Search Results

Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta"

No results were found that matched the keywords: dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta.
Search Results

PWGreenStreetPolicy.pdf

Other possible permeable paving materials include porous concrete and porous asphalt...or loading road areas, and other areas of limited vehicular access can also be...

Last Modified: 03/25/2021

Green-Streets-Policy.pdf

Other possible permeable paving materials include porous concrete and porous asphalt...or loading road areas, and other areas of limited vehicular access can also be...

Last Modified: 04/13/2026

BPAP PERMIT REQUIREMENTS

All existing and new driveways, driveway curb cuts, paved front yard areas and front

Last Modified: 11/19/2024

20210301_AppendixFGHGTechReport_Avion.pdf

1 Paving Equipment 5 10.00 132 0.36 Paving-Phase 1 Pavers 2 10.00 130 0.42 Foundation-Phase...2 Surfacing Equipment 1 10.00 263 0.30 ...

Last Modified: 03/31/2021

2026.07.27 Pet. Metro's DeFrenza Declaration ISO Motion for Reconsideration

concrete | Olive / Hollywood Way Cure Time Place roadway reconstruction (AC pave...finish bus pad concrete | Olive and Verdugo Place roadway reconstruction (AC...

Last Modified: 08/06/2026

202101_3329 Durham Court- HDP Decision Letter_final.pdf

applicant will have to restore the street fronting the property per City of Burbank paving...Additional impacts to street triggered by this project could extend the...

Last Modified: 06/02/2021

3341 Wedgewood Ln - Decision Letter - SIGNED.pdf

applicant will have to restore the street fronting the property per City of Burbank paving...Additional Impacts to street triggered by this project could extend the...

Last Modified: 04/14/2022

Exhibit D 3000 Objective Development Standard Responses .pdf

Bicycle parking facilities shall be located on a hard paved surface and shall be...construct, alter, repair, raise, build or move any permanent building, structure,...

Last Modified: 05/02/2023

Attachment 3. Current Title 7, Chapter 4 of the BMC.pdf

Public Works Department shall notify the Department of any applications for new paving...regulations. 7-4-118: TREE WELL COVERS: Whenever any parkway or planting strip is...

Last Modified: 02/02/2023

20210101_1258_E_Elmwood_Decision.pdf

applicant will have to restore the street fronting the property per City of Burbank paving...Additional impacts to street triggered by this project could extend the...

Last Modified: 04/13/2021

20210301_AppendixAISNOPandComments_Avion.pdf

Enhanced paving and plant containers would define exterior spaces for dining and...Further, the project site is partially paved with asphalt and...

Last Modified: 03/31/2021

20210204-Bicycle-Master-Plan-Presentation-001.pdf

Bikeway – Typically called a bike path, this provides for bicycle travel on a paved

Last Modified: 02/05/2021

Combined Attachments A-N.pdf

PAVED SURFACES....In places where private and public paved areas join, such as plazas, outdoor cafes...######## 4825 SAN L OAKLAND 94601 95-100%...

Last Modified: 05/24/2023

20210301_AppendixHHydrologyandWater_Avion.pdf

- Pave fueling area with concrete rather than asphalt....Pave loading areas with concrete instead of asphalt....If it is...

Last Modified: 03/31/2021

Appendix E_Preliminary Geotech.pdf

The area of planned development within the site is currently occupied by a paved...The site is bounded by Thornton Avenue to the north, by a paved...

Last Modified: 12/13/2024

CityofBurbank_MetroNoHoPasBRTCommentLetter12-20-2020.pdf

ENGINEERING DIVISION General Requirements:  The City’s arterial paving program

Last Modified: 10/27/2021

Electric Mobility Devices

Last Modified: 02/23/2026

ApxI_NoiseandVibrationImpactStudy.pdf

54 49 56 39 49 38 Landscaping 57 54 59 44 53 42 Overlapping Phases (Paving +...Architectural Coating) 62 57 63 47 57 46 Overlapping Phases...

Last Modified: 07/09/2021

Burbank 2500 N Hollywood NOP_March 2024.pdf

pedestrian connection to the Hotel entrance for guests, indicated by decorative paving...Project (irrespective of whether the damage is preexisting), and...

Last Modified: 03/05/2024

Apx D - Air Quality Analysis Technical Memorandum

o All on-site roads will be paved as soon as feasible or watered periodically or...Construction Paving 5.8....Construction...

Last Modified: 10/20/2026

SR - Proposed Public Tree Ordinance FINAL.pdf

sidewalks of adequate width, benches, street trees and landscaping, decorative paving

Last Modified: 02/02/2023

EDGAR MARKOSYAN - 436 TUFTS AVE PLANS

STUCCO SHALL HAVE A MINIMUM CLEARANCE TO EARTH OF 4 INCHES AND 2 INCHES TO PAVED...PATHWAY (E) PAVED AREA (E) LANDSCAPE (E) LANDSCAPE (E)...

Last Modified: 06/30/2025

DEIR Appendix F (LaTerra).pdf

is not required; however, paving constructed over existing uncertified fill or...alluvium be excavated and properly compacted for paving...

Last Modified: 05/04/2021

Attachment 1, Exhibit B - Consistency Matrix

Bicycle parking facilities shall be located on a hard paved surface and shall be...All paved areas shall be maintained in the manner required to...

Last Modified: 11/19/2024

Appendix 11.1G_Noise Analysis.pdf

Construction Noise Model (RCNM),Version 1.1 Report date: 5/7/2021 Case Description: Paving...Construction Noise Model (RCNM),Version 1.1 Report date: 5/7/2021...

Last Modified: 11/29/2021

719 Wilson Ct - Approval Letter - FINAL

applicant will have to restore the street fronting the property per City of Burbank paving...Additional impacts to street triggered by this project could extend the...

Last Modified: 02/15/2024

526 S Sunset Cyn Dr - Decision Letter

applicant will have to restore the street fronting the property per City of Burbank paving...Additional impacts to street triggered by this project could extend the...

Last Modified: 02/16/2024

3333 Brace Canyon Road - HDP - Approval Letter

applicant will have to restore the street fronting the property per City of Burbank paving...Additional impacts to street triggered by this project could extend the...

Last Modified: 08/07/2024

Att2 - Heritage Commission Report dated June 5, 2025

garage • Some with porte cocheres • Hollywood style (center grass) or a fully paved...Landing strips- original three- one ways, now only two...

Last Modified: 08/28/2025

20210101_Planning_Supplemental_TTM.pdf

limited to, such items as street trees, lighting system, sidewalk, curb, gutter, paving

Last Modified: 03/29/2021

2801 Joaquin Dr - Revised MFE - Approval_signed

applicant will have to restore the street fronting the property per City of Burbank paving

Last Modified: 01/13/2025

2021 N Parish Place - Final Plans

AND PLANNING DEPARTMENTS; AND ALL EXISTING AND NEW DRIVEWAYS, DRIVEWAY CURB CUTS, PAVED...SLOPED CONCRETE WALKWAY (E) PAVED WALKWAY 5'-0" 5% ...

Last Modified: 08/22/2025

Attachment 8 - CIP Projects by Category

FY 25/26 Annual Sidewalk Reh PW 1,400,000 1,400,000 25104 FY 25/26 Annual Res Pave...Program BWP 400,000 200,000 100,000 100,000 100,000 100,000 600,000 1,600,000 25146...

Last Modified: 05/21/2026

Planning_2021_ 3700 Riverside Dr Appendix 11.1A_AQ_GHG_Energy_HRA.pdf

Tractors/Loaders/Backhoes 1 7.00 97 0.37 Paving Rollers 1 7.00 80 0.38 Paving...Tractors/Loaders/Backhoes 1 7.00 97 0.37 ...

Last Modified: 11/29/2021

20210401_3700RD_Appendix_A.pdf

Tractors/Loaders/Backhoes 1 7.00 97 0.37 Paving Rollers 1 7.00 80 0.38 Paving...Tractors/Loaders/Backhoes 1 7.00 97 0.37 ...

Last Modified: 04/12/2021

20201210.AdoptedCIP18_19.pdf

Streets: Approximately 230 miles of streets, 50 miles of paved alleys, 368 miles

Last Modified: 12/10/2020

2021_Planning_1200 Hollywood Way Project Plans.pdf

ADDITIONAL IMPACTS TO STREET TRIGGERED BY THIS PROJECT COULD EXTEND THE PAVING RESTORATION...WHERE TREES ARE WITHIN 5' OF WALKWAYS AND / OR PAVING...

Last Modified: 07/28/2021

Attachment 1 - 2022.10.14 Attachment 1-Entitlements ResolutionV4.pdf

Additional impacts to street triggered by this project could extend the paving...Bicycle parking facilities shall be located on a hard paved...

Last Modified: 10/21/2022

Attachment 8.CIP - Budget Public Hearing 6.3.25

25/26 Annual Sidewalk Reh PW 1,400,000 1,400,000 25104 FY 25/26 Annual Res Pave...400,000 200,000 100,000 100,000 100,000 600,000 1,500,000 25146...

Last Modified: 05/22/2025

1018 N Sunset Canyon Dr_Decision Letter_View Study_Final

applicant will have to restore the street fronting the property per City of Burbank paving...Additional impacts to street triggered by this project could extend the...

Last Modified: 03/27/2025

20210101_4210_National_ProjectPlans.pdf

-1/2" FLANGE AT STUCCO SIDING PLACED A MINIMUM OF 4" ABOVE EARTH OR 2" ABOVE PAVED...-1/2" FLANGE AT STUCCO SIDING PLACED A MINIMUM OF 4" ABOVE EARTH OR 2" ABOVE ...

Last Modified: 04/13/2021

2021_Pickwick_Landscape_Plan.pdf

Enhanced paving at main project entry....Integral colored concrete paving at open space gathering. 4' wide community natural

Last Modified: 11/23/2021

Appendix H_Noise Data.pdf

Roadway Construction Noise Model (RCNM),Version 1.1 Report date######## Case Descr Paving...Roadway Construction Noise Model (RCNM),Version 1.1 Report date######## ...

Last Modified: 12/13/2024

3036 Scott Rd_Decision Letter_Final_Signed

applicant will have to restore the street fronting the property per City of Burbank paving...Additional impacts to street triggered by this project could extend the...

Last Modified: 03/04/2025

UST with HM Removal Application

replaced, backfill shall be placed and completed to sub-grade elevation after which paving...replaced, backfill shall be placed and completed to sub-grade elevation after...

Last Modified: 10/06/2025

Attachment 1 - 1521 E. Alameda Ave - Draft Resolution (V Reviewed by SP) CCO EDITS Most recent as of 2.13.23.pdf

applicant will have to restore the street fronting the property per City of Burbank paving...Additional impacts to street triggered by this project could extend the...

Last Modified: 02/17/2023

Planning_Attachments A-K_3000 Empire Ave.pdf

Bicycle parking facilities shall be located on a hard paved surface and shall be...construct, alter, repair, raise, build or move any permanent building, structure,...

Last Modified: 01/07/2022

2021_Planning_802 E. Angeleno - Architectural - 08.05.21.pdf

ALL EXISTING AND NEW DRIVEWAYS, DRIVEWAY CURB CUTS, PAVED FRONT YARD AREAS AND FRONT...WITH A 3 1/2" FLANGE AT STUCCO SIDING PLACED A MIN. 4" ABOVE EARTH OR 2" ABOVE...

Last Modified: 08/26/2021

Appendix G - Geotechnical Report.pdf

of the backfill will be necessary to reduce settlement of overlying walks and paving...PAVEMENTS Prior to placing paving, the existing grade...

Last Modified: 01/07/2025

20130213_Chapter 2 - Air Quality and Climate Change.pdf

coatings,  residential  fuel  combustion,  construction  and demolition, dust  from paved...restaurants  with  charbroilers and construction sites (diesel ...

Last Modified: 11/17/2021

3526 Castleman HDP - Signed Decision

applicant will have to restore the street fronting the property per City of Burbank paving...Additional impacts to street triggered by this project could extend the...

Last Modified: 09/22/2026

777 N. Front St. - Final EIR Appendices.pdf

0.0950 Architectural Coating/2024 0.0951 Architectural Coating/2025 0.0951 Paving...1435 4 Architectural Coating Architectural Coating 1/2/2023 9/30/2025 5 717 5...

Last Modified: 03/31/2021

2021 N Parish Place - Decision Letter (final)

• Decorative paved surface, pavers, etc....The paved pathway meets the required 48” minimum width dimension....Additional impacts to street ...

Last Modified: 09/15/2025

Attachment 6 – First Amendment to Development Agreement.pdf

Arcades, canopies , non-reflective paving and artificial illumination shall be...All setbacks and non-paved areas shall be landscaped....Operate...

Last Modified: 01/18/2024

202101_Plans_600 N. Rose - Plans.pdf

PAVED AREA - 687 SQFT.

Last Modified: 06/15/2021

Planning_2021_3700 Riverside Draft EIR.pdf

As depicted on Exhibit 3-5a through 3-5c, all setback and non-paved areas would...Specifically, the paved area surrounding the car wash building...

Last Modified: 11/29/2021

Draft EIR.pdf

As depicted on Exhibit 3-5a through 3-5c, all setback and non-paved areas would be...Specifically, the paved area surrounding the car wash building...

Last Modified: 03/24/2022

ApxD_EnergyCalculations.pdf

Building Construction Sweepers/Scrubbers 1 8 64 0.46 418 98,447 Paving

Last Modified: 07/09/2021

CIP Updates New Projects

segments and continue with design efforts Cont'd 38 FY 24/25 Annual Residential Pave

Last Modified: 03/03/2025

20210301_AppendixEGeotechInvestigat_Avion.pdf

northeast portion of the site is utilized as a parking area for trucks and is currently paved...LaboratoryDepth Lith- (feet) ology Material Description GJ a>i fO 3 CQ O c...

Last Modified: 03/31/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet