Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Ahli Interior Kamar 3x3 Apartemen Aston Bogor"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Ahli Interior Kamar 3x3 Apartemen Aston Bogor.
Search Results

2025 ADMIN PLAN - REDLINE 03.10.25 (1).pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 03/11/2025

Attachment 3 – Proposed 2025 Amended Administrative Plan (Redline)

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 03/27/2025

AMENDED BHA ADMIN PLAN 2025.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 04/10/2025

Att2 - Proposed 2026 Amended Administrative Plan

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 03/26/2026

AMENDED BHA ADMIN PLAN 2026.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 04/09/2026

BHA Administrative Plan Draft- 2026.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 02/10/2026

FY 2021-22 Proposed Budget.pdf

requested to support the purchase of a specially designed vehicle with a modified interior...2 Openings Exterior Doors, Apparatus Doors, Windows and Gates $ 150,000 3...

Last Modified: 04/22/2021

FY 2021-22 Proposed Budget.pdf

requested to support the purchase of a specially designed vehicle with a modified interior...2 Openings Exterior Doors, Apparatus Doors, Windows and Gates $ 150,000 3...

Last Modified: 04/22/2021

Appendix A - Air Quality Technical Report.pdf

Area (sf) Interior (sf) Exterior (sf) Residential Apartments Mid-Rise 60,904 123,330.60...Architectural Coatings Phase Name Residential Interior...

Last Modified: 01/07/2025

Attachment 1 - BHA Resolution (1).pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 03/28/2024

DRAFT REVISED PHA ADMIN PLAN - HOTMA.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 06/23/2026

DRAFT REVISED PHA ADMIN PLAN - HOTMA.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 06/25/2026

Att2 - Proposed 2026 Amended Administrative Plan (Redline)

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 08/13/2026

ApxG1_Phase I ESA - Part 1.pdf

Two pad- mounted transformers, and three dry interior transformers were observed...Additionally, no other potential PCB-containing equipment...

Last Modified: 07/09/2021

20230701_Burbank_Zero-Emission_Bus_Rollout_Plan.pdf

GreenPower – EV Star+ A cutaway bus with a broader body to utilize the interior

Last Modified: 09/27/2023

FY 2025-26 Proposed Budget

370.PR21A.70003.0000.25126 Expenditure Plan Project Description Renovate the interior...370.PR21A.70003.0000.25127 Expenditure Plan Project Description Renovate the...

Last Modified: 05/01/2025

20220421-FY-2022-23-Proposed-Annual-Budget-Final.pdf

FC 2 Openings $ 150,000 $ 150,000 $ 150,000 450,000 Bldg FC 3 Interior...building components, all aspects of facility-related infrastructure such as the...

Last Modified: 04/21/2022

20240502-FY-2024-25-Proposed-Budget-COMPLETE

new building components, all aspects of facility-related infrastructure such as; Interior...As the City’s first “green” building with LEED Gold certification, the...

Last Modified: 05/02/2024

20230504-FY-2023-24-Proposed-Budget-Final.pdf

new building components, all aspects of facility-related infrastructure such as interior...includes repairing and replacing cabinets, counters, appliances, lighting,...

Last Modified: 05/04/2023

20210107-2010B-Series-BWP-Water-Revenue-Bonds.pdf

, MWD has a permanent service contract with the United States Secretary of the Interior...In January 2001, the Secretary of the Interior adopted...

Last Modified: 01/07/2021

Attachment 1 - Combined

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 03/27/2025

Att1 - Resolution (1)

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 08/13/2026

20201230-Title-VI-Plan-001.pdf

roundtables o Participation in community events o Press releases o Open houses o Interior

Last Modified: 12/30/2020

20210405-COB-Title-VI-2019-Triennial-Update-001.pdf

roundtables o Participation in community events o Press releases o Open houses o Interior

Last Modified: 04/05/2021

Appendix F_HazMat Studies_Part 2.pdf

also improved with a convention center, two restaurants, two swimming pools, and interior

Last Modified: 12/13/2024

Tree Master Plan BURBANK 1

Wind speed reduction reduces the movement of outside air into interior spaces and

Last Modified: 04/18/2024

Tree Master Plan BURBANK 1.pdf

Wind speed reduction reduces the movement of outside air into interior spaces and

Last Modified: 04/18/2024

FY 2025-26 Adopted Budget_Complete

Recycled Water Hydrants 10,000 10,000 10,000 10,000 10,000 10,000 60,000 120,000 Interior...13,403 14,341 15,344 16,418 17,567 18,796 143,851 239,720 Recycled...

Last Modified: 09/11/2025

2500 North Hollywood Way Final EIR.pdf

The monitor(s) shall meet the Secretary of the Interior’s Professional Qualification

Last Modified: 10/01/2026

PROPOSED BUDGET FY 26-27

building components, all aspects of facility-related infrastructure, such as; interior...existing indoor wall, modification to the current door, updated flooring, and ...

Last Modified: 05/01/2026

ApxA1_AQandGHGTechnicalReport.pdf

Additionally, the Project would plant approximately 230 interior and canopy trees...The Project would plant approximately 230 interior and canopy...

Last Modified: 07/09/2021

7-13-21 BCC - 6. Burbank Cultural Arts Commission_Redacted.pdf

91506 Phone: E-Mail: Employing Department of Defense and Department of the Interior

Last Modified: 06/17/2021

FINAL-Burbank.CA.2801 Thornton Ave. Phase I

Interior construction consists of painted drywall walls and ceilings and tile and...Paint sampling was limited to major paint colors on interior...

Last Modified: 04/03/2025

Phase I

No PCB-containing equipment (interior/exterior transformers, oil-filled switches,...WEECO observed a limited amount of interior areas of the...

Last Modified: 09/25/2025

DEIR Appendix G-3 (LaTerra).pdf

2598 2599 2600 2601 2602 2603 2604 2605 2606 2607 2608 2609 2610 2611...sta ar (bias correected MLE) 4410 nu u hat (MLE) 2688 nu star (bias s corrected)...

Last Modified: 05/04/2021

3700 Riverside Final EIR.pdf

The Archaeological Monitor(s) shall meet the Secretary of the Interior’s Professional...qualified architectural historian or historian who meets the Secretary of the...

Last Modified: 03/18/2022

3700 RIverside - Final EIR Attachment 13.pdf

The Archaeological Monitor(s) shall meet the Secretary of the Interior’s Professional...qualified architectural historian or historian who meets the Secretary of the...

Last Modified: 03/24/2022

20210301_AppendixHHydrologyandWater_Avion.pdf

landscape architect - Leaving a vegetative barrier along the property boundary and interior

Last Modified: 03/31/2021

7-13-21 BCC - 3. Police Commission_Redacted.pdf

91506 Phone: E-Mail: Employing Department of Defense and Department of the Interior

Last Modified: 06/17/2021

20230911-FY-2023-24-Adopted-Budget-Complete.pdf

Hydrant Replacement 80,000 85,500 85,500 87,479 89,484 91,537 490,290 1,009,791 Interior...Replacement 15,000 10,000 10,300 10,558 10,769 10,985 58,307 125,919 Recycled...

Last Modified: 09/11/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet