Search Results

Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Custom Wall Panel Bergaransi Wonogiri"

No results were found that matched the keywords: dWA 0812 2782 5310 [[PANDAWA]] Custom Wall Panel Bergaransi Wonogiri.
Search Results

2925 N Lamer St_Plans_c4_1.27.25

FOOTING PANEL PER PLAN SLOPE 1 4" PER 1'-0" MIN....PANEL PER PLAN #10 TEK @ 12" O.C....DETAIL BEAM TO POST PANEL TO...

Last Modified: 03/04/2025

Attachment 4 Project Plans and Subdivision Map...pdf

Panel Stucco Arch Low Tile Wall w/ Tile Cap (Barranca) Decorative Shutters with...Panel Stucco Arch Low Tile...

Last Modified: 10/20/2022

20210622_2814_Empire_Ave_City_Response.pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/27/2021

2021_Planning_Plans_4336 CLYBOURN AVE_may submittal.pdf

Access Panel APPROX Approximate ARCH Architectural ASPH Asphalt BD Board BITUM Bituminous...WOOD DOOR PAINTED BLACK GARAGE DOOR CONCEPT IMAGE - SOLID...

Last Modified: 07/22/2021

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions: Large: Service with panel...$8.37 Meter Effective April 1, 2022 $8.48 Meter Definitions Large: Service with...

Last Modified: 06/20/2022

Guide to Burbank.pdf

The Council Chamber is paneled in teakwood and the Mayor’s office in semi-bent burl...Other work included: refinishing the teak paneling on the...

Last Modified: 01/03/2025

Guide to Burbank 2026 - May 2026

The Council Chamber is paneled in teakwood and the Mayor’s office in semi-bent burl...Other work included: refinishing the teak paneling on the...

Last Modified: 05/07/2026

5-3 - PH Attachment 3

., smart thermostat, electrical vehicle charger, solar panels, cool roofs, etc.)...in a safe manner during this pandemic as restaurants rely more on takeout from...

Last Modified: 04/21/2022

Attachment 3 - Community Survey.pdf

., smart thermostat, electrical vehicle charger, solar panels, cool roofs, etc.)...in a safe manner during this pandemic as restaurants rely more on takeout from...

Last Modified: 04/21/2022

Decision Letter - Combined

e Slope Plan approval is conditional that a separate Main Electrical Service Panel...sliding door_15' 15' - 0" 6' - 8" 0' - 0" 4 1 4 panel...

Last Modified: 12/30/2025

5-3 - PH Attachment 1

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...1 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 04/21/2022

Attachment 1 - Exhibit 1 GGRP Update Draft_3.9.2022_wAPPS_PublicReview_reduced size.pdf

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...1 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 04/21/2022

920 E Cedar Ave - Project Plans.pdf

FACTOR OPENING OPPOSITE PAINT(ED) PLANTER DRAIN PLATE PLASTIC LAMINATE PLYWOOD PANEL...FIRE RATED FIBERGLASS REINFORCED PANEL FINISHED SURFACE FOOT...

Last Modified: 02/17/2022

WMR 2.28.25.pdf

Customer in-person meetings Customer maintenance calls/discovery calls January...Customer Audits (#) ...

Last Modified: 02/28/2025

Exhibit A - 1 - GGRP Update Draft_3.9.2022_wAPPS_PublicReview.pdf

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 03/10/2022

GGRP Update Final_w.App

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 11/13/2025

GGRP Update Final_w.App.pdf

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 10/23/2022

3915 Heffron Drive - Revised Plans - 6.30.26

PROVIDE ALL NECESSARY CEILING OR WALL ACCESS PANELS AS REQUIRED FOR AIR CONDITIONING...IN FIRE RATED ASSEMBLIES PROVIDE RATED ACCESS...

Last Modified: 09/04/2026

02192013_Burbank_Greenhouse_Gas_Reduction_Plan.pdf

windows and doors, attic insulation, central air conditioners, solar attic fans, wall...Intergovernmental Panel on Climate Change. 2000....See...

Burbank GGRP CEQA_3.9.2022_CLEAN.pdf

Action W-1.1.c Continue enforcement of large irrigation customers required to...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 03/09/2022

Attachment 1 – City Council Resolution

ATTACHMENT 1 – PAGE 6 Wireless customers to an area that currently has none....of a new unmanned roof-mounted wireless telecommunication facility with three...

Last Modified: 10/18/2024

Rob Searcy - LALAX04397B AUP Application.pdf

adequate in size and shape to accommodate the use and are all of the yards, setbacks, walls...locatedRow2: wireless access to voice, data and E911 services for residents,...

Last Modified: 04/26/2024

20210701_921_Riverside_Dr_City_Response_Final.pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/27/2021

20210701_921_Riverside_Dr_City_Response_Final (1).pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/30/2021

20210701_921_Riverside_Dr_City_Response_Final (2).pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/30/2021

20210701_921_Riverside_Dr_City_Response_Final (3).pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/30/2021

2025 OCT FINALED

10/01/2025Permit Final Final Date:Permit Status: DEFERRED SUBMITTAL-PERFORATED PANEL...No structural, all walls to be non-bearing....Permit...

Last Modified: 11/03/2025

Final Submission - 4.10.25

UNIT DOOR SIZE GLAZE DUAL TEMP 24'-0" 1 3/4"1 WIDTH HEIGHT THK 2 EXTERIOR PANEL...DOORPAINTED1 3/4"2'-8"1 3 2'-8"2 PAINTED8'-0" 8'-0" 8'-0" 1 3/8" 6...

Last Modified: 07/15/2025

Final Submission

UNIT DOOR SIZE GLAZE DUAL TEMP 24'-0" 1 3/4"1 WIDTH HEIGHT THK 2 EXTERIOR PANEL...DOORPAINTED1 3/4"2'-8"1 3 2'-8"2 PAINTED8'-0" 8'-0" 8'-0" 1 3/8" 6...

Last Modified: 06/16/2025

20220901-FY-2022-23-Adopted-CIP

2,079,750 H-24 Day Ahead Planning and Resource Center 80,000 80,000 H-25 DC Panel...City of Burbank Project Information Sheet FY2022-23 BWP-Electric Utility DC...

Last Modified: 09/01/2022

3001 SB35 - Plans.pdf

1110 S.FSOLAR PANEL 1110 S.F 13 24 44 5'-5" 261'-4" 5'-8" 3 8' -5 " 6 2 '-...Solid Joint at trap-no access panel required....Solid Joint at...

Last Modified: 06/26/2023

2024-01-16_Thornton Planning Package

ROOF WIL BE A PANELIZED SYSTEM WITH MEMBRANE ROOFING....EAST EXTERIOR WALL HR. SOUTH EXTERIOR WALL HR....ANCHOR BOLTS...

Last Modified: 04/18/2024

2024-01-16_Thornton Planning Package23

ROOF WIL BE A PANELIZED SYSTEM WITH MEMBRANE ROOFING....EAST EXTERIOR WALL HR. SOUTH EXTERIOR WALL HR....ANCHOR BOLTS...

Last Modified: 01/13/2025

20210301_AvionPlansPart1_Avion.pdf

MTL-7 FLAT METAL PANEL MTL-8 LAP SEAM METAL PANEL PAINTED BLUE MTL-9 STEEL BEAM...CALCULATION VC-1.0 VECHICULAR,PEDESTRIAN/BICYCLE CIRCULATION...

Last Modified: 03/31/2021

2025 CALGreen Nonresidential Mandatory Measures

Water closets shall not exceed 1.28 gallons per flush (gpf) 5.303.3.1 Mandatory Wall-mounted...Mandatory Verification of compliance 5.504.4.7.1 Mandatory Acoustical...

Last Modified: 02/09/2026

2025 CALGreen Nonresidential Mandatory Measures

Water closets shall not exceed 1.28 gallons per flush (gpf) 5.303.3.1 Mandatory Wall-mounted...Mandatory Verification of compliance 5.504.4.7.1 Mandatory Acoustical...

Last Modified: 02/09/2026

1310 Evergreen St. - Project Plans - Revised.pdf

1316 N Evergreen St 25' 1" 1320 N Eve rgreen SI 25' 1" EXISTING Electrical Panel...1320 1324 N Evergreen St 26' O" 1328 N Evergreen S1 26' 4" -- (E) 5' HIGH...

Last Modified: 10/30/2023

510 Valencia Avenue Approved

OWNER OR CONTRACTOR SHALL INSTALL CUSTOMER SHUTOFF VALVE AT THE WATER METER OUTLET...FLOOR E3.4 POWER PLAN ROOF E5.1 SINGLE LINE DIAGRAM AND LOAD CALCULATIONS E5.2...

Last Modified: 08/11/2026

UpperLARiver_DraftEWMP_Jun.pdf

At this time, no Group members have elected to formally customize their MCMs, but...Customization may include replacement of an MCM for a more...

Last Modified: 03/25/2021

755 Whitnall Hwy_WTF PLANS

CONSISTS OF THE FOLLOWING: TOWER SCOPE OF WORK: CHURCH STEEPLE INSTALL (6) PROPOSED PANEL...GROUND FLOOR ELECTRICAL/TELCO ROOM AutoCAD SHX Text EXISTING METER BANK POWER...

Last Modified: 09/23/2024

2021_Planning_816 N Avon St Decision Letter (Signed).pdf

Length of walls are to include interior and exterior walls, including openings, and...The screening will include the electrical...

Last Modified: 07/20/2021

SR 2814 Empire Avenue staff report-FINAL.pdf

., which is a collector street West Custom manufacturing and commercial use East...including stucco and concrete base façade, dark brown vinyl window frame, metal...

Last Modified: 10/20/2022

SR 2814 Empire Avenue staff report-FINAL (1).pdf

., which is a collector street West Custom manufacturing and commercial use East...including stucco and concrete base façade, dark brown vinyl window frame, metal...

Last Modified: 10/20/2022

SR 2814 Empire Avenue staff report-FINAL (2).pdf

., which is a collector street West Custom manufacturing and commercial use East...including stucco and concrete base façade, dark brown vinyl window frame, metal...

Last Modified: 10/27/2022

HOO_SaferReturnWorkCommunity July 30 2021.pdf

• Clarifies that customers, guests, and patrons are not required to wear a face...Clear masks or cloth masks with a clear plastic panel that fit...

Last Modified: 08/02/2021

Attachment 1 - 2022.10.14 Attachment 1-Entitlements ResolutionV4.pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....Providing and installing new...

Last Modified: 10/21/2022

Haunted House Application

Haunted houses have several requirements to comply with fire regulations. See them here, and download the application.

Last Modified: 06/03/2026

2. Board of Building and Fire Code Appeals_Redacted.pdf

and Load bearing wall systems for light com- mercial and residential construction...2008 - Presentation on, UNA INTRODUC- CIÓN AL NUEVO SISTEMA CONSTRUC- TIVO DE...

Last Modified: 06/16/2022

20210519_504_Hampton_Road.pdf

IN OPERABLE PANELS OF DOORS, b....PANEL LOCATIONS: PANELS SHALL NOT BE LOCATED IN THE VICINITY OF EASILY...

Last Modified: 05/18/2021

ThePickwick_CompletePlanSet_2022-02-04.pdf

Panel Stucco Arch Low Tile Wall w/ Tile Cap (Barranca) Decorative Shutters with...Panel Stucco Arch Low Tile...

Last Modified: 03/01/2022

2919 Olney Pl - Project Plans.pdf

(R303.9) (E) WALL (N) WALL Notes Temp. Temp. Temp. Temp. Temp....(R303.9) (E) WALL (N)...

Last Modified: 08/04/2022

Exhibit A 3000 Empire Plan 122822.pdf

SOLAR PANEL ABS Properties, Inc....Solid Joint at trap-no access panel required....Solid Joint at trap-no access panel...

Last Modified: 05/02/2023

3000 SB35 - Plans.pdf

SOLAR PANEL ABS Properties, Inc....Solid Joint at trap-no access panel required....Solid Joint at trap-no access panel...

Last Modified: 06/29/2023

20201210.AdoptedCIP19_20.pdf

of pre-1980 constructed buildings with reinforced masonry or reinforced concrete walls...pre-1980 constructed buildings with reinforced masonry or reinforced concrete...

Last Modified: 12/10/2020

20230911-FY-2023-24-v.2-Adopted-CIP-Complete.pdf

FY 2024-25 BWP 800,000 800,000 H‐24 Direct Current Panel Upgrades BWP 100,000...-25 700,000 700,000 H‐24 Direct Current Panel Upgrades 100,000...

Last Modified: 09/11/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet