Search Results

Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Custom Wall Panel Bergaransi Wonogiri"

No results were found that matched the keywords: dWA 0812 2782 5310 [[PANDAWA]] Custom Wall Panel Bergaransi Wonogiri.
Search Results

Source Area Removal SVE Design Drawings 1

Custom solutions. INDEX OF DRAWINGS SHEET NO....GAC VESSEL 2 - 4,900 LBS NORTH WALL EXTERIOR ELEVATION 3/8" = 1'-0" WEST...

Last Modified: 03/18/2025

20260630-FY-26-27-Adopted-Fee-Schedule

Meter Effective January 1, 2027 $15.40 Meter Definitions: Large: Service with panel...Meter Effective January 1, 2027 $15.40 Meter Definitions Large: Service with...

Last Modified: 06/29/2026

20260814-FY-26-27-Adopted-Revised

definition of Large; typically single-family residential Large: Service with panel...Large: Service with panel size greater than 200A (3)...

Last Modified: 08/17/2026

FY 2026-27 Adopted Fee Schedule

definition of Large; typically single-family residential Large: Service with panel...Large: Service with panel size greater than 200A (3)...

Last Modified: 09/22/2026

2021_Planning_3141 Jolley Drive_Site Plans.pdf

W A L L ' Y ' WALL 'Z' WALL 'Z1' W A L L ' X ' WALL 'AB' WALL 'AC'...W A L L '...

Last Modified: 10/26/2021

PROPOSED FY 2025-26 FEE SCHEDULE

b) Medium $4.45 Meter (c) Large $13.37 Meter Definitions: Large: Service with panel...(b) Medium $4.45 Meter (c) Large $13.37 Meter Definitions Large: Service with...

Last Modified: 05/01/2025

Adopted FY 2025-26 FEE SCHEDULE - Final

b) Medium $4.45 Meter (c) Large $13.37 Meter Definitions: Large: Service with panel...(b) Medium $4.45 Meter (c) Large $13.37 Meter Definitions Large: Service with...

Last Modified: 08/07/2025

FY 2025-26 ADOPTED FEE SCHEDULE FINAL

Meter Effective January 1, 2026 $13.37 Meter Definitions: Large: Service with panel...Meter Effective January 1, 2026 $13.37 Meter Definitions Large: Service with...

Last Modified: 09/05/2025

20250625 (3).fy25_26feescheduleadopted.pdf

b) Medium $4.45 Meter (c) Large $13.37 Meter Definitions: Large: Service with panel...(b) Medium $4.45 Meter (c) Large $13.37 Meter Definitions Large: Service with...

Last Modified: 12/18/2025

Revised FY 2025-26 Adopted Fee Schedule FINAL

Meter Effective January 1, 2026 $13.37 Meter Definitions: Large: Service with panel...Meter Effective January 1, 2026 $13.37 Meter Definitions Large: Service with...

Last Modified: 09/17/2025

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

b) Medium $4.45 Meter (c) Large $13.37 Meter Definitions: Large: Service with panel...(b) Medium $4.45 Meter (c) Large $13.37 Meter Definitions Large: Service with...

Last Modified: 03/18/2026

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Meter Effective January 1, 2026 $13.37 Meter Definitions: Large: Service with panel...Meter Effective January 1, 2026 $13.37 Meter Definitions Large: Service with...

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Meter Effective January 1, 2026 $13.37 Meter Definitions: Large: Service with panel...Meter Effective January 1, 2026 $13.37 Meter Definitions Large: Service with...

Last Modified: 03/17/2026

1310 E Tujunga Ave - PLANS

BUILDING SUPPLY LINE FROM THE CUSTOMER SHUTOFF VALVE TO THE BUILDING....PANEL LOCATIONS Panels shall not be located in...

Last Modified: 04/03/2026

Attachment 8 - Budget Public Hearing 6.13.23.pdf

Pavement Rehabilitation PW 5,000,000 5,000,000 23810 First Street Village Sound Wall...Payment Options 24/25 PS 800,000 800,000 23352 DC Panel...

Last Modified: 06/02/2023

Attachment 8 - Budget Public Hearing 6.13.23 (1).pdf

Pavement Rehabilitation PW 5,000,000 5,000,000 23810 First Street Village Sound Wall...Payment Options 24/25 PS 800,000 800,000 23352 DC Panel...

Last Modified: 06/02/2023

Attachment 8 - Budget Public Hearing 6.13.23 (2).pdf

Pavement Rehabilitation PW 5,000,000 5,000,000 23810 First Street Village Sound Wall...Payment Options 24/25 PS 800,000 800,000 23352 DC Panel...

Last Modified: 06/02/2023

3518 Haven way - Project Plans

Electrical equipment and panel boards c....WALL (STRENGTHENING) (N) WALL. FOOTING (STRENGTHENING) (E) CONC....

Last Modified: 08/03/2026

2026 FEB SPV

2026 1721 LANDIS ST 02/03/2026 02/11/2026BS2601107 REMOVE/REINSTALL (E) SOLAR PANELS...PERMIT) 02/04/2026 710 N MAPLE ST 02/04/2026BS2601148 REMOVE/REINSTALL (E)...

Last Modified: 03/03/2026

Planning_2021_ 929 E San Jose Project Plans.pdf

METER/ PANEL (E) TANKLESS W/H (E) AC CONDENSER (E) GAS METER (N) TANKLESS W...S LEGEND: NEW WALL DEMO WALL 1HR...

Last Modified: 12/07/2021

FY 2024-24 Adopted Fee Schedule revised

b) Medium $3.96 Meter (c) Large $11.83 Meter Definitions: Large: Service with panel...(b) Medium $3.96 Meter (c) Large $11.83 Meter Definitions Large: Service with...

Last Modified: 12/12/2024

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

b) Medium $3.96 Meter (c) Large $11.83 Meter Definitions: Large: Service with panel...(b) Medium $3.96 Meter (c) Large $11.83 Meter Definitions Large: Service with...

Last Modified: 09/04/2025

FY 2024-25 Adopted Fee Schedule

b) Medium $3.96 Meter (c) Large $11.83 Meter Definitions: Large: Service with panel...(b) Medium $3.96 Meter (c) Large $11.83 Meter Definitions Large: Service with...

Last Modified: 06/27/2024

20210101_921_Riverside_Dr_City_Response_Final.pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/30/2021

2814 Empire Plans.pdf

The service panels or sub-panels shall be identified in accordance with Section...Solid Joint at trap-no access panel...

Last Modified: 10/13/2022

Attachment 4 (3).pdf

The service panels or sub-panels shall be identified in accordance with Section...Solid Joint at trap-no access panel...

Last Modified: 10/20/2022

Attachment 4 (4).pdf

The service panels or sub-panels shall be identified in accordance with Section...Solid Joint at trap-no access panel...

Last Modified: 10/20/2022

Attachment 4..pdf

The service panels or sub-panels shall be identified in accordance with Section...Solid Joint at trap-no access panel...

Last Modified: 10/27/2022

20220620-FY-22-23-Adopted-Fee-Schedule.pdf

(b) Medium $3.00 Meter (c) Large $8.99 Meter Definitions: Large: Service with panel...(b) Medium $3.00 Meter (c) Large $8.99 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

20230309-FY-22-23-Adopted-Fee-Schedule.pdf

(b) Medium $3.00 Meter (c) Large $8.99 Meter Definitions: Large: Service with panel...(b) Medium $3.00 Meter (c) Large $8.99 Meter Definitions Large: Service with...

Last Modified: 03/09/2023

2025 MAR ISSUED

Alteration $5,000.00Valuation: Add new door in existing garage, two 4' shear walls...UPGRADE TO 400 AMPS, 4-GANG PANEL....4400 03/05/2025 ...

Last Modified: 04/04/2025

Project Plans- 2118 Hilton

EXISTING BLOCK WALL TOP OF WALL 2'-0" TOP OF WALL 3'-0" TOP OF WALL 2'-6" 19...2'-0" TOP OF...

Last Modified: 06/10/2026

2607 W Magnolia Blvd - Approved Project Plans - STAMPED

BRACED WALL PANELS SHALL START AT NOT MORE THAN 8' FROM EACH END OF A BRACED WALL...BRACED WALL...

Last Modified: 02/15/2024

2613 W Magnolia Blvd - Project Plans - 1-15-24

BRACED WALL PANELS SHALL START AT NOT MORE THAN 8' FROM EACH END OF A BRACED WALL...BRACED WALL...

Last Modified: 01/31/2024

2025 MAR FINALED

) TOILET, (1) BATHTUB, (1) KITCHEN SINK, (1) SHOWER, (1) WATER HEATER, (1) SUB-PANEL...) TOILET, (1) BATHTUB, (1) KITCHEN SINK, (1) SHOWER, (1) WATER HEATER, (1)...

Last Modified: 04/04/2025

20201210.FY20_21FeeScheduleADOPTED.pdf

meet definition of Large;typically Single Family Residential Large: Service with panel...definition of Large; typically Single Family Residential Large: Service with...

Last Modified: 06/20/2022

2021_Pickwick_Arch_and_Site_Plan.pdf

Panel Stucco Arch Low Tile Wall w/ Tile Cap (Barranca) Decorative Shutters with...Panel Stucco Arch Low Tile...

Last Modified: 11/23/2021

20201210.FY19_20FeeScheduleADOPTED.pdf

meet definition of Large;typically Single Family Residential Large: Service with panel...definition of Large; typically Single Family Residential Large: Service with...

Last Modified: 06/20/2022

Attachment 1, Exhibit D - Plan submittal

Proposed wall, pilaster, gate or fence, per Wall & Fence Plan L-3....FOR PANEL SCHEDULES REFER TO E700 3....FOR...

Last Modified: 11/19/2024

WMR 9.27.24.pdf

customers who are seniors over the age of 62 or disabled customers, and 31 customers...Customer...

Last Modified: 09/27/2024

WMR 9.27.24 (1).pdf

customers who are seniors over the age of 62 or disabled customers, and 31 customers...Customer...

Last Modified: 09/27/2024

4007 Riverside Drive - plans.pdf

I_ _J LEGENED EXISTING WALL LEGENED EXISTING WALL UUTO<XlR AREA DEVUTED...LOCATIONS F.F. 1 8 " 12" REF FOR DETAIL NOTES A ...

Last Modified: 05/10/2023

Project Plans 567 Santa Anita

ALL BRANCH CIRCUITS ARE PERMITTED TO BE SUPPLIED BY THE MAIN SERVICE PANEL PRIOR...GLASS DOOR ADJACENT PANELS, AND ALL GLAZED OPENINGS WITHIN 18"...

Last Modified: 09/29/2026

2025 DEC SPV

91502 SOLAR PHOTOVOLTAIC SYSTEMS Page 1 of 4 Office Applied Issued Final Solar Panels...modules (10.44KW) with Tesla Inc. inverter; install 3 ESS units on an exterior...

Last Modified: 07/16/2026

202101_Plans_600 N. Rose - Plans.pdf

GAS METER SUB-PANEL EX. F.P. EX. 6' TALL CONC. WALL EX. 6' TALL CONC....WALL E X . U T I L I T Y E A S E M...

Last Modified: 06/15/2021

2025 SEPT FINALED

09/29/2025Permit Final Final Date:Permit Status: Deferred submittal, Acoustical Panel.../29/2025Permit Final Final Date:Permit Status: Deferred Submittal - Acoustical...

Last Modified: 10/06/2025

202101_3201 Scott Rd_Project plans emailed 4.14.21.pdf

MODERN STEEL COLLECTION GROOVED PANEL COLOR - CHARCOAL TO MATCH WINDOW FRAMES ALUMINUM...STEPS 3' WIDE PAINTED WROUGHT IRON FENCE GATES COLOR - TO MATCH WINDOW FRAMES ...

Last Modified: 06/07/2021

526 S. SUNSET CYN DR - Project Plans - 09-29-23

IN AREA WITHIN 18" OF THE FLOOR OR 36" INCHES OF GRADE AND GLASS DOOR AND WALL PANELS...CPC / BWP WATER DIVISION ...

Last Modified: 01/23/2024

20211202-FY-2021-22-ADOPTED-CIP.pdf

450,000 1,095,000 H-31 Data Center Hardware BWP 550,000 550,000 H-32 DC Panel...& McCambridge 100,000 100,000 H-33 DC Panel Upgrades TBD...

Last Modified: 12/02/2021

2025 MAR SPV

2025BS2501199 Hotel/ Motel Applied Issued Final 45.03 KW DC ROOF MOUNT PV SYSTEM - 114 PANELS...PV modules (10.4KW) with 26 micro-inverters; install 2 ESS units on an...

Last Modified: 04/04/2025

Full Plan Set 10.30.23.pdf

INTO EXISTING CMU SITE WALL EXISTING CMU SITE WALL TO REMAIN REMOVE EXISTING...IRON FENCE PREPARE TOP OF EXISTING ...

Last Modified: 11/28/2023

1719 RUDELL RD_HDP_10.7.25 PROJECT PLANS

e Slope Plan approval is conditional that a separate Main Electrical Service Panel...sliding door_15' 15' - 0" 6' - 8" 0' - 0" 4 1 4 panel...

Last Modified: 12/08/2025

2023092023-FY-23-24-Fee-Schedule-Final.pdf

b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions: Large: Service with panel...(b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions Large: Service with...

Last Modified: 09/20/2023

20230630-FY-23-24-Fee-Schedule-Final.pdf

b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions: Large: Service with panel...(b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions Large: Service with...

Last Modified: 07/10/2023

20230710-FY-23-24-Fee-Schedule-Final.pdf

b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions: Large: Service with panel...(b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions Large: Service with...

Last Modified: 07/10/2023

20231005-FY-23-24-Fee-Schedule_Final.pdf

b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions: Large: Service with panel...(b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions Large: Service with...

Last Modified: 10/05/2023

20230731-FY-23-24-Fee-Schedule-Final

b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions: Large: Service with panel...(b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions Large: Service with...

Last Modified: 07/31/2023

20230901-FY-23-24-Fee-Schedule_Final

b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions: Large: Service with panel...(b) Medium $3.47 Meter (c) Large $10.38 Meter Definitions Large: Service with...

Last Modified: 09/01/2023

2025-08-08_Full Set (Arch+Civil+Land) - Copy

RETURN REGISTER IN WALL POWER PANEL IN EQUIP....RETURN REGISTER IN WALL POWER PANEL IN ...

Last Modified: 12/02/2025

Project Plans - 2925 N Lamer St

FOOTING PANEL PER PLAN SLOPE 1 4" PER 1'-0" MIN....PANEL PER PLAN #10 TEK @ 12" O.C....DETAIL BEAM TO POST PANEL TO...

Last Modified: 02/07/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet