Showing results for "dWA 0852 2611 9277 [[GLORION]] Pemborong Pembuatan Kitchen Set Granit Abu Abu Custom Bogor"
To safeguard the health of our employees, customers, and visitors and the Burbank
Last Modified: 01/10/2022
PAVECO will perform the work, and customers will see “no parking” signs posted as
Last Modified: 06/18/2024
GENERAL NOTES: PROGRESS SET EASEMENTS 2 3 4 5 EXISTING TRAFFIC SIGNAL CABINET...LIVINGBEDROOM BATH KITCHEN 2 8 '- 0 " 8'-6" 9'-6" ...
Last Modified: 01/07/2022
. • Sets must be complete..... • See the marked-up set of plans for additional corrections....Applicant will be required to print out 1...
Last Modified: 02/09/2026
where, each of the conditions have been addressed in the building permit plan set...Exterior materials and designs shown on the approved set of...
Last Modified: 02/15/2024
states that all structures within the Commercial Recreation (CR) zone shall be set...50052.5 of the Health and Safety Code, or for rents for the targeted units to be...
Last Modified: 03/04/2022
6,811,455 1 Funded by Art in Public Places Funds 2 Funded by Performing Arts set-aside...3 Use of RDA Loan Repayment Set-aside...
Last Modified: 05/22/2025
Municipal Code criteria for the installation of a Permit-Only zone, the matter is set...may appeal such decision to the Permit Appeals Panel pursuant to the procedure...
Last Modified: 10/25/2024
make all checks payable to “City of Burbank” Project Plans – electronic set...officers, employees, agencies, boards, commissions, or City Council to attack,...
Last Modified: 11/12/2024
Last Modified: 07/26/2021
FIXTURES INCLUDE WATER CLOSETS, URINALS, SHOWERHEADS, LAVATORY FAUCETS, AND KITCHEN...KITCHEN FAUCET 1.8 GPM @ 60 PSI D....SLAB ON GRADE (N)...
Last Modified: 08/22/2025
pursuant to this subdivision if the development is consistent with the standards set...For purposes of this clause, “project labor agreement” has the same meaning as...
Last Modified: 04/18/2023
Last Modified: 05/04/2023
Regulatory Setting 2311 N....Regulatory Setting 2311 N....Regulatory Setting 2311 N.
Last Modified: 07/09/2021
Responsible Agency and South Coast AQMD Permits CEQA Guidelines Section 15096 sets...designed to be used once and discarded) foodware items and accessories; • Allowing...
Last Modified: 12/13/2024
Respondent Burbank has filed a demurrer to all five causes of action which is set...Section 11.1 of the Agreement contains a set of defined terms,...
Last Modified: 07/17/2026
Last Modified: 07/20/2026
California Enterprise Development Authority” (the “Authority”) for the purposes set...the holding of meetings shall be fixed by resolution of the Board which shall...
Last Modified: 11/03/2022
High-Turnover (Sit-Down) Restaurant 1,800 SF Lycee International de Los Angeles (LILA) [d] Custom...15.4 14.0 110.6 15.4 Change Period (Y+Rc), s 4.9 6.5 6.0 4.9 6.5 6.0...
Last Modified: 11/05/2026
The house has been reviewed against the Neighborhood Compatibility provisions as set...where, each of the conditions have been addressed in the building permit plan...
Last Modified: 04/14/2022
where, each of the conditions have been addressed in the building permit plan set...A permanent monument shall be reset, or a witness monument or monuments...
Last Modified: 11/04/2022
The use applied for at the location set forth in the application is properly one...what would be expected from a child daycare facility in a commercial corridor...
Last Modified: 04/13/2021
NOW, THEREFORE, in consideration of the promises, covenants, and provisions set...unless said term is otherwise terminated, modified, or extended by circumstances...
Last Modified: 01/18/2024
cut sheets each contain a narrative summary description of each sign type, and customized...It is not attached to a building, but typically stands in front of one that is...
Last Modified: 03/25/2021
and that all documents, photographs, and plans conform to City requirements as set...DOCUMENTS: One standard sized and one reduced hard-copy of each...
Last Modified: 05/18/2022
The 3’–0” high vinyl fence in the front yard is set back 6’–0” linear feet from the...reproduced on the construction document drawings as part of the Approved Construction...
Last Modified: 01/13/2025
Proposed decomposed granite equestrian trail....BWP SECTION CUSTOMER SECTION PS - PULL SECTION 208/120V-3Ø,4W AIC=65K DFLA=...SHX Text...
Last Modified: 10/29/2024
Office began advertising and accepting applications for the upcoming vacancies set...expiration of this 3 initial appointment, all future vacancies will be...
Last Modified: 06/17/2021
Office began advertising and accepting applications for the upcoming vacancies set...After the expiration of this initial appointment, all future vacancies will be...
Last Modified: 06/16/2022
agreements with subrecipients for all approved HOME-ARP programs and projects set...That all projects and programs set forth in the Allocation...
Last Modified: 03/16/2023
B O U R N A V C A M B R ID G E D R E V E R D U G O A V S SU N SET...B O U R N A V C A M B R ID G E D R E V E R D U G O A V S SU N ...
Last Modified: 08/11/2022
aside for very low-income units and 15% of the total number of units are set aside...and include 15% of all proposed dwelling units are set aside...
Last Modified: 11/21/2024
Last Modified: 11/19/2024
220304 HR_Architectural Progress Set G0.1 G.02 A1.0 A1.1 A1.2 A2.1 A2.2 A2.3
Last Modified: 11/17/2022
RELOCATION OF AN INTERIOR, NONLOAD BEARING WALL, AND REARANGEMENT OF THE KITCHEN...REMODEL (E) KITCHEN & BATHROOM (300 SF), NEW WINDOWS & DOORS,...
Last Modified: 03/03/2026
Showing 1,161 to 1,200 of 2,792 entries.