Search Results

Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo.
Search Results

Attachment 4 (4).pdf

Parking 20 1) 0' front yard instead of 15'-2"FLOOR 1 BRM 2 BRM 3 BRM TOTAL...Projects that generate a total combined weight of...

Last Modified: 10/20/2022

Attachment 6 – Final EIR for the Burbank Housing and Safety Element Update (State Clearinghouse No. 2021020393) Finding of Consistency

As shown in the Table 1, a net total of 2,442 additional units would be accommodated...the RHNA allocation by 1,239 units.1 Table 1 Projected Specific Plan Units ...

Last Modified: 11/27/2024

11-03-2020 Burbank Election Results BY COMMUNITY.pdf

CAST BY COMMUNITY JOB 2020 GENERAL ELECTION TO BE HELD 11/03/20 CITY OF BURBANK TOTAL...PRECINCTS 30 PAGE 13 REGISTRATION BALLOTS CAST ...

Last Modified: 03/10/2022

2025-2026 Afterschool Daze Payment Plans.pdf

2026 $190 $375 3/30, 4/6, 4/13, 4/20 4/25/2026 $190 $375 4/27, 5/4, 5/11, 5/18 Total...3/25/2026 $110 3/30, 4/6, 4/13, 4/20 4/25/2026 $110 4/27, 5/4, 5/11, 5/18 ...

Last Modified: 04/08/2025

20210701_921_Riverside_Dr_NOI_Final.pdf

of 10.2 percent of the total units being affordable....The total parking provided would be 221 spaces....of 10.2 percent of the...

Last Modified: 08/27/2021

BPAP PERMIT REQUIREMENTS

Provide Total Fixture Units. 4....Total number of existing fixtures. 2. Total number of new fixtures. c.

Last Modified: 11/19/2024

DRAFT Burbank Analysis of Impediments to Fair Housing Choice 2025-2029.pdf

Units % of Total Housing Stock 2010 or later 298 24 322 0.8% 2000–2009...Category Number / Status Total Deed-Restricted Affordable Units...

Last Modified: 05/09/2025

20210101_AB 987 Affordable Housing Database Website 2020.pdf

Expiration of Affordability Covenants Total...Expiration of Affordability Covenants Total...Expiration of Affordability Covenants ...

Last Modified: 05/20/2021

Council 12.10.2024 - SR-PH - CDD Housing Element Opportunity Sites Overlay Zone CCO edits

Overlay Zone (2021-2029 HEOS-OZ), the maximum residential density shall be the total...net units for that site as listed in the column titled “Proposed Specific Plan...

Last Modified: 11/27/2024

CDBG Capital Projects RFP FY 2025-26 FINAL.pdf

Organization  Community Based Development Organization Total...Extremely low: under 30% Very Low: 31% to <50% Low: 51% to <80% ...

Last Modified: 01/03/2025

20210401 - AB 987 Affordable Housing Database Website

Expiration of Affordability Covenants Total...Expiration of Affordability Covenants Total...Expiration of Affordability Covenants ...

Last Modified: 04/30/2021

General Multi-Family Residential Permit Application_11082024

If the project involves demolition and new construction, describe total project....separate exhibits 1 If the project involves demolition and new construction describe...

Last Modified: 11/12/2024

General Multi-Family Residential Permit Application_11082024 (1)

If the project involves demolition and new construction, describe total project....separate exhibits 1 If the project involves demolition and new construction describe...

Last Modified: 08/07/2025

General Multi-Family Residential Permit Application

If the project involves demolition and new construction, describe total project....separate exhibits 1 If the project involves demolition and new construction describe...

Last Modified: 09/16/2025

General Multi-Family Residential Permit Application_11082024 (1) (1)

If the project involves demolition and new construction, describe total project....separate exhibits 1 If the project involves demolition and new construction describe...

Last Modified: 10/16/2025

UpperLARiver_Draft_Appendix4b.pdf

Total zinc was determined to be the limiting pollutant, indicating that if total...$7,644,870 19 Design (10% of Construction...

Last Modified: 03/25/2021

Medical Service Order.docx

to return to Full Duty as of |_| Able to return to Light Duty on |_| Temporarily Totally...duration of limited duty available. ) ( 4. ) ( If the doctor places the employee...

Last Modified: 02/12/2021

20210101_AB1482 Applicability Tool

SUBTRACT (-) One point for yes Do you live in multifamily housing One point for yes Total...Points 0 If total points equals 2, then go onto the...

Last Modified: 05/20/2021

HIghlightedClassRegistration.pdf

Date M/F Class Name Day Time Site Start Date Fee $ $ $ $ $ OFFICE USE ONLY Total...Activity fees $ Date: Non-resident fees (number of classes x $10) $ Receipt #:...

Last Modified: 11/18/2022

Attachment 2 - HOME Investment Partnership Program American Rescue Plan - City of Burbank Allocation Plan.pdf

Older adults aged 65 and above totaled 16....A total of 3,013 were unsheltered....TOTAL * 19.

Last Modified: 03/16/2023

20220401_Draft_ Annual_Action_Plan_for_Fiscal_Year_2022.pdf

The match requirement of 25 percent of the total HOME funds drawn down for projects...Total Persons Assisted 25 5 unduplicated people 6 ...

Last Modified: 04/01/2022

FY 2024-25 CDBG Annual Action Plan.pdf

Total Persons Assisted 25 5 unduplicated people 6 Preserving Affordable...Older adults aged 65 and above totaled...

Last Modified: 05/15/2024

FY 24-25 Annual Action Plan.pdf

Total Persons Assisted 25 5 unduplicated people 6 Preserving Affordable...Older adults aged 65 and above totaled...

Last Modified: 07/22/2024

Draft Fiscal Year 2023-23 Annual Action Plan.pdf

The match requirement of 25 percent of the total HOME funds drawn down for projects...Total Persons Assisted 25 5 unduplicated people 6 ...

Last Modified: 04/26/2023

PC SUBMITTAL DESIGN PACKAGE- CUP FOR INCREASE IN HEIGHT- 220621.pdf

TOTAL: 21,881 S.F....TOTAL PARKING LOT AREA: 4,016 S.F....TOTAL SHADED PARKING LOT AREA: 49% ...

Last Modified: 07/07/2022

Exhibit C - Project Plans.pdf

TOTAL: 21,881 S.F....TOTAL PARKING LOT AREA: 3,751 S.F....TOTAL SHADED PARKING LOT AREA: 50% ...

Last Modified: 07/18/2022

Planning_2021_ 929 E San Jose Project Plans.pdf

FAR: 7,500 X .40 = 3,000 SF 1,493.75 x 0.3 = 448.125 SF TOTAL: 3,000 + 448.125 =...LENGTH: 270.03 TOTAL DEMO WALL LENGTH: V7= 11.66 V8= 10.75...

Last Modified: 12/07/2021

Attachment 2 - Redline Ordinance_markup.pdf

Attachment 2 - 6 GROSS FLOOR AREA or GFA: Shall mean the total horizontal area...Attachment 2 - 7 PM PEAK HOUR TRIPS: Means the total...

Last Modified: 05/26/2022

20260422-DIFA2-001.pdf

AFFORDABLE OWNERSHIP HOUSING COST: Means the Total Housing Costs paid by a qualifying...TOTAL HOUSING COSTS: Means the...

Last Modified: 04/23/2026

17-28,915 Primary Nominating Election Results 2017.pdf

Council EXHIBIT A Springer Carr Talamantes Sousa Frutos Guillen Anthony Gordon Total...158 134 196 512 180 192 48 210 106 222 148 105 218 482 VBM 6 4 10 8 7 9 7 12 23...

Last Modified: 02/11/2021

910 Mariposa - Response to Incomplete Letter - 6-16-23.pdf

and the new construction of six three-story residential structures, containing a total...of 23 for-sale townhomes ranging from 1,329 to 2,030 square feet in size and a...

Last Modified: 07/07/2023

Attachment 1 - DIF Fee Ordinance.pdf

Attachment 1 - 4 AFFORDABLE OWNERSHIP HOUSING COST: Means the Total Housing Costs...TOTAL HOUSING COSTS: Means the...

Last Modified: 05/26/2022

1625 Thurber Place - SFSDP & HDP - Project Plans FINAL.pdf

TOTAL FRONT YARD AREA: 1680.0 S.F. PR. LANDSCAPING: 644.00 S.F. PR....TOTAL 2ND FLOOR: 1790.32 S.F. COVERED PATIO G. 79.00...

Last Modified: 01/03/2023

20210622_NOI_2814_Empire_Ave_Final.pdf

2 2 11 SF PER UNIT 450 SF MIN 700 SF MIN 900 SF MIN 1 Bed 2 Bed 3 Bed Total...Units 2814 W Empire - Unit Matrix TOTAL UNIT AREA: ...

Last Modified: 08/27/2021

20260422-DIFA1-001.pdf

GROSS FLOOR AREA or GFA: Shall mean the total horizontal area of all floors beneath...TOTAL HOUSING COSTS: Means the...

Last Modified: 04/23/2026

Treasurer's Report September 2018.pdf

8,590,000 8,571,380 Housing Authority 500,000 500,000 498,916 TOTAL...to Three Years 187,830 42% 0 to 50% Three to Five Years 125,496 28% 0 to 50% ...

Last Modified: 03/09/2021

Public Notice- 3031 Thornton Ave - DR (updated)

The project also includes a proposed 97 total parking stalls....The project also includes a proposed 97 total parking stalls.

Last Modified: 04/18/2024

622 East Tujunga Ave - Mailing Notice (Final)

applicable given that the project consists of a multi-family residential structure, totaling...applicable given that the project consists of a multi-family residential...

Last Modified: 02/11/2025

618 East Tujunga Ave - Mailing Notice (Final)

applicable given that the project consists of a multi-family residential structure, totaling...applicable given that the project consists of a multi-family residential...

Last Modified: 02/11/2025

Public Notice- 3031 Thornton Ave - DR (updated)23

The project also includes a proposed 97 total parking stalls....The project also includes a proposed 97 total parking stalls.

Last Modified: 01/13/2025

3407 Viewcrest Dr - HDP - Public Notice.pdf

an 80 square foot first floor addition on the east side of the residence with a total...an 80 square foot first floor addition on the east side of the residence with a...

Last Modified: 05/10/2023

2018 W Burbank Blvd - CUP - plans

TOTAL: 1,800 SQ.FT....SEATING: INDOOR SEATING: 50 SEATS OUTDOOR SEATING: 16 SEATS TOTAL: 56 SEATS

Last Modified: 01/29/2024

622 East Tujunga Ave - Decision Mailing Notice (Final)

applicable given that the project consists of a multi-family residential structure, totaling...applicable given that the project consists of a multi-family residential...

Last Modified: 06/18/2025

618 East Tujunga Ave - Decision Mailing Notice (Final)

applicable given that the project consists of a multi-family residential structure, totaling...applicable given that the project consists of a multi-family residential...

Last Modified: 06/18/2025

618 East Tujunga Ave - Updated Decision Mailing Notice

applicable given that the project consists of a multi-family residential structure, totaling...applicable given that the project consists of a multi-family residential...

Last Modified: 09/18/2025

622 East Tujunga Ave - Updated Decision Mailing Notice

applicable given that the project consists of a multi-family residential structure, totaling...applicable given that the project consists of a multi-family residential...

Last Modified: 09/18/2025

COMMERCIAL APPLICATION

INDUSTRIAL (F) MIXED USE RETAIL (M) HAZARD COMMERCIAL REROOF TYPE OF ROOF TOTAL...EXISTING BUSINESS NAME: NEW BUSINESS NAME: SQUARE FOOTAGE: HAZARD: Off ...

Last Modified: 03/26/2026

Updated_Preliminary_Hydrology_Report.pdf

2.2.6 Impervious Cover The proposed project will have a net increase in total...The proposed residential development project will increases the site’s overall...

Last Modified: 10/29/2024

Updated_Preliminary_Hydrology_Report (1).pdf

2.2.6 Impervious Cover The proposed project will have a net increase in total...The proposed residential development project will increases the site’s overall...

Last Modified: 10/29/2024

Preliminary_Hydrology_Report_second page

2.2.6 Impervious Cover The proposed project will have a net increase in total...The proposed residential development project will increases the site’s overall...

Last Modified: 05/14/2024

Preliminary_Hydrology_Report.pdf

2.2.6 Impervious Cover The proposed project will have a net increase in total...The proposed residential development project will increases the site’s overall...

Last Modified: 01/11/2024

2025 DEC ISSUED

TOTAL SF: 5000....TOTAL SF:6500....TOTAL SF:800.

Last Modified: 01/02/2026

536 Plan Set.pdf

TOTAL MAX S.F. = 4,067.1 S.F. PROPOSED: 4,065.57 S.F....TOTAL PROPOSED LOT COVERAGE: 2,658 S.F....TOTAL MAX...

Last Modified: 11/08/2022

536 Stanford Rd_Approved Plans.pdf

TOTAL MAX S.F. = 4,067.1 S.F. PROPOSED: 4,065.57 S.F....TOTAL PROPOSED LOT COVERAGE: 2,658 S.F....TOTAL MAX...

Last Modified: 12/01/2022

4007 Riverside Drive - plans.pdf

FT_ 15% OF TOTAL TENA�'T -SPACE 1.475 SQ. FT. x 0.15 • 2"21.25 SQ....FT. 1.S% OF TOTAL TENAITT SPACE 1,47E SQ. FT. x 0.16"' 221.26...

Last Modified: 05/10/2023

SR - PD-96 Extension - 01.30.2024 FINAL.pdf

not extended, the DA will expire on March 19, 2024; approximately 66.4% of the total...approved seven-year DA extension, approximately 566,046 additional OE- GSF of the...

Last Modified: 01/18/2024

Attachment 1, Exhibit B - Consistency Matrix

Of this total, approximately 521.01 square feet (28%) is landscaped....feet and the total area of roof decks to be 7,031.2 square...

Last Modified: 11/19/2024

Treasurer's Report March 2018.pdf

2,424,000 2,424,000 2,418,032 Housing Authority 496,668 496,668 495,445 TOTAL...Market -0- 0% 20% 15% 0% Municipal Bonds 39,603 9% No limit 15% 3% ...

Last Modified: 03/09/2021

Treasurer's Report June 2018.pdf

Market -0- 0% 20% 15% 0% Municipal Bonds 42,021 9% No limit 15% 3% TOTAL...to Three Years 150,620 33% 0 to 50% Three to Five Years 176,396 38% 0 to 50% ...

Last Modified: 03/09/2021

CDBG Capital Projects RFP FY 2024-25 FINAL.pdf

Organization  Community Based Development Organization Total...Extremely low: under 30% Very Low: 31% to <50% Low: 51% to <80% ...

Last Modified: 10/21/2024

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet