Search Results

Showing results for "dWA 0821 1305 0400 Pesan Waterproofing Geoteknik Wilayah Kulon Progo DI Yogyakarta"

No results were found that matched the keywords: dWA 0821 1305 0400 Pesan Waterproofing Geoteknik Wilayah Kulon Progo DI Yogyakarta.
Search Results

03. BCEA MOU 2026 - 2027 - FOR WEBSITE - FINAL_V2.0 (2).pdf

If an employee with unused sick leave credit A. dies; B. resigns at the age...SECTION J SICK LEAVE TIME BANK In the event that an employee...

Last Modified: 08/04/2026

03. BCEA MOU 2026 - 2027 - FOR WEBSITE - FINAL_V2.0.pdf

If an employee with unused sick leave credit A. dies; B. resigns at the age...SECTION J SICK LEAVE TIME BANK In the event that an employee...

Last Modified: 08/04/2026

03. BCEA MOU 2026 - 2027 - FOR WEBSITE - FINAL_V2.0 (3).pdf

If an employee with unused sick leave credit A. dies; B. resigns at the age...SECTION J SICK LEAVE TIME BANK In the event that an employee...

Last Modified: 08/04/2026

2025 JUN ISSUED

Multi-Family Repair and Maintenance $4,500.00Valuation: REMOVE AND REPLACE THE (E) WATERPROOFING...Multi-Family Repair and Maintenance $3,000.00Valuation: REMOVE &...

Last Modified: 07/01/2025

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600046 1305

Last Modified: 02/06/2026

OIR GROUP - 2025 REVIEW OF BURBANK PD

but cited the new pressures to quickly release eligible arrestees after a man died

Last Modified: 12/16/2025

2026.07.02 Def COB's Compendium of Exhibits ISO of Opposition to Petitioner's Motion for Prelim. Injunction

Construction Contract for Bid Schedule No. 1522 – Downtown Metrolink Station Waterproofing...a Construction Contract for Bid Schedule No. 1522 – Downtown Metrolink...

Last Modified: 07/17/2026

20211202-FY-2021-22-ADOPTED-CIP.pdf

A consultant has started the design of a new waterproofing system for the outside...After the design is complete, the construction of the...

Last Modified: 12/02/2021

COB Grade Step Salary Listing, 8-17-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 08/18/2025

COB Grade Step Salary Listing, 4-27-25

6 7 8 9 10 11 12 13 14 Page 61 of 74 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 70 of 74 Tree Trimmer...

Last Modified: 05/07/2025

COB Grade Step Salary Listing, 5-25-25

40.06 60.09 Senior Lifeguard B.0900 BCEA 0821...6807.97 3142.14 39.28 58.92 Tree Trimmer...

Last Modified: 06/03/2025

COB Grade Step Salary Listing, 6-22-25

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/30/2025

COB Grade Step Salary Listing, 6-22-25.docx - Updated

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 07/11/2025

COB Grade Step Salary Listing, 9-30-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 10/07/2025

COB Grade Step Salary Listing, 9-14-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 09/22/2025

COB Grade Step Salary Listing, 11-25-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 11/26/2025

COB Grade Step Salary Listing, 12-21-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 12/23/2025

COB Grade Step Salary Listing, 3-10-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/11/2026

COB Grade Step Salary Listing, 2-1-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 02/11/2026

COB Grade Step Salary Listing, 3-15-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/26/2026

COB Grade Step Salary Listing, 6-2-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/05/2026

COB Grade Step Salary Listing, 6-21-26

62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 07/01/2026

COB Grade Step Salary Listing, 8-11-26.pdf

41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...7045.76 3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 08/13/2026

COB Grade Step Salary Listing, 8-11-26.pdf

41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...7045.76 3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 08/13/2026

COB Grade Step Salary Listing 8-11-26

41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...7045.76 3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 08/13/2026

4. Community Development Goals Committee_Redacted.pdf

Application for Standing - Seam Metal Roofs, by Sika Corporation - United States Di

Last Modified: 06/16/2022

20210301_AppendixINoiseTechReport_Avion.pdf

35 35 35 1262 13 13 66.7 67.7 N San Fernando Blvd & Cohasset St Hard 40 35 35 35 1305

Last Modified: 03/31/2021

Attachment 7 - Burbank_DraftNexusReport_4.29.22 Draft Updated_v2.pdf

DI F L ega l Co nt ext This Report is designed to provide the necessary technical

Last Modified: 05/26/2022

20260422-DIFA7-001

DI F L ega l Co nt ext This Report is designed to provide the necessary technical

Last Modified: 04/23/2026

PROPOSED BUDGET FY 26-27

and lighting systems, Heating, Ventilating, and Air Conditiong (HVAC), roofs and waterproofing...$100,000 Consulting Services for Police/Fire Headquarters and Fire 11...

Last Modified: 05/01/2026

2021_Planning_630_S_Parish_Pl_Approved Plans.pdf

WH Water Heater WI Wrought Iron WIC Woodwork Institute of California WP Waterproof

Last Modified: 06/28/2021

20210507_630_Parish Pl_Plans.pdf

WH Water Heater WI Wrought Iron WIC Woodwork Institute of California WP Waterproof

Last Modified: 05/07/2021

20210519_504_Hampton_Road.pdf

ON THIS SHEET # ATTIC AREA OVER 4'-0" EXISTING WALL TO BE DEMO N FLOOR PLAN WATERPROOF

Last Modified: 05/18/2021

UpperLARiver_Draft_Appendix4a.pdf

GABRIEL CITY C5 34.0841 ‐118.105 San Gabriel 5360012901 0.98 13.19 SAN GABRIEL CITY 1305...$10,000 6 Connection to Existing Wet-Well 1 LS $350.00 $350 7 Force Main 6”...

Last Modified: 03/25/2021

Attachment 5 - Project Plans.pdf

VERIFY IN FIELD VINYL TILE WITH WOOD WATER HEATER WOLCOTT ARCHITECTURE WITHOUT WATERPROOF...L O T DI M EN SI O N 488'-2"ALAMEDA AVE.

Last Modified: 02/12/2024

Attachment 4 Project Plans and Subdivision Map...pdf

& ESPALIERS Bougainvillea 'Monka' Bougainvillea Pandorea jasminoides 'Lady Di

Last Modified: 10/20/2022

Updated_Project_Plans.pdf

& ESPALIERS Bougainvillea 'Monka' Bougainvillea Pandorea jasminoides 'Lady Di

Last Modified: 10/29/2024

Attachment 5 – Ordinance No. 3461 approving PD 96-1 Zoning and Development Agreement.pdf

program and to instead pay the Transportation Improvement Fee (the "Fee 11 ) , per Di

Last Modified: 01/18/2024

Attachment 6 - City Comments

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/19/2024

Attachment 6 - City Comments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/21/2024

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet