Search Results

Showing results for "SB 9 Urban Lot Split Eligibility Application"

No results were found that matched the keywords: SB 9 Urban Lot Split Eligibility Application.
Search Results

7. Infrastructure Oversight Board_Redacted

May 2025 Journal: American University Law Review, Staff Member Comment: “Split...Applicants must be residents of the City of Burbank. 5....I...

Last Modified: 06/24/2026

2026 AUG ISSUED

Avis parking lot. See approved plans....SCREENLAND DR New Single-Family Dwelling $150,000.00Valuation: NEW 867 SF DETACHED SB...NEW ...

Last Modified: 09/01/2026

Attachment 6 – Final EIR for the Burbank Housing and Safety Element Update (State Clearinghouse No. 2021020393) Finding of Consistency

............................................................................... 9.....................................................................................

Last Modified: 11/27/2024

20240624-BurbankTransportationStudyGuidelines-001.pdf

project or an increase in activity at an existing driveway where there could be a lot...changing facilities, or on-street bicycle infrastructure (bicycle lanes). ...

Last Modified: 06/24/2024

ApxK_Transportation Study.pdf

existing 101,566 square foot (sf) Fry’s Electronics store and surface parking lots...would replace an existing 101,566 sf Fry’s Electronics store and surface parking...

Last Modified: 07/09/2021

2025 NOV ISSUED

1000 S 11/03/2025 FLOWER ST Mechanical $15,000.00Valuation: NEW DUCTLESS MINI SPLIT...18/2025 SCREENLAND DR Multi-Family Repair and Maintenance $7,500.00Valuation: ...

Last Modified: 12/01/2025

Interview questions-round one and two.pdf

(youth, adults, seniors, income eligible guests, and non-profits) 8....9. Do you have experience in securing grant funds to help support...

Last Modified: 09/22/2023

Mag Park MDP Summary3.7.25.pdf

Summary Submitted to the City of Burbank, CA March 2025 Prepared By Urban...Two property assessment variables, building square footage (50%) and...

Last Modified: 03/11/2025

Burbank Tenant Protection Ordinance FAQ_updated6.10.26.pdf

Any three-day notice must be properly served in accordance with applicable law....hazardous materials, including lead-based paint, mold, or asbestos, in accordance with...

Last Modified: 06/10/2026

Burbank Tenant Protection Ordinance FAQ_updated6.10.26 (1).pdf

Any three-day notice must be properly served in accordance with applicable law....hazardous materials, including lead-based paint, mold, or asbestos, in accordance with...

Last Modified: 06/10/2026

Burbank Tenant Protection Ordinance FAQ_updated6.10.26 (2).pdf

Any three-day notice must be properly served in accordance with applicable law....hazardous materials, including lead-based paint, mold, or asbestos, in accordance with...

Last Modified: 06/10/2026

Burbank Tenant Protection Ordinance FAQ_updated6.10.26 (3).pdf

Any three-day notice must be properly served in accordance with applicable law....hazardous materials, including lead-based paint, mold, or asbestos, in accordance with...

Last Modified: 06/10/2026

Burbank Tenant Protection Ordinance FAQ_updated6.10.26 (4).pdf

Any three-day notice must be properly served in accordance with applicable law....hazardous materials, including lead-based paint, mold, or asbestos, in accordance with...

Last Modified: 06/10/2026

20190SB205_93.pdf

legislative counsel’s digest SB 205, Hertzberg....need to keep record of the applicable documentation....need to keep record of the...

Last Modified: 03/30/2021

Attachment 1 – Draft Firearm Retail Activity Use Regulations.pdf

any location that makes them ineligible to obtain a Conditional Use Permit, is eligible...has submitted a completed application....surrounding...

Last Modified: 03/05/2024

Attachment 1 – Draft Firearm Retail Activity Use Regulations (1).pdf

any location that makes them ineligible to obtain a Conditional Use Permit, is eligible...has submitted a completed application....surrounding...

Last Modified: 03/05/2024

Attachment 1 – Draft Firearm Retail Activity Use Regulations (1) (1).pdf

any location that makes them ineligible to obtain a Conditional Use Permit, is eligible...has submitted a completed application....surrounding...

Last Modified: 03/11/2024

Attachment 1 – Draft Firearm Retail Activity Use Regulations (1) (2).pdf

any location that makes them ineligible to obtain a Conditional Use Permit, is eligible...has submitted a completed application....surrounding...

Last Modified: 03/11/2024

Att3 - Heritage Commission Minutes for the June 5, 2025

An Application for Designation of an Eligible Historic Resource at 808 North Ford...Eligible historic Resource at 808...

Last Modified: 08/28/2025

2021_Burbank2035 Final Environmental Impact Report (Comments Responses on the Draft EIR, Corrections and Revisions to the Draft EIR, Mitigation Monitoring and Reporting Program).pdf

Altobelli 9/3/12 6 Individual Louis Altobelli 9/9/12 7 South Coast Air Quality...and convenient travel in a manner...

Last Modified: 07/29/2021

20230504-FY-2023-24-Proposed-Budget-Final.pdf

The total cost of the software is $50,000 which will be split between the Financial...This Program provides rent subsidy payments directly to landlords on behalf of...

Last Modified: 05/04/2023

118595314_07_17_2026_Minute_Order..

Metro filed its Reply on July 9, 2026....Application 1....Article 9 required good-faith efforts to negotiate; it did not...

Last Modified: 07/20/2026

DEIR Appendix H (LaTerra).pdf

Front Street B U R B A N K , C A DECEMBER 2018 1 3 1 9 .0...Front Street B U R B A N K , C A DECEMBER 2018 1 3 1 ...

Last Modified: 05/04/2021

STANDARD PLAN FORMATTING 2016 final.pdf

Lot Area (dimensions and calculations) 5....FOR RESIDENTIAL PROJECTS, ADD THE FOLLOWING TABULATIONS: 9....A materials/colors sample board...

Last Modified: 04/13/2022

2025 JAN ISSUED

SB BUILDING....W 01/17/2025 ALAMEDA AVE Mechanical $9,099.00Valuation: INSTALL (1) NEW MINI-SPLIT...New Commercial Structure ...

Last Modified: 02/04/2025

Final Mag Park MDP3.7.25.pdf

Plan Submitted to the City of Burbank, CA March 2025 Prepared By Urban...District Improvement and Activity Plan 9-13 ...

Last Modified: 03/11/2025

Def COB's Opposition to Motion for Preliminary Injunction doc

Metro filed its Reply on July 9, 2026....Application 1. Likelihood of Prevailing on the Merits a....Article 9...

Last Modified: 07/21/2026

FY 2024-25 Adopted Budget_Final

R   &  P O W ER W at er  F u n d   (4 9 7 ) El ec tr ic  F u n d   (4 9 6 )...9...

Last Modified: 09/05/2024

Decision Letter and Attachments_ LLA_410 S Victory Blvd_8.21.26

Building Division 7. 8. 9....All projects shall comply Title 9, Chapter 1, of the Burbank Municipal Code, and...The...

Last Modified: 08/24/2026

Plans.pdf

REQUIREMENT: SENATE BILL 407 (SB 407) REQUIRES NONCOMPLIANT PLUMBING FIXTURES TO...AutoCAD SHX Text APPLICABLE CODES:...

Last Modified: 04/06/2022

20210101_2020-2025 Consolidated Plan.pdf

Department of Housing and Urban Development....Not applicable....City-wide (CDBG Eligible Neighborhoods) located in CDBG...

Last Modified: 05/20/2021

20210101_Planning_Standard_Plan_Details.pdf

Lot Area (dimensions and calculations) 5....1 of 5 FOR RESIDENTIAL PROJECTS, ADD THE FOLLOWING TABULATIONS: 9....A...

Last Modified: 03/29/2021

20210101_Planning_Conditional_Use_Permit_Standard_Plan_Detail.pdf

Lot Area (dimensions and calculations) 5....1 of 5 FOR RESIDENTIAL PROJECTS, ADD THE FOLLOWING TABULATIONS: 9....A...

Last Modified: 03/29/2021

Planning_2021_STANDARD PLAN FORMATTING 2022 final.pdf

Lot Area (dimensions and calculations) 5....FOR RESIDENTIAL PROJECTS, ADD THE FOLLOWING TABULATIONS: 9....A materials/colors sample board...

Last Modified: 01/26/2022

1018 N Sunset Canyon Dr_Decision Letter_View Study_Final

of the BMC authorizing the City to require projects to comply with the Standard Urban...an average slope of 42.78 percent and the Project site is considered an upslope...

Last Modified: 03/27/2025

3915 Heffron Drive - Revised Plans - 6.30.26

LOT COVERAGE PER SEC. 10-1-628(C): 1,032 / 6,190 (LOT) = 16.7% COMMON OPEN SPACE...BATHTUBS WITH INSTALLED SHOWER HEAD SHALL BE FINISHED WITH A...

Last Modified: 09/04/2026

Youth Volleyball Rules 2021.pdf

and Recreation Department equipment and all sponsor's uniforms and equipment. 9....Sports Office will automatically release any player of his/her signature, and upon...

Last Modified: 11/21/2022

Youth Volleyball Rules 2021 (1).pdf

and Recreation Department equipment and all sponsor's uniforms and equipment. 9....Sports Office will automatically release any player of his/her signature, and upon...

Last Modified: 11/21/2022

Youth Volleyball Rules 2021 (2).pdf

and Recreation Department equipment and all sponsor's uniforms and equipment. 9....Sports Office will automatically release any player of his/her signature, and upon...

Last Modified: 11/21/2022

Attachment 5 – Analysis of Impediments Survey Results

10/25/2024 11:34 PM 5 Not applicable 10/25/2024 5:15 AM 6 None 10/24/2024 11:18...There are a lot of ethical issues in city offices. 10/24/2024...

Last Modified: 05/29/2025

11-03-2026 City of Burbank How to Run for City Office

Burbank Measure V In 2015, the State Legislature adopted and signed Senate Bill (SB...In compliance with SB 415, the City of Burbank General...

Last Modified: 06/11/2026

2025 JUN ISSUED

INSTALL NEW 1.5 TON DUCTLESS MINI SPLIT SYSTEM; REPLACE 14 ELECTRICAL OUTLETS &...SYSTEM & (1) 18000 BTU SPLIT SYSTEM SERVICING ENGINEERS OFFICE...

Last Modified: 07/01/2025

20210101_Planning_Supplemental_Condo_Form_and_Submittal Requirements.pdf

B ox 6 45 9, B ur ba nk , C A 91 51 0- 64 59 NEW CONSTRUCTION...____________________________________________________________________________ ...

Last Modified: 03/29/2021

20210301_AvionPlansPart3_Avion.pdf

LOT TREES REQUIRED (1:4 STALLS) = 116 NUMBER OF PARKING LOT TREES PROVIDED = 176...10 11 12 13 2 3 4 4 4 4 5 5 6 4 7 7 8 8 8 8 ...

Last Modified: 03/31/2021

6. Heritage Commission_Redacted.pdf

Education BS Urban Studies and Planning, Specialization in Community Services and...Commission (Chair) - Founder of the original Buy Nothing Group that eventually...

Last Modified: 06/16/2022

HDMguidelines2021.pdf

Am I Eligible?...Submit an application on site, or assistance can be provided over the phone....Once the application is...

2026.07.09 Pet. Metro's Response to City Evidentiary Objections to M. McKenna Declaration

project unless Metro . . . completes subsequent environmental review” regarding SB...his testimony describing the materials Metro reviewed in evaluating the City’s...

Last Modified: 07/20/2026

20260505-Safer Streets Burbank Action Plan_Final-001.pdf

System approach, Burbank is implementing industry best practices, and ensuring eligibility...Alignment Framework Framework for assessing roadway improvements ...

Last Modified: 05/05/2026

ACFR 2025

Real Estate Group, the complex is located at the back half of The Burbank Studios Lot...Discover Ranch Lot Studios: A 30-acre studio campus on...

Last Modified: 12/23/2025

Appendix D_Cultural Resources Assessment.pdf

................................................................................9...Journal of California and Great Basin Anthropology 9(1):120–...

Last Modified: 12/13/2024

Workplace Violence Prevention Plan 2025 Version

effective Workplace Violence Prevention Plan as required by California Senate Bill (SB...environment for employees, all employees are responsible for complying with all...

Last Modified: 11/03/2025

910 S Mariposa St (2)

Last Modified: 05/08/2026

4/5/22 - PH(2) - Attachment 7

SB 9 No Parking Requirements Parcels Legend City Boundary SB 9 No Parking Requirement...Parcels...

Last Modified: 03/24/2022

Burbank2035 EIR Appendix F, Part 2.pdf

the large developments within Burbank that were included are the Warner Brothers Lot...As is typical for urban-area models, the model network...

Last Modified: 07/29/2021

Daylight Saving Time Begins March 9, 2025 at 2:00AM

the City of Burbank - Daylight Saving Time begins at 2:00 a.m. on Sunday, March 9,...the City of Burbank - Daylight Saving Time begins at 2:00 a.m. on Sunday, March...

Last Modified: 03/07/2025

SB35_Informational_Meeting_Summary.pdf

35 project at 2814 Empire Ave. (148 units); the SB 35 project at 3000 Empire Ave.... (337 units), and the SB 35 project at 3001 Empire Ave. (131...

Last Modified: 08/14/2023

SB35_Informational_Meeting_Summary (1).pdf

35 project at 2814 Empire Ave. (148 units); the SB 35 project at 3000 Empire Ave.... (337 units), and the SB 35 project at 3001 Empire Ave. (131...

Last Modified: 08/14/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet