Search Results

Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo.
Search Results

SR - Section 8 Five-Year Plan Admin Plan - FINAL(2)

Applied for and received a total of 15 Veteran Affairs Supportive Housing (VASH)...In the last five years, a total of four participants...

Last Modified: 03/27/2025

SR - Section 8 Five-Year Plan Admin Plan - FINAL(2) (1)

Applied for and received a total of 15 Veteran Affairs Supportive Housing (VASH)...In the last five years, a total of four participants...

Last Modified: 03/27/2025

2025 Sept Cal W Caucus FA

Last Modified: 07/28/2025

5-3 - PH Attachment 1

The total proportion of passenger VMT to total VMT in the City was used to estimate...Total City GGRP Update Emissions...

Last Modified: 04/21/2022

Attachment 1 - Exhibit 1 GGRP Update Draft_3.9.2022_wAPPS_PublicReview_reduced size.pdf

The total proportion of passenger VMT to total VMT in the City was used to estimate...Total City GGRP Update Emissions...

Last Modified: 04/21/2022

521 Amherst Dr - Mailing Notice.pdf

high along the front yard area to eight-feet high beyond the front yard for a total...high along the front yard area to eight-feet high beyond the front yard for a...

Last Modified: 07/13/2022

20201221-AUP-report-Measure-P-Sales-Tax Funds-FY-June-30-2020.pdf

As shown below, the total Non-Measure P revenue designated for infrastructure projects...reported by the California Department of Tax and Fee Administration on their...

Last Modified: 12/21/2020

FD9141 Haunted House Safety Requirements and Application

shall indicate proximity of event building to other structures or • Dimensions (total...Exception: When the total floor area is less than 1000...

Last Modified: 10/20/2025

2025 SEPT ISSUED

TOTAL SF:4000....TOTAL SF:5600....TOTAL SF:5600.

Last Modified: 10/06/2025

2021

Cafeteria Plan Other Pay and Cash Benefits Leave Payouts at Time of Separation Total...Cafeteria Plan Other Pay and Cash Benefits Leave Payouts at Time of...

Last Modified: 02/28/2022

Treasurer's Report March 2019.pdf

22% Money Market -0- 0% 20% 20% 0% Municipal Bonds 50,038 11% No limit 15% 3% TOTAL...to Three Years 217,082 46% 0 to 50% Three to Five Years 88,156 19% 0 to 50% ...

Last Modified: 03/09/2021

05.15.24_636 MARIPOSA_ISSUE FOR PLAN CHECK

1033,40 PLANE BREAK OFFSET - G3 TOTAL SIDE 20,42 AVERAGE SETBACK 50,61 3 3 3,00...COMMON OPEN SPACE 50 SF TOTAL: 300 SF 100 SF PRIVATE SPACE ...

Last Modified: 05/30/2024

Burbank2035 EIR Appendix F, Part 2.pdf

Table 2 presents a land use totals comparison table....[a] 25,863 31,193 31,193 31,193 31,193 34,835 Total D.U. D.U....A...

Last Modified: 07/29/2021

2025 NOV ISSUED

TOTAL SF:1000....TOTAL SF:7900....TOTAL SF:900.

Last Modified: 12/01/2025

Updated_Objective_Standards_Consistency_Matrix.pdf

In the Formal Application, the project proposes 45 total parking spaces for 40...Five percent of the total units of the Housing Development as...

Last Modified: 10/29/2024

Updated_Objective_Standards_Consistency_Matrix (1).pdf

In the Formal Application, the project proposes 45 total parking spaces for 40...Five percent of the total units of the Housing Development as...

Last Modified: 10/29/2024

Objective_Standards_Consistency_Matrix

In the Formal Application, the project proposes 47 total parking spaces for 40...The Project is proposing to set aside 15% of the unit total for...

Last Modified: 05/14/2024

Att3 - Management District Plan

Budget: The total BTBID annual assessment budget for the initial year of its ten...• Welcomed Hilton Garden Inn, bringing Burbank’s hotel total to...

Last Modified: 11/06/2025

GGRP Update Final_w.App.pdf

Table 5 – Total Daily VMT by TAZ Figure 2 – Year 2018 Percentage of Total...The total proportion of passenger VMT...

Last Modified: 10/23/2022

Exhibit A - 1 - GGRP Update Draft_3.9.2022_wAPPS_PublicReview.pdf

The total proportion of passenger VMT to total VMT in the City was used to estimate...Total City GGRP Update Emissions...

Last Modified: 03/10/2022

GGRP Update Final_w.App

Table 5 – Total Daily VMT by TAZ Figure 2 – Year 2018 Percentage of Total...The total proportion of passenger VMT...

Last Modified: 11/13/2025

Attachment 1 - Resolution with Exhibits A-F -FINAL..pdf

TOTAL PROVIDED OPEN SPACE TOTAL LANDSCAPE/PEREMABLE AREA IN THE FRONT/SIDE YARD...SETBACK TOTAL O.S....ROOF DECKS) ...

Last Modified: 12/26/2023

2026 MAY ISSUED

TOTAL....TOTAL SF:2900....TOTAL SF:1900.

Last Modified: 06/15/2026

20210101_1258_E_Elmwood_ProjectPlans.pdf

SEVERITY ZONE VT VINYL TILE W WIDTH, WIDE, WEST, WIDE FLANGE W/ WITH WB WOOD BASE WC

Last Modified: 04/13/2021

Treasurer's Report December 2018.pdf

779,000 778,261 Housing Authority 500,000 500,000 499,526 TOTAL...to Three Years 204,445 44% 0 to 50% Three to Five Years 109,484 24% 0 to 50% ...

Last Modified: 03/09/2021

SoCalGas Press Release: 2023 Restaurant Resilience Grants Soon to be Available for Central and Southern California Independent Restaurants

making $5,000 grants available to 177 restaurants in SoCalGas’ service area, with a total...Together, this brings this year’s fund total to $2.1...

Last Modified: 04/13/2023

529-537 E Palm Ave - Public Notice - Community Meeting_final.docx

The residential parking would be provided in a subterranean-level parking garage (total...The residential parking would be provided in a subterranean-level parking garage...

Last Modified: 02/02/2023

800 S Main Street - Public Notice 5.14.24.pdf

The proposed WTF is comprised of a total of six antennas with accessory equipment...The proposed WTF is comprised of a total of six antennas with...

Last Modified: 06/05/2024

1018 N Sunset St_HDP_Public Notice Letter_Final

The Project proposes to exceed 16- feet in height and will result in a total gross...The Project proposes to exceed 16- feet in height and will result in a...

Last Modified: 03/04/2025

5-25-21 PH - Attachment 1 - City Budget FY 2021-22 - 5.25.21.pdf

other revisions, individual appropriation line-items, changes in summaries, fund totals..., grand totals, and other portions of the budget...

Last Modified: 05/13/2021

2021526_2311 N. Hollywood Way_Mailing Notice.pdf

in a five (5) story building and two separate ground floor commercial spaces totaling...in a five (5) story building and two separate ground floor commercial spaces ...

Last Modified: 05/26/2021

2021526_2311 N. Hollywood Way_Mailing Notice (DR).pdf

in a five (5) story building and two separate ground floor commercial spaces totaling...in a five (5) story building and two separate ground floor commercial spaces ...

Last Modified: 05/26/2021

529-537 E Palm Ave - Public Notice - Community Meeting_final.pdf

The residential parking would be provided in a subterranean-level parking garage (total...The residential parking would be provided in a subterranean-level parking garage...

Last Modified: 11/16/2023

Low_Income_Payment_Plan_Form.pdf

service fees in monthly installments of no more than twenty-five dollars ($25) for total...assessments waived pursuant to subclause (II) shall not be counted in...

Last Modified: 09/16/2025

20230228-Single-Audit-Report-June-30-2022.pdf

State of California: COVID-19 Coronavirus Relief Funds 21.019 N/A 10,180 Total...Angeles: Homeland Security Grant Program 97.067 UASI C-129267 104,559 - ...

Last Modified: 04/05/2023

SR - 910 S Mariposa.pdf

and the new construction of six three-story residential structures, containing a total...townhomes ranging from 1,178 to 1,689 square-feet in 2 size and a...

Last Modified: 03/20/2023

SR - 910 S Mariposa.pdf 1

and the new construction of six three-story residential structures, containing a total...townhomes ranging from 1,178 to 1,689 square-feet in 2 size and a...

Last Modified: 06/26/2023

Waste Reduction Rebate Program Application (Armenian)

_______________________ Determination of Application: _____________________ Total...Resident (not Qualified with SOS) Government Partnership Performs services...

Last Modified: 04/14/2026

Waste Reduction Rebate Program Application (English)

_______________________ Determination of Application: _____________________ Total...Resident (not Qualified with SOS) Government Partnership Performs services...

Last Modified: 04/14/2026

201 E Magnolia Blvd_Plans

IMPORTANT NOTICE: TOTAL FLOOR LAYOUT TO BE INITIALLY "CHAULK DRAWN" TO MATCH DRAWING...Wang Typewriter To Food Court Tiffany Wang Textbox 275 Sq.Ft Bar Area 0.66% of...

Last Modified: 03/28/2024

2025 Grading Shoring Correction List

(One copy required) Grading Bond (>250 CY total cut and fill in the hill area,...>500 CY total cut and fill in other...

Last Modified: 05/28/2026

755 Whitnall Hwy_WTF PLANS

WEATHERHEAD TOTAL DISTANCE = 75'-0" AutoCAD SHX Text (N) AERIAL POWER RUN TO (N)...POWER AND FIBER RUN FROM (N) METER AT MPOE AT GROUND LEVEL...

Last Modified: 09/23/2024

526 S Sunset Cyn Approved Plans.pdf

TOTAL GARAGE (AFTER ADDITION) : 630 SQ. FT. (500 S.F. EXEMPT) TOTAL EXIST'G....OVERALL TOTAL DEMOLITION = 66.25' /...

Last Modified: 04/05/2022

840 E Verdugo - Plans

: TOTAL FRONT YARD AREA : 58.97' X 25.75' = 1518 SQ.FT....BY OWNER TOTAL CEMENT PLASTER THICKNESS TO BE 7/8". 6....50 = 8.1 1 S4 )T ...

Last Modified: 08/18/2022

2022.pdf

Plan Other Pay and Cash Benefits Leave Payouts at Time of Separation Total...Plan Other Pay and Cash Benefits Leave Payouts at Time of Separation ...

Last Modified: 01/27/2023

20220622-BurbankTransportationStudyGuidelines-001.pdf

The project consists of one or more neighborhood-serving retail uses that total 50,000...less than 50,000 s.f.), the SCAG Travel Demand Model shall be used to compare...

Last Modified: 06/22/2022

20240709-TransportationStudyGuidelinesUpdate-001.pdf

The project consists of one or more neighborhood-serving retail uses that total 50,000...Mixed Use For mixed-use projects, VMT per capita or total...

Last Modified: 07/09/2024

20210301_AvionPlansPart3_Avion.pdf

/ RETAIL / HOTEL: (TREES AT 5 YEARS MATURITY) = 107,894 S.F. (50%) TOTAL AREA...1-6 TOTAL SHADED AREA INDUSTRIAL BUILDINGS 1-6: (TREES AT 5...

Last Modified: 03/31/2021

Attachment 6 - City Comments

Of this total, approximately 521.01 square feet (28%) is landscaped....feet and the total area of roof decks to be 7,031.2 square...

Last Modified: 11/19/2024

Attachment 6 - City Comments.pdf

Of this total, approximately 521.01 square feet (28%) is landscaped....feet and the total area of roof decks to be 7,031.2 square...

Last Modified: 11/21/2024

ApxA3_AirportandRailwayHealthRiskAssessment.pdf

A total of six freight trains were observed in 24- hours, four between the hours...Notch 2 (11.5% of the total horsepower) was used for trains...

Last Modified: 07/09/2021

20210101_Planning_Standard_Plan_Details.pdf

Required Parking (calculations and total). g....Total number of dwelling units. 10....Show total height of structure on...

Last Modified: 03/29/2021

20210101_Planning_Conditional_Use_Permit_Standard_Plan_Detail.pdf

Required Parking (calculations and total). g....Total number of dwelling units. 10....Show total height of structure on...

Last Modified: 03/29/2021

Planning_2021_STANDARD PLAN FORMATTING 2022 final.pdf

Required Parking (calculations and total). g....Total number of dwelling units. 10....Show total height of structure on...

Last Modified: 01/26/2022

Att1 – Staff Report for Resolution of Intention from September 9, 2025

received signed petitions (Attachment 2) from 14 hotels, representing 91.33% of the total...SERVICES PROVIDED PERCENTAGE TOTAL Sales and...

Last Modified: 10/02/2025

Attachment A- Magnolia Park ER (1).pdf

Lot Square Footage is defined as the total amount of area within the borders of...(a) Magnolia Park PBID March 2025 Engineer’s Report Page 11 of 21 ...

Last Modified: 03/11/2025

Attachment A- Magnolia Park ER .pdf

Lot Square Footage is defined as the total amount of area within the borders of...(a) Magnolia Park PBID March 2025 Engineer’s Report Page 11 of 21 ...

Last Modified: 03/11/2025

CLEAN-Film-Permit-Rules-and-Regulations-3-2021_compressed.pdf

ON PREP/STRIKE DAYS: PERSONNEL TOTALS CAST & CREW TOTALS: PREP/STRIKE CREW...TOTALS: EXTRAS/BACKGROUND...

Last Modified: 09/04/2025

20260423-DIFSOrdinance-001.pdf

GROSS FLOOR AREA or GFA: Shall mean the total horizontal area of all floors beneath...HOUSING COSTS: Means the total monthly or annual recurring...

Last Modified: 04/23/2026

20260423-DIFSRA1-001.pdf

GROSS FLOOR AREA or GFA: Shall mean the total horizontal area of all floors beneath...HOUSING COSTS: Means the total monthly or annual recurring...

Last Modified: 04/23/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet