVANTES 8059148952 91406CAVAN NUYS Applicant 16517 ARMINITA ST GREEN...OF 18 LEVEL 2 ELECTRIC VEHICLE CHARGERS brian.coloma 91506CABURBANK ...

Last Modified: 07/01/2025

20210107-2010B-Series-Electric-Revenue-Bonds.pdf

, the Magnolia Power Project, Pebble Springs Wind Project, Milford I Wind Project...Magnolia Power...

Last Modified: 01/07/2021

2244 North Buena Vista Street Project

  Click Here to access the Zoom Link: https://burbankca.zoom.us/j/83337787520?pwd=7QiJvA4SIYjXZfXlz8tmgbSgrUUrwm.1  

Last Modified: 02/27/2025

Att2 - Draft Urban Water Management Plan

Population Projections....State Water Project....Drought, Flood) Plant street trees and other vegetation to provide shade and...

Last Modified: 06/04/2026

20210101_2020-2025 Consolidated Plan.pdf

The project has funding from both Section 8 and Section 202....The city does not have public housing projects....Sustainability and...

Last Modified: 05/20/2021

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Size 5 to 9 Units Ownership Projects $11.62 Per Square Foot Rental Projects $5.95...Projects $20.75 Per Square Foot...

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Size 5 to 9 Units Ownership Projects $11.62 Per Square Foot Rental Projects $5.95...Projects $20.75 Per Square Foot...

Last Modified: 03/17/2026

THF Tentative Ruling on the City's Preliminary Injunction .pdf

Green (1974) 41 Cal.App.3d 146, 150.)

Last Modified: 04/05/2021

Accepted Organics

Last Modified: 03/26/2026

Brush Clearance Vendors

See our list of brush clearance vendors are licensed professionals who can help you clear brush, trim trees, and stay in compliance with fire safety rules.

Last Modified: 05/26/2026

of a Resolution of the Ministerial Design Review for a Multifamily Residential Project

Determination and Approval of the Ministerial Design Review for a Multifamily Residential Project

Last Modified: 06/02/2025

Rancho Providencia Neighborhood Protection Plan Community Meeting

More details can be found on the City’s  project page: <a href="https

Last Modified: 10/19/2023

Exhibit D.pdf

TO RECOMMEND TO THE CITY COUNCIL APPROVAL OF PROJECT....substitutes, or ground covers that maintain a living, organic, and continuous sense of a...

Last Modified: 01/27/2022

Tree Master Plan BURBANK 1.pdf

Community trees, both public and private, soften the urban hardscape, providing a green...urbanized environment may lower air temperatures 5° F (3° C) compared to...

Last Modified: 04/18/2024

Tree Master Plan BURBANK 1

Community trees, both public and private, soften the urban hardscape, providing a green...urbanized environment may lower air temperatures 5° F (3° C) compared to...

Last Modified: 04/18/2024

20210405-COB-Title-VI-2019-Triennial-Update-001.pdf

BurbankBus Green Route (formerly known as NoHo / Media District Route)...BurbankBus Green Route - provides weekday peak-hour service from 6:00 am-...

Last Modified: 04/05/2021

20201230-Title-VI-Plan-001.pdf

BurbankBus Green Route (formerly known as NoHo / Media District Route) Attachment...BurbankBus Green Route - provides weekday peak-hour service...

Last Modified: 12/30/2020

7-13-21 BCC - 5. Park, Recreation and Community Services Board_Redacted.pdf

o Maintained reporting and tracking of budgets and expenses related to project....through sustainability, making sure that we don't overtax our town and practicing...

Last Modified: 06/17/2021

20220622-BurbankTransportationStudyGuidelines-001.pdf

The project is a “small project” that generates less than 110 daily trips 2....The project is a residential, retail,...

Last Modified: 06/22/2022

20240709-TransportationStudyGuidelinesUpdate-001.pdf

The project is a “small project” that generates less than 110 daily trips 2....project 4....Significance ...

Last Modified: 07/09/2024

20251126-24-25_DIF_Annual_Report-001.pdf

Project # Project F127-Expenditures to date DIF % 22489 GSSP/HSR Station Area...City of Burbank Project Information...

Last Modified: 11/26/2025

20260422-2025 DIF Report for Website-001.pdf

Project # Project F127-Expenditures to date DIF % 22489 GSSP/HSR Station Area...City of Burbank Project Information...

Last Modified: 04/22/2026

20240624-BurbankTransportationStudyGuidelines-001.pdf

The project is a “small project” that generates less than 110 daily trips 2....project 4....The...

Last Modified: 06/24/2024

20260422-2025 DIF Report for Website-001 (1).pdf

Project # Project F127-Expenditures to date DIF % Approximate Construction Date3...70019_0000 P24823 Project Score N/A ...

Last Modified: 04/22/2026

20241202-DIF Report for Website-001

Most of this project's costs are funded by a Metro Call for Projects grant....This project is a top priority...

Last Modified: 12/02/2024

20260422-2024 DIF Report for Website-001.pdf

PROJECT DESCRIPTION AND JUSTIFICATION This project funds the construction of the...Most of this project's costs are...

Last Modified: 04/22/2026

Memo for FY 2022-2023.pdf

Status Project Score N/A PROJECT DESCRIPTION AND JUSTIFICATION The project will...Status...

Last Modified: 11/20/2023

Memo for FY 2022-2023 (1).pdf

Status Project Score N/A PROJECT DESCRIPTION AND JUSTIFICATION The project will...Status...

Last Modified: 11/20/2023

Memo for FY 2022-2023 (2).pdf

Status Project Score N/A PROJECT DESCRIPTION AND JUSTIFICATION The project will...Status...

Last Modified: 11/20/2023

20210401_3700RD_Appendix_H.pdf

(Project)....Examples of these include project size, project location in a low VMT area, and...

Last Modified: 04/12/2021

Appendix 11.1H_Traffic.pdf

(Project)....Examples of these include project size, project location in a low VMT area, and...

Last Modified: 11/29/2021

3001 Empire - SB 35 Cover Letter - 2023-06-06.pdf

The Project is consistent with this criteria....The Project is consistent with this criteria....is required in the...

Last Modified: 06/26/2023

3000 Empire - SB 35 Cover Letter - Final 6-21.pdf

The Project is consistent with this criteria....The Project is consistent with this criteria....is required in the...

Last Modified: 06/29/2023

20210401_3700RD_Appendix_I.pdf

(project)....(project)....(project).

Last Modified: 04/12/2021

Appendix 11.1I_AB 52.pdf

(project)....(project)....(project).

Last Modified: 11/29/2021

529-537 E Palm Ave - Public Notice - Community Meeting_final.docx

In addition, the project requests a 50% density bonus and the Project Applicant...Call the project planner, David Kim, at...

Last Modified: 02/02/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet