Search Results

Showing results for "dWA 0859 3970 0884 [[HATIGA]] Biaya Pembuatan GreenHouse 8 x 12 Daerah Jatinom Klaten"

No results were found that matched the keywords: dWA 0859 3970 0884 [[HATIGA]] Biaya Pembuatan GreenHouse 8 x 12 Daerah Jatinom Klaten.
Search Results

20210401_3700RD_Appendix_H.pdf

) (12) (24) (27) (27) (54) TOTAL EXISTING TRIPS (360) (12) (12) (24) (27) (27) (54...- 1.75, where T = trips,...

Last Modified: 04/12/2021

Attachment 8 – Senate Bill No. 684 (1).pdf

bill_id=202320240SB684 1/8 SHARE THIS: Date Published: 10/12/2023 09:00 PM SB-684...(12) Any parcels proposed to be...

Last Modified: 02/01/2024

Attachment 1 - Resolution with Exhibits A-F -FINAL..pdf

8" x 11'-7" KITCHEN 13'-7" x 14'-7" LIVING 13'-3" x 11'-10" KITCHEN/DINING...

Last Modified: 12/26/2023

Candidate Statement - Hovanes Tonoyan - 08-12-2024

Candidate Statement Hovanes Tonoyan Submitted to City Clerk’s Office: August 12

Last Modified: 07/06/2026

Attachment 8 - AUP Decision Letter Dated June 5, 2024

8 - PAGE 4 ATTACHMENT 8 - PAGE 5 ATTACHMENT 8 - PAGE 6 ATTACHMENT 8 - PAGE...7 ...

Last Modified: 10/18/2024

Appendix B_NOP and Recirc NOP Comments.pdf

The Site is currently developed with an existing two-tower (8 and 9 stories tall...(See e.g., Land Use Element,12 p. 3-15 [Goal 11 and Policy...

Last Modified: 12/13/2024

20210101_2814_W_Empire_Ave_NOI_Final.pdf

S-723 Three-phase 8' x 10' Transformer Pad Details I....S-794 8’ x 14’ Precast Manhole...

Last Modified: 08/30/2021

12/14/21 - PH - ATTACHMENT 4

Change in pattern, scale or character of general area of project Yes No 8....Substantial change in existing noise or vibration levels in the vicinity Yes No ...

Last Modified: 12/02/2021

Youth Volleyball Rules-2024 Revised 8-14.pdf

of the referee or the Sports Office Staff will be used to handle the situation. 12...Updated 8/14/24 AAH 4 6....Updated...

Last Modified: 08/14/2024

Youth Volleyball Rules-2024 Revised 8-14.pdf

of the referee or the Sports Office Staff will be used to handle the situation. 12...Updated 8/14/24 AAH 4 6....Updated...

Last Modified: 08/22/2024

Subdivison_Applications_and_Tentative_Tract_Map.pdf

Change in pattern, scale or character of general area of project Yes No 8....x x x ...

Last Modified: 01/11/2024

1018 N Sunset Canyon Dr_Project Plans

'-6 " 7' 12 ' 2' 13 '-6 " A A-8 B A- 8 S.D....'-0"-x 8'-0" ...

Last Modified: 03/04/2025

Attachment 8 - Budget Public Hearing 6.13.23.pdf

Starfighter Aircraft Rehabilitation PR 15,000 150,000 165,000 24546 Fire Station No. 12...Attachment 8 - Page 1 Project Dept Prior Year ...

Last Modified: 06/02/2023

2/8/22 - PH - Attachment 3

ZTA restricts the maximum allowed top of the roof height for front porches at 12...Top of the roof height of front porches shall be limited to 12...

Last Modified: 01/27/2022

Plans formal submittal #2_Part3

MECH CHKD X X X X X CUST....SERVICE ENTRANCE FACILITY: PROVIDE...

Last Modified: 11/14/2024

Plans formal submittal #2_Part3 (1).pdf

MECH CHKD X X X X X CUST....SERVICE ENTRANCE FACILITY: PROVIDE...

Last Modified: 11/14/2024

LALAX04397B_Planning_Commercial_Application_ updated

Burbank, CA 91506 X See LOA 12/12/23 Project No....Change in pattern, scale or character of general area of project...

Last Modified: 04/23/2024

Fall 2025 Lane Availability Chart (9.2.25 - 12.31.25) rev 4 (8).pdf

:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30...9 12 9 CLOSED9...

Last Modified: 09/22/2025

Th 12 4 Fri 12 5 Freeway interchange 134 and 5 closure NOS 20 21.pdf

CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS TRAFFIC ADVISORY North Outfall Sewer (NOS) Units 20 and 21 – Zoo Drive Right-of-Way to Doran Street Sewer Rehabilitation Project ...

Last Modified: 12/04/2025

Draft EIR.pdf

x 24'-8") RAMP COMMERCIAL 1,000 SF (45'-0" X 24'-8") H O LL YW O O D W...ATTACHMENT...

Last Modified: 03/24/2022

Plans formal submittal #2_Part1

PLAN 9 DIAGRAMS: LOT COVERAGE 10 PLANS: ABOVE-GRADE PARKING 11 PLANS: FIRST FLOOR 12...12 79 LOT 28 TR.NO. 6694 M.B.77-55 APN: 5621-026-008 LOT...

Last Modified: 11/14/2024

420 S. Sunset Cny - Project Plans - STAMPED.pdf

" 8' -3 " 17 '-6 " 12'-0" 4' -0 " 12 '-3 " 1' -6 " 8' -3 " SE...

Last Modified: 11/20/2023

Attachment 8.CIP - Budget Public Hearing 6.3.25

24375 CSB Security Enhance Fac PW 675,466 675,466 24546 UST Replace Fire 12...TOTALS SUMMARY OF PROJECTS BY CATEGORY FY 2025-26 Adopted Budget Attachment...

Last Modified: 05/22/2025

3313 Wedgewood Ln - Mailing Notice - 8-7-23.pdf

An appointment must be made with the Planning Division to file an appeal after 12...Third Street, Monday through Friday from 8:00 AM to Noon, or...

Last Modified: 08/07/2023

3_20_25 City of Burbank Compliant Product List

x 8 x 3" Contact vendor 7218636 Container Paper Fiber Hinged 8” X...

Last Modified: 04/01/2026

Attachment 8 - Budget Public Hearing 6.4.24.pdf

46,000 300,000 346,000 24824 FS 11 Kitchen Modern FAC PW 200,000 200,000 24546 FS 12...Attachment 8 - Page 1 City of Burbank  SUMMARY OF...

Last Modified: 05/24/2024

2nd Submittal SB35 - 910 S Mariposa - Project Plans.pdf

KITCHEN 14'-5" x 11'-1" DINING 14'-5" x 10'-0" LIVING 15'-1" x...

Last Modified: 07/06/2023

Attachment B - Project Plans.pdf

8" x 11'-7" KITCHEN 13'-7" x 14'-7" LIVING 13'-3" x 11'-10" KITCHEN/DINING...

Last Modified: 05/08/2023

Attachment B - Project Plans.pdf 1

8" x 11'-7" KITCHEN 13'-7" x 14'-7" LIVING 13'-3" x 11'-10" KITCHEN/DINING...

Last Modified: 06/26/2023

2019 WFPP (LARUCP).pdf

4 24" 16" 12" 7' - 3” 8' - 11” 9' - 10” 2 X 6 24" 16" 12" 10' - 8”...

Last Modified: 03/25/2021

UpperLARiver_Draft_Appendix4a.pdf

(March 13–November 5) or 8:00 a.m. to 6:00 p.m. (November 6– March 12)....Resources X Cultural Resources Geology/Soils ...

Last Modified: 03/25/2021

The Burbank Channel - Broadcast Schedule for February 8 to Feb.14.pdf

The Burbank Channel - Broadcast Schedule Saturday, February 8, 2025 to Friday,...00 Social Media Corner 11:00 City Council Meeting Wednesday, February...

Last Modified: 02/10/2025

Channel Program June 8, 2024 to June 14, 2024.pdf

The Burbank Channel - Broadcast Schedule Saturday, June 8, 2024 to Friday, June...14, 2024 Saturday, June 8 Sunday, June 9 Midnight...

Last Modified: 06/05/2024

Channel Program November 8 2025 to November 14 , 2025 .pdf

The Burbank Channel - Broadcast Schedule Saturday, November 8, 2025 to Friday, November...Bulletin Board 11:00 Social Media Corner 11:00 Bulletin Board Wednesday,...

Last Modified: 11/07/2025

420 S. Sunset Cny - Project Plans - 4-19-23.pdf

" 8' -3 " 17 '-6 " 12'-0" 4' -0 " 12 '-3 " 1' -6 " 8' -3 " SE...

Last Modified: 10/23/2023

2021 N Parish Place - Final Plans

13'-6" 8'-5" 11 '-0 " EAST(FRONT) (15.58 x 25.16)+(12.25 X 30.45)+(11.58x26.083...RATED LATH PLASTER ...

Last Modified: 08/22/2025

11/16/21 - PH - Attachment 1

On October 12, 2021, Appellant Mitchell M....deemed adequate for purposes of making decisions on the merits of the Project; X....-hollywood-way...

Last Modified: 11/04/2021

Channel Program April 8, 2023 to April 14, 2023.pdf

14, 2023 Saturday, April 8 Sunday, April 9 Midnight Hey Burbank!...00 Veterans Day 2022 8:00 Veterans Day 2022 9:00 Hey Burbank!...City...

Last Modified: 04/05/2023

777 N. Front St. - Final EIR Appendices.pdf

incorporated into the following dose algorithm: Doseair = Cair  {BR/BW} A  EF x...with the duration of construction activity: Riskinh = Doseair  CPF  ED/AT...

Last Modified: 03/31/2021

Exhibit B - 3130 N Lamer St - Approved Plans.pdf

6'- 10 " 7'- 4" 12 '-3 " 4'- 6" 7'- 6" 9' 26 '-5 " 3' 16 ' 2' 8'-6"8'...6'- 10 " 7'- 4"...

Last Modified: 11/08/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet