Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Jasa Design Kitchen Set Aluminum Bandar Kemayoran Jakarta Pusat"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Jasa Design Kitchen Set Aluminum Bandar Kemayoran Jakarta Pusat.
Search Results

2025 CALGreen Nonresidential Mandatory Measures

faucets shall have a maximum flow rate of 0.5 gpm at 60 psi 5.303.3.4.1 Mandatory Kitchen...Owner representative's Project Requirements (OPR) [N] 5.410.2.1 Mandatory Basis...

Last Modified: 02/09/2026

2025 CALGreen Residential Mandatory Measures

in common & public use areas 0.5 gpm @ 60 psi Metering faucets 0.2 gallons/cycle Kitchen...BUILDING STANDARDS CODE (CALGREEN) – INCORPORATE THESE MANDATORY ITEMS IN THE...

Last Modified: 02/09/2026

2025 CALGreen Nonresidential Mandatory Measures

faucets shall have a maximum flow rate of 0.5 gpm at 60 psi 5.303.3.4.1 Mandatory Kitchen...Owner representative's Project Requirements (OPR) [N] 5.410.2.1 Mandatory Basis...

Last Modified: 02/09/2026

2025 CALGreen Residential Mandatory Measures

in common & public use areas 0.5 gpm @ 60 psi Metering faucets 0.2 gallons/cycle Kitchen...BUILDING STANDARDS CODE (CALGREEN) – INCORPORATE THESE MANDATORY ITEMS IN THE...

Last Modified: 02/09/2026

Burbank Public Library Unveils Exclusive Nickelodeon Library Card Designs for National

Burbank Public Library Unveils Exclusive Nickelodeon Library Card Designs...This September, Burbank Public Library is introducing three exclusive library card...

Last Modified: 08/28/2026

Ordinance_No._25-4024_.pdf

This requirement is intended to allow design flexibility, while at the same time...BUILDING DESIGN....Various other...

Last Modified: 05/21/2025

Ordinance_No._25-4024_ (1).pdf

This requirement is intended to allow design flexibility, while at the same time...BUILDING DESIGN....Various other...

Last Modified: 05/21/2025

4/5/22 - PH(2) - Attachment 1

All development standards applicable to these zones as set forth in the Burbank...All the findings set forth above are true and correct and are...

Last Modified: 03/24/2022

20230504-FY-2023-24-Proposed-Budget-Final.pdf

The kitchen's rotting particle board emits a foul odor on a consistent basis....of structure, project management, and installation of a shade structure over...

Last Modified: 05/04/2023

Att4 - LAFCO Application

GEOGRAPHIC DESCRIPTION Use EXHIBIT “A” and LAFCO Designation number as the title...MAP Use Exhibit “B” and the LAFCO designation number as the...

Last Modified: 04/09/2026

Where it Goes (English)

METAL Emptied and rinsed aluminum, tin or steel items (Rinsed foil products and...METAL Emptied and rinsed aluminum, tin or steel items (Rinsed...

Last Modified: 04/14/2026

East Olive Reconfiguration Restriping Project Scheduled for March 17–20, 2025

The City of Burbank is set to begin the East Olive Reconfiguration Restriping...Project, a roadway improvement effort designed to...

Last Modified: 03/11/2025

2021_Planning_816 N Avon St Decision Letter (Signed).pdf

The project complies with applicable standards set forth in the Burbank Municipal...The second-story addition is set back an additional 11’-0” from...

Last Modified: 07/20/2021

Attachment 1 - Draft SB 9 Urgency Ordinance Extension FINAL.pdf

The adopted interim ordinance took effect immediately and was set to expire 45 days...All development standards applicable to these zones as set...

Last Modified: 03/02/2023

Sewage Generation Rates.pdf

PUBLIC WORKS SEWAGE GENERATION RATES Sewage design flows are based on user/occupancy...Please refer to the Design Criteria for Sewer Facilities...

Last Modified: 04/13/2021

Attachment 1 - Proposed Ordinance CCO edits

This requirement is intended to allow design flexibility, while at the same time...BUILDING DESIGN....Various other...

Last Modified: 02/13/2025

20201210.FY20_21FeeScheduleADOPTED.pdf

Set $1.00 Set (6) (a) 11" x 17" Copies $0.75 Page (+.10 each additional copy)...Without Kitchen $65.00 1-3 Hours With ...

Last Modified: 06/20/2022

20201210.FY19_20FeeScheduleADOPTED.pdf

Set $1.00 Set (6) (a) 11" x 17" Copies $0.75 Page (+.10 each additional copy)...Without Kitchen $65.00 1-3 Hours With ...

Last Modified: 06/20/2022

2025 Grading Shoring Correction List

Sets must be deemed complete....• See the marked-up set of plans for additional corrections....Design and detail...

Last Modified: 05/28/2026

ATTACHMENT 14_reduced size.pdf

Any unit not developed with individual kitchens and bathrooms must have access to...common areas containing kitchen and bathroom...

Last Modified: 09/16/2022

2021_Planning_706 East Verdugo Ave - Plans.pdf

'-0") 7 8 9 8 8 PROPERTY LINE N 48° 47'32" W 149.85' AutoCAD SHX Text BID SET...THE DESIGNS AutoCAD SHX Text Burbank, CA 91502 AutoCAD SHX...

Last Modified: 09/07/2021

2021 N Parish Place - Decision Letter (final)

Refer to Attachment A for the approved set of plans....the building on each elevation, as measured from the portion of the elevation ...

Last Modified: 09/15/2025

20210101_Five Year (2020-2025) Analysis of Impediments to Fair Housing Choice.pdf

Any unit not developed with individual kitchens and bathrooms must have access to...common areas containing kitchen and bathroom...

Last Modified: 05/20/2021

All-Language-Cart-Stickers

whereitgoes.burbankca.gov NO PLASTIC BAG & WRAP FOAM TANGLERSBATTERIES METAL Cans, aluminum

Last Modified: 04/14/2026

3307 CASTLEMAN LN - Project Plans.pdf

' R = 425.00' Δ = 10°49'19" L = 80.27' CASTLEMAN LANE 2 8 ' LOT 10 SET...SET REBAR & CAP, "L.S. 8571" 2.00' O/S N'LY FROM PROP....

Last Modified: 07/14/2023

20220620-FY-22-23-Adopted-Fee-Schedule.pdf

Set $1.00 Set (6) (a) 11" x 17" Copies $0.75 Page (+.10 each additional copy)...Without Kitchen $65.00 1-3 Hours With ...

Last Modified: 06/20/2022

20230309-FY-22-23-Adopted-Fee-Schedule.pdf

Set $1.00 Set (6) (a) 11" x 17" Copies $0.75 Page (+.10 each additional copy)...Without Kitchen $65.00 1-3 Hours With ...

Last Modified: 03/09/2023

20210101_Planning_Historic_Application_Instructions.pdf

Step Four: The City Council, upon receipt of the recommendation, will set the matter...shall adopt a resolution stating its recommendation, focusing on the criteria...

Last Modified: 03/29/2021

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Without Kitchen $69.00 1-3 Hours With Kitchen $16.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident $81.00...

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Without Kitchen $69.00 1-3 Hours With Kitchen $16.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident $81.00...

Last Modified: 03/17/2026

HDP SUPPLEMENTAL APP 04.12.2022 FINAL.pdf

specific types of remodels and additions to single family homes on properties in the designated...review the proposed project for code compliance and neighborhood...

Last Modified: 04/13/2022

20210101_Historic_Application.pdf

Step Four: The City Council, upon receipt of the recommendation, will set the matter...shall adopt a resolution stating its recommendation, focusing on the criteria...

Last Modified: 04/12/2021

_Burbank_2500 N Hollywood Way EIR_Public Review Draft.pdf

Materials include cement board siding, aluminum composite panels in varied shades..., setting, materials, workmanship, feeling, and...

Last Modified: 12/13/2024

2025 MAY ISSUED

OF MECHANICAL AND PLUMBING DESIGNS FOR MODULES A & B....LA Builders & Design Group 8186327261 91411CAVan Nuys Contractor 15500 Erwin St...VENT...

Last Modified: 07/07/2025

2022 Grading Shoring Correction List

. • Sets must be complete..... • See the marked-up set of plans for additional corrections....Design and detail required...

Last Modified: 02/09/2026

20210101_1258_E_Elmwood_Decision.pdf

The house has been reviewed against the Neighborhood Compatibility provisions as set...where, each of the conditions have been addressed in the building permit plan...

Last Modified: 04/13/2021

Construction Set to Begin on Magnolia Boulevard Water Main Upgrade in January 2026

Starting in January 2026, Burbank Water and Power (BWP) will begin to replace the aging water pipeline along Magnolia Boulevard between Catalina Street and Varney Street. Burbank, CA...

Last Modified: 12/04/2025

Cover_Letter_from_Rand_Paster_Nelson_LLP (1).pdf

location, as depicted on page 7 and 10 of the revised architectural plans set and...are restated below with clarifications and updates to correspond to the revised...

Last Modified: 10/29/2024

Cover_Letter_from_Rand_Paster_Nelson_LLP (2).pdf

location, as depicted on page 7 and 10 of the revised architectural plans set and...are restated below with clarifications and updates to correspond to the revised...

Last Modified: 10/29/2024

SB 35.pdf

pursuant to this subdivision if the development is consistent with the standards set...For purposes of this clause, “project labor agreement” has the same meaning as...

Last Modified: 04/18/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet