Search Results

Showing results for "dWA 0812 2782 5310 Biaya Borongan Railing Balkon Besi Bulat Murah Salam Kab Magelang"

No results were found that matched the keywords: dWA 0812 2782 5310 Biaya Borongan Railing Balkon Besi Bulat Murah Salam Kab Magelang.
Search Results

UpperLARiver_Draft_Appendix4b.pdf

• Miscellaneous metal items are damaged including railings, ladders, bar screens...• Upgrade railings and ladders. • Replace damaged bar...

Last Modified: 03/25/2021

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

(C) Placement and Rental of Street Safety Devices (1) K-Rail Rental- 10 ft $39.75...Per Month (2) K-Rail Rental- 20 ft $79.50 Per Month (3)...

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

(C) Placement and Rental of Street Safety Devices (1) K-Rail Rental- 10 ft $39.75...Per Month (2) K-Rail Rental- 20 ft $79.50 Per Month (3)...

Last Modified: 03/17/2026

Attachment 6 - City Comments

trellis structures that are not supported from below, parapet walls, opaque balcony railings...trellis structures that are not supported from below, parapet walls, opaque...

Last Modified: 11/19/2024

Attachment 6 - City Comments.pdf

trellis structures that are not supported from below, parapet walls, opaque balcony railings...trellis structures that are not supported from below, parapet walls, opaque...

Last Modified: 11/21/2024

Attachment 1 - 2022.10.14 Attachment 1-Entitlements ResolutionV4.pdf

Front entry stair rails should be integrated into the overall building and site design...Thin section wrought iron and stair rails that have...

Last Modified: 10/21/2022

Draft EIR.pdf

Project Rail NA NA ATTACHMENT 12 - 69 Table 4-1 [cont’d] Cumulative Projects...A “major transit stop” is defined as a site containing an existing...

Last Modified: 03/24/2022

Planning_2021_3700 Riverside Draft EIR.pdf

Project Rail NA NA Environmental Impact Report 3700 Riverside Drive...A “major transit stop” is defined as a site containing an existing...

Last Modified: 11/29/2021

20230911-FY-2023-24-v.2-Adopted-CIP-Complete.pdf

magnetic connectors to fire apparatus and ambulance diesel exhaust pipes, new rails...These barrier railings are currently substandard and carry...

Last Modified: 09/11/2023

20210401_3700RD_Initial_Study_Review_Draft.pdf

A “major transit stop” is defined as a site containing an existing rail transit...station, a ferry terminal served by either a bus or rail transit...

Last Modified: 04/12/2021

Planning_ 2021_ 3700 Riverside Appendix 11.1_ISNOP.pdf

A “major transit stop” is defined as a site containing an existing rail transit...station, a ferry terminal served by either a bus or rail transit...

Last Modified: 11/29/2021

Attachment 1 - 2024 GGRP Status Report and Addendum.pdf

T-1.2.c Apply for California Transit and Intercity Rail Capital Program (TIRCP)

Last Modified: 11/12/2024

Project_Plans (2)

podium, with flat stucco cap. 5'-6" High metal pool fence. 3'-0" High equestrian rail

Last Modified: 05/14/2024

ApxC2_PhaseIArchaeologicalResourcesReport.pdf

North of Vanowen Street, is the existing rail line, and Empire Avenue, which run

Last Modified: 07/09/2021

11/16/21 - PH - Attachment 9

transportation projects of all transportation modes: highways, streets and roads, transit, rail

Last Modified: 11/04/2021

3-1-22 - ED - Attachment 1_Redacted

Pier B Rail Yard Sanitary Sewer and Lift Station Design, Port of Long Beach (Wood

Last Modified: 02/04/2022

Pickwick Amended Tentative Map and Plans.pdf

Wood Truss Tails with 2x3 Wood Fascia Decorative Stucco Eave Decorative Metal Railing

Last Modified: 10/14/2022

420 S. Sunset Cny - Project Plans - STAMPED.pdf

., INC STYLE: CRL EGR Elevated Glass Railing System GLASS TYPE: TEMPERED SHOE COLOR

Last Modified: 11/20/2023

11/16/21 - PH - Attachment 20

Consolidated Rail Corporation and National Railroad Passenger Corporation d/b/a...Northeast Illinois Regional Commuter Railroad Corporation d/b/a METRA ...

Last Modified: 11/04/2021

ATTACHMENT 11.pdf

City is bisected by the Interstate 5 (I-5) Freeway and the Metrolink Commuter Rail...and investor-owned electric, natural gas, telecommunications, water, railroad,...

Last Modified: 09/16/2022

PP 08-2022.pdf

Park Senior Housing 1727 Morton Avenue Los Angeles 90026 310-475-6083 213-250-5310

Last Modified: 08/04/2022

PP 08-2022 (1).pdf

Park Senior Housing 1727 Morton Avenue Los Angeles 90026 310-475-6083 213-250-5310

Last Modified: 08/04/2022

PP 08-2022 (2).pdf

Park Senior Housing 1727 Morton Avenue Los Angeles 90026 310-475-6083 213-250-5310

Last Modified: 08/04/2022

09-2024 PROJECT PLACE.pdf

475-6083 Echo Park Senior Housing 1727 Morton Avenue Los Angeles 90026 213-250-5310

Last Modified: 09/13/2024

07-2024 PROJECT PLACE.pdf

475-6083 Echo Park Senior Housing 1727 Morton Avenue Los Angeles 90026 213-250-5310

Last Modified: 07/24/2024

LA County Affordable Housing Resources.pdf

475-6083 Echo Park Senior Housing 1727 Morton Avenue Los Angeles 90026 213-250-5310

Last Modified: 03/11/2025

09-2025 PROJECT PLACE.pdf

475-6083 Echo Park Senior Housing 1727 Morton Avenue Los Angeles 90026 213-250-5310

Last Modified: 10/06/2025

1901 Amber Lane - Project Plans.pdf

WITHIN 36" OF A WALKING SURFACE AS MEASURED HORIZONTALLY AND IN A STRAIGHT LINE IN RAILINGS

Last Modified: 07/25/2023

2/8/22 - PH - Attachment 1

than 18 inches in height at surface of deck (and less than six feet including railings

Last Modified: 01/27/2022

Attachment 1-V3-SP-IMcomments.pdf

than 18 inches in height at surface of deck (and less than six feet including railings

Last Modified: 01/27/2022

Exhibit B.pdf

less than 18 inches in height at surface of deck (and less than six feet including railings

Last Modified: 01/27/2022

Golden State Specific Plan, Open House!

housing near the Metrolink stations and the proposed high-speed rail

Last Modified: 06/12/2023

20201216.AdoptedBudget17_18.pdf

Complete work on the Golden State Specific Plan and High Speed Rail Station Area...Participate in regional planning efforts and projects including High Speed...

Last Modified: 12/16/2020

20210301_AppendixJTrafficImpactStud_Avion.pdf

These transit lines are described below and consist of Metrolink commuter rail,...These transit lines are described below and consist of Metrolink commuter...

Last Modified: 03/31/2021

Attachment 4..pdf

band - dark brown2 Smooth stucco - dark grey3 Smooth stucco - off white4 Aluminum rail...band - dark brown2 Smooth stucco - dark grey3 Smooth stucco - off white4 Aluminum...

Last Modified: 10/27/2022

2814 Empire Plans.pdf

band - dark brown2 Smooth stucco - dark grey3 Smooth stucco - off white4 Aluminum rail...band - dark brown2 Smooth stucco - dark grey3 Smooth stucco - off white4 Aluminum...

Last Modified: 10/13/2022

Attachment 4 (3).pdf

band - dark brown2 Smooth stucco - dark grey3 Smooth stucco - off white4 Aluminum rail...band - dark brown2 Smooth stucco - dark grey3 Smooth stucco - off white4 Aluminum...

Last Modified: 10/20/2022

Attachment 4 (4).pdf

band - dark brown2 Smooth stucco - dark grey3 Smooth stucco - off white4 Aluminum rail...band - dark brown2 Smooth stucco - dark grey3 Smooth stucco - off white4 Aluminum...

Last Modified: 10/20/2022

7-13-21 BCC - 4. Transportation Commission_Redacted.pdf

Burbank Bus service to Magnolia Blvd. retail district; improvement to Metrolink rail

Last Modified: 06/17/2021

Plans formal submittal #2_Part4

632.85TW AutoCAD SHX Text PER PLAN AutoCAD SHX Text 42"GUARD AutoCAD SHX Text RAIL

Last Modified: 11/14/2024

Plans formal submittal #2_Part4 (1).pdf

632.85TW AutoCAD SHX Text PER PLAN AutoCAD SHX Text 42"GUARD AutoCAD SHX Text RAIL

Last Modified: 11/14/2024

2/8/22 - PH - Attachment 2

than 18 inches in height at surface of deck (and less than six feet including railings

Last Modified: 01/27/2022

Attachment 2-V3-UPDATED.pdf

than 18 inches in height at surface of deck (and less than six feet including railings

Last Modified: 01/27/2022

EDGAR MARKOSYAN - 436 TUFTS AVE PLANS

ABOVE THE LANDING • GLAZING IN GUARDS AND RAILINGS • GLAZING ADJACENT TO STAIRWAYS

Last Modified: 06/30/2025

ApxK_Transportation Study.pdf

Existing Transit System The Project Study Area is served by a bus and rail public..., or heavy rail services linking Burbank’s employment ...

Last Modified: 07/09/2021

2024-01-16_Thornton Planning Package

GALVANIZED RAILING. 108. CONCRETE PAVEMENT. 109....TUBE STEEL RAILS 2" X 2" X 11 GA. STEEL POST AT 8'-0" 0.C. MAX.

Last Modified: 04/18/2024

2024-01-16_Thornton Planning Package23

GALVANIZED RAILING. 108. CONCRETE PAVEMENT. 109....TUBE STEEL RAILS 2" X 2" X 11 GA. STEEL POST AT 8'-0" 0.C. MAX.

Last Modified: 01/13/2025

Exhibit A (002)v3 FR comments (IJM edits).pdf

less than 18 inches in height at surface of deck (and less than six feet including railings

Last Modified: 01/27/2022

2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

Hollywood Way, as well as train noise generated from the Union Pacific Rail Road..., or heavy rail services linking Burbank’s employment and...

Last Modified: 09/10/2021

2021_Planning_2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

Hollywood Way, as well as train noise generated from the Union Pacific Rail Road..., or heavy rail services linking Burbank’s employment and...

Last Modified: 09/14/2021

2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

Hollywood Way, as well as train noise generated from the Union Pacific Rail Road..., or heavy rail services linking Burbank’s employment and...

Last Modified: 09/10/2021

FY 2021-22 Proposed Budget.pdf

  Reconfiguration  Project ‐ Phase 1   Olive/Magnolia  Bridge Safety  Barrier Rail...PROJECT FISCAL YEAR 2021-22 PROJECT TITLE Olive/Magnolia Bridge Safety Barrier...

Last Modified: 04/22/2021

FY 2021-22 Proposed Budget.pdf

  Reconfiguration  Project ‐ Phase 1   Olive/Magnolia  Bridge Safety  Barrier Rail...PROJECT FISCAL YEAR 2021-22 PROJECT TITLE Olive/Magnolia Bridge Safety Barrier...

Last Modified: 04/22/2021

3000 SB35 - Plans.pdf

PANELS - OFF WHITE/ TWO TONES 4 WOOD-LOOK FIBER CEMENT SIDING 5 METAL MESH BALCONY RAILINGS

Last Modified: 06/29/2023

526 S Sunset Cyn Approved Plans.pdf

SOLID WOOD HAVING STILES AND RAILS NOT LESS THAN 1-3/8-IN.

Last Modified: 04/05/2022

Exhibit A 3000 Empire Plan 122822.pdf

PANELS - OFF WHITE/ TWO TONES 4 WOOD-LOOK FIBER CEMENT SIDING 5 METAL MESH BALCONY RAILINGS

Last Modified: 05/02/2023

20201210.AdoptedBudget18_19.pdf

BurbankBus will add a stop at this new station and improve rail connectivity to...Complete work on the Golden State Specific Plan and High Speed...

Last Modified: 12/10/2020

Attachment 1 - Resolution - ALL EXHIBITS

trellis structures that are not supported from below, parapet walls, opaque balcony railings...trellis structures that are not supported from below, parapet walls, opaque...

Last Modified: 11/19/2024

Attachment 1 - Resolution - ALL EXHIBITS compressed

trellis structures that are not supported from below, parapet walls, opaque balcony railings...trellis structures that are not supported from below, parapet walls, opaque...

Last Modified: 11/19/2024

Attachment 1 - Resolution - ALL EXHIBITS compressed.pdf

trellis structures that are not supported from below, parapet walls, opaque balcony railings...trellis structures that are not supported from below, parapet walls, opaque...

Last Modified: 11/21/2024

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet