Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Ahli Interior Kamar 3x3 Apartemen Aston Bogor"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Ahli Interior Kamar 3x3 Apartemen Aston Bogor.
Search Results

1. Landlord-Tenant Commission_Redacted.pdf

and Leisure Activities Interests: Political Science, International Relations, Interior

Last Modified: 06/16/2022

1. Landlord-Tenant Commission_Redacted (1).pdf

and Leisure Activities Interests: Political Science, International Relations, Interior

Last Modified: 06/16/2022

Attachment 1 - Ordinance (3).pdf

Barriers may be placed within the interior of the building, so long as the barriers

Last Modified: 05/09/2024

Draft Ordinance.pdf

Barriers may be placed within the interior of the building, so long as the barriers

Last Modified: 05/10/2024

Department Home

Last Modified: 07/22/2026

777 N. Front St. - Final EIR.pdf

Residential courtyards and balconies would be located within the interior sides...Exterior and interior noise exposure levels at the Project site...

Last Modified: 03/31/2021

20210507_630_Parish Pl_Plans.pdf

Identification Sheet Reference Building Section: Section Identification Sheet Reference Interior.../4"W sheet steel with 5.875" grid modules; Provide fine mesh...

Last Modified: 05/07/2021

2021_Planning_630_S_Parish_Pl_Approved Plans.pdf

Identification Sheet Reference Building Section: Section Identification Sheet Reference Interior.../4"W sheet steel with 5.875" grid modules; Provide fine mesh...

Last Modified: 06/28/2021

Plans formal submittal #2_Part3

LOCATIONS SHOWN ON THE INTERIOR AND MECHANICAL DRAWINGS TAKE PRECEDENCE...BREAKERS SHALL BE RATED AS INDICATED ON PLANS, NEMA 1 ENCLOSURE FOR ...

Last Modified: 11/14/2024

Plans formal submittal #2_Part3 (1).pdf

LOCATIONS SHOWN ON THE INTERIOR AND MECHANICAL DRAWINGS TAKE PRECEDENCE...BREAKERS SHALL BE RATED AS INDICATED ON PLANS, NEMA 1 ENCLOSURE FOR ...

Last Modified: 11/14/2024

Attachment 2 - 2311 N. Hollywood Way - Entitlements Resolution (DRAFT) V4 (FR and JHM Comments Incorporated).pdf

The interior commercial ceiling height as proposed on the ground floors of the...provided with a ventilation system in accordance with the California Building Code...

Last Modified: 11/04/2021

Attachment 2 - 2311 N. Hollywood Way - Entitlements Resolution (DRAFT) V4.pdf

The interior commercial ceiling height as proposed on the ground floors of the...provided with a ventilation system in accordance with the California Building Code...

Last Modified: 11/04/2021

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $156.90 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $156.90 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $156.90 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final.pdf

to 30 LF (ii) Additional partition, up to 30 LF $15.85 Each (b) Residential, Interior...to 30 LF (ii) Additional partition, up to 30 LF $15.85 Each (b) Residential,...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $156.90 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/20/2022

FY 2024-24 Adopted Fee Schedule revised

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...of Occupancy/Condo Conversion $83.05 Each Unit (5) Close Existing Openings (a)...

Last Modified: 12/12/2024

PROPOSED FY 2025-26 FEE SCHEDULE

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 05/01/2025

2023092023-FY-23-24-Fee-Schedule-Final.pdf

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 09/20/2023

Adopted FY 2025-26 FEE SCHEDULE - Final

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 08/07/2025

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 12/12/2025

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...of Occupancy/Condo Conversion $83.05 Each Unit (5) Close Existing Openings (a)...

Last Modified: 09/04/2025

FY 2025-26 ADOPTED FEE SCHEDULE FINAL

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 09/05/2025

20250625 (3).fy25_26feescheduleadopted.pdf

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 12/18/2025

Revised FY 2025-26 Adopted Fee Schedule FINAL

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 09/17/2025

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 03/18/2026

20230630-FY-23-24-Fee-Schedule-Final.pdf

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 07/10/2023

20230710-FY-23-24-Fee-Schedule-Final.pdf

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 07/10/2023

FY 2024-25 Adopted Fee Schedule

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...of Occupancy/Condo Conversion $83.05 Each Unit (5) Close Existing Openings (a)...

Last Modified: 06/27/2024

20231005-FY-23-24-Fee-Schedule_Final.pdf

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 10/05/2023

20230731-FY-23-24-Fee-Schedule-Final

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 07/31/2023

20230901-FY-23-24-Fee-Schedule_Final

$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $196.00 Each Unit (14) Partition (a) Commercial,...

Last Modified: 09/01/2023

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $156.90 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/20/2022

Att3 - CDBG Applications

These funds will support renovation activities including, but not limited to, interior...renovation activities, including safety upgrades, accessibility improvements, and...

Last Modified: 06/04/2026

202101_504 Hampton Rd_Decision Letter_Final_.pdf

more than two stories in height; d.Non-structural or non-seismic storefronts, interior

Last Modified: 06/02/2021

Business

Last Modified: 07/14/2026

20260422-2024 DIF Report for Website-001.pdf

improvements, Olive Recreation Center, Burbank Little Theater renovations, and minor interior

Last Modified: 04/22/2026

Planning_2021_Burbank2035 DEIR.pdf

The City has established interior and exterior noise standards....These standards also establish maximum interior noise levels for new...

Last Modified: 12/02/2021

2021_Planning_ Burbank2035 Draft Environmental Impact Report.pdf

The City has established interior and exterior noise standards....These standards also establish maximum interior noise levels for new ...

Last Modified: 07/29/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet